Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus

Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus. Wisconsin EDC Round 1. Shortening Project Delivery. Accelerating Technology and Innovation Deployment. Wisconsin EDC Round 1 Shortening Project Delivery. Planning and Environmental Linkages

bela
Télécharger la présentation

Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wisconsin DOT EDC InitiativesRory Rhinesmith, P.E.Deputy Administrator – DTSD Bureaus

  2. Wisconsin EDC Round 1 • Shortening Project Delivery • Accelerating Technology and Innovation Deployment

  3. Wisconsin EDC Round 1Shortening Project Delivery • Planning and Environmental Linkages • Legal Sufficiency Enhancements • Expanding Use of Programmatic Agreements • Clarifying the Scope of Preliminary Design • Flexibilities in Utility Accommodation and Relocation

  4. Wisconsin EDC Round 1Accelerating Technology and Innovation Deployment • Warm Mix Asphalt • Safety Edge • Geo-synthetic Reinforced Structures • Prefabricated Bridge Elements & Systems • Adaptive Traffic Control Systems

  5. Wisconsin EDC Round 2 Fall Summits Spring Virtual Summits Reducing Project Delivery Time • Programmatic Agreements • Locally Administered Projects Reducing Construction Time • 3D Modeling for Construction Means and Methods • Accelerated Bridge Construction • Intelligent Compaction Innovative Contracting • Design-Build • CM/GC • Alternative Technical Concepts Reducing Project Delivery Time • Geospatial Data Collaboration Safety • High Friction Surfaces Environment • Level of NEPA Documentation Mobility • First Responders Training