December 10, 2009. Review of traffic findings & recommendations Bridge concepts Alignments considerations Next steps. Traffic forecasting methodology Traffic findings Traffic recommendations. Traffic Forecasting Methodology. Based on 2008 Counts as Baseline

belden
Télécharger la présentation

December 10, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. December 10, 2009

  2. Review of traffic findings & recommendations • Bridge concepts • Alignments considerations • Next steps

  3. Traffic forecasting methodology • Traffic findings • Traffic recommendations

  4. Traffic Forecasting Methodology • Based on 2008 Counts as Baseline • Growth Based on ARC 2005 and 2030 Regional Model • Changes to Travel Patterns Based on ARC 2030 Model • Looks at Regional Flow of Traffic

  5. 2005 ADT on HBR ≈ 40,000 – 80,000 • 2030 ADT on HBR ≈ 50,000 – 100,000 • 30% increase in ADT until 2030 (Growth Rate ≈ 1.05 per year)

  6. Similar ADTs with 2 or 4 lane OAR • Location of bridge impacts ADT (north vs. south) • Design year traffic between 10 to 12K ADT • BCBR Does Not Attract More Thru Traffic • Serves as By-Pass to SR 400 Interchange • Local connectivity within Roswell (economic benefit) • Redistribution of intra-city traffic • Minor redistribution of regional traffic • Attracts minimal additional regional traffic

  7. Significant impact & cost • Impact to existing business • Cost to widen existing roadway & bridge • Does not support alternative modes • Attracts regional thru traffic • Provides less capacity (6 +2 > 8) • 8 lane ≈ 64,000 (at LOS D) • 6 lane plus 2 lane ≈ 69,000 (at LOS D) Recommendation #1Build Big Creek Bridge Road

  8. Traffic forecasts support 2 lane roadway • Other bridge crossings along SR 400 are 2 lanes • Minimize residential & environmental impacts • Consistent with Transportation Master Plan

  9. Small traffic increase if connected to Houze Rd • ADT Increase = 500 – 1,000 • Provides access to north & south • Connects to HBR at 3 locations • Warsaw Rd can accommodate additional ADT • Consistent with Transportation Master Plan • Reduce impacts to single family residential

  10. Build BCBR • 2 Lane BCBR • Terminate at Warsaw Road

  11. Create Sense of Place within bridge area • Invite Pedestrian and Bicycle Traffic • Remove SR 400 “Barrier” • Attractive View From BCBR and SR 400 • Ped/Bike =23 ft Car = 22 ft

  12. Aerial View From SR 400 View from Roadway Pedestrian View

  13. Alignment Considerations • Environmental • Neighborhood impacts • System connectivity • Access to public facilities • Development and redevelopment potential • Consistency with Roswell Transportation Master Plan

  14. Single Family Residences Wetlands & Streams Apartments Georgia Power Line Easement Townhomes & Apartments Big Creek Park New Townhomes Kimberly Clark Master Plan

  15. City Council direction/concurrence • Preferred Alternative(s) • Continued coordination • Inter-Departmental • External Stakeholders • Refine preferred alternative(s) • Finalize Environmental Screening • Preliminary ROW & Construction Cost Estimates • Develop programming and funding strategy • Limited traditional funding sources • Look at other funding sources • Final documentation for current phase

  16. Continued Coordination • City of Roswell Departments • Kimberly Clark • Apartment Complexes • Belcourt Apartments • Aspen Pointe Apartments • Roswell Creek Apartments • Public Meeting • Old Alabama Road Consultant Team • Other Stakeholders • NFCID • GDOT • ARC/SRTA/MARTA • City of Alpharetta