An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hall D Organizational Chart

  2. Hall D Manpower General Strategy • Create a Hall D group, with scientists located in Physics Division, consisting of: • One Hall D Leader • One Hall D Engineer 1 Re-assigned from Engineering Div. • Two Hall D Designers 1 Re-assigned from Engineering Div., • 1 TBD • 4) One Technician 1 Re-assigned from Detector Group • 5) Five Hall D Scientists 1 Detector Work Coordinator • 1 Detector Specialist, • Matrixed from Halls A/C or new hire • 1 Computing Work Coordinator, • Re-assigned from DAQ Group • 1 Off-Line Software Specialist • 1 Electronics Work Coordinator, • new-hire or matrixed from Halls A/C • 6) One Senior Postdoc Acts as Beam Line Work Coordinator • 7) 0.25 Electrical Engineer Matrixed for 2007 from Hall C, acts as • Infrastructure Work Coordinator • In addition, use Physics Division “MESON” funds for • a) engineering of SC solenoid cryogenics interface • b) implementation of SC magnet controls (aided by Hall C staff) • c) support of TDC, Flash-ADC electronics design • d) support of Scientific Efforts Time of Hall D Scientists

  3. Hall D Organizational Chart a Engineering & Design, reassigned from Engineering Group b Reassigned from Hall B c Reassigned from DAQ Group d 1 FTE Reassigned from Hall A/C, “1 FTE” from 12 GeV funds (50%) e Senior Postdoc (50% research) f 0.25 FTE Matrixed from Hall C g Reassigned from Detector Group GlueX Executive Group (EG) Spokesperson: Alex Dzierba Deputy Spokesperson: Curtis Meyer GlueX Collaboration Board (CB) Chair: George Lolos Hall D Group Leader/ Project Manager Elke Aschenauer Detectors Elton Smithb Curtis Meyer Computing Elliott Wolinc TBD Electronics New Hired TBD Beamline Simon Taylore Richard Jones Infrastructure Joe Beaufaitf Magnet + Engineering Tim Whitlatcha Tracking Simon Taylor DAQ Elliott Wolin FADC Tagger Magnet Design Chuck Huttona TBDa Technical Staff Brian Krossg Online Calorimetry TDC Hodoscope Beam Line Trigger Offline Dave Lawrence Particle Id Re-Assignedd Only 12 GeV Technical work will be charged against the 12-GeV Costbook. Research paid from Physics Division “Hall D” funds Calib. Monitor Aux. Electronics

  4. Hall D Science Group F381 Elke Aschenauer Group operates from within the Physics Division, charging their 12-GeV related technical and coordinating work to the 12-GeV costbook, and their scientific work to the Hall D and accounts within the Physics Division for their Research work and any non-technical scientific work. Physics Division pays for all science-related travel, 12-GeV Costbook for project-related travel. F380 Simon Taylor F379 Elton Smith F378 David Lawrence F377 Computing Coordinator F376 Electronics Coordinator F375 University of Regina • Need one office for Detector Specialist, or keep Computing Coord. in present office

  5. Best Guesses of Hall D Manpower Time Split (FY07) S 3.15 -0.15 Note: If a Science Number is larger than 0.25 FTE, it reflects both research time and time spent on scientific issues related to Hall D

  6. In the Hall D 12-GeV Staffing Plan there are funds for: • 3 scientists • 0.5 engineer • 1 designer • procurements • One full-time engineer and two designers is a must for a new Hall. • With the chosen solution we free up 0.85 scientists from the 12-GeV Costbook, essentially creating funds for an additional 0.5 engineer and 0.5 designer. The last “D” must come from a procurement reshuffle.

  7. Physics Division Org. Chart Physics Division Larry Cardman Dennis Skopik Hall A Kees de Jager Hall B Volker Burkert Hall C Steve Wood Hall D Elke Aschenauer Support Groups Latifa Elouadhriri Existing Staff (some matrixed to 12 GeV) Antje Bruell Existing Staff (some matrixed to 12 GeV) Joe Beaufait Elton Smith New Hire Re-assigned Dave Lawrence Simon Taylor Elliott Wolin Joe Beaufait Brian Kross John Lerose Existing Staff (some matrixed to 12-GeV)

  8. Potential Issues (I am sure there are more…) • AWP within Physics Division for “Hall D” (termed MESON?) essential. • “Hall D” in Physics Division, personnel matrixed to 12 GeV project. • Can Physics Division help the 12-GeV project out and make the one new hire a permanent position? (Note: O.k. with Larry if this works long-term in the zero sum rule of “Hall D” staff salaries and MESON procurement funds) • Can we find one more re-assignment within Halls A/C? • Is the suggested split of travel funds o.k.? • Can “Hall D” get secretarial help from within the Physics Division? (alternative: split 12-GeV and Physics Division Funds for Hall D secretary?) • Officially reassign part of Fernando Barbosa and Ed Jastrzembski in FY08? Already mention their names/roles in present Hall D Org Chart? • SC Solenoid work: plan needs to be developed/confirmed. Funds exist within MESON procurement plans. Elton Made sure this all fits within the zero sum rules of 12-GeV Costbook and MESON funds (manpower and procurements), making some slight modifications to 12-GeV/Physics Division manpower split. Next job: in January start projecting long-term Hall D staffing needs.

  9. Slightly revised slides based upon various discussions to optimize plan, note that some numbers are not exact as Elton changed some fractions of FTE’s around to end up with zero-$ changes for both 12-GeV costbook and Physics Division salaries, but I don’t have his spreadsheet readily available.

  10. Hall D Manpower General Strategy • Create a Hall D group, with scientists located in Physics Division, consisting of: • One Hall D Leader • One Hall D Engineer 1 Re-assigned from Engineering Div. • Two Hall D Designers 1 Re-assigned from Engineering Div., 1 TBD • 4) One Technician 1 Re-assigned from Detector Group • 5) 4.6 Hall D Scientists 1 Detector Work Coordinator • 0.3 Detector Specialist, Tracking, • Matrixed from Hall B • 0.3 Detector Specialist, Calorimetry, • Matrixed from Hall A • 1 Computing Work Coordinator, • Re-assigned from DAQ Group • 1 Off-Line Software Specialist • 1 Electronics Work Coordinator, New Hire • 6) One Senior Postdoc Acts as Beam Line Work Coordinator • 7) 0.25 Electrical Engineer Matrixed for 2007 from Hall C, acts as • Infrastructure Work Coordinator • In addition, use Physics Division “MESON” funds for • a) engineering of SC solenoid cryogenics interface • b) implementation of SC magnet controls (aided by Hall C staff) • c) support of TDC, Flash-ADC electronics design • d) support of Scientific Efforts Time of Hall D Scientists

  11. Hall D Organizational Chart a Engineering & Design, reassigned from Engineering Group b Reassigned from Hall B c Reassigned from DAQ Group d New Hire from 12 GeV funds (50%) e Senior Postdoc (50% research) f 0.25 FTE Matrixed from Hall C g Reassigned from Detector Group h 0.3 FTE Matrixed from Halls A,B GlueX Executive Group (EG) Spokesperson: Alex Dzierba Deputy Spokesperson: Curtis Meyer GlueX Collaboration Board (CB) Chair: George Lolos Hall D Group Leader/ Project Manager Elke Aschenauer Detectors Elton Smithb Curtis Meyer Computing Elliott Wolinc TBD Electronics New Hired Lars Holm Beamline Simon Taylore Richard Jones Infrastructure Joe Beaufaitf Magnet + Engineering Tim Whitlatcha Tracking Dan Carmanh Simon Taylor DAQ Elliott Wolin FADC Fernando Barbosa Tagger Magnet Design Chuck Huttona TBDa Technical Staff Brian Krossg Online Calorimetry Matrixed Hall Ah TDC Ed Jastrzenmbski Hodoscope Beam Line Trigger Offline Dave Lawrence Particle Id Only 12 GeV Technical work will be charged against the 12-GeV Costbook. Research paid from Physics Division “Hall D” funds Calib. Monitor Aux. Electronics

  12. Best Guesses of Hall D Manpower Time Split (FY07) S 3.30 0.00 Note: If a Science Number is larger than 0.25 FTE, it reflects both research time and time spent on scientific issues related to Hall D

  13. Physics Division Org. Chart Physics Division Larry Cardman Dennis Skopik Hall A Kees de Jager Hall B Volker Burkert Hall C Steve Wood Hall D Elke Aschenauer Support Groups Latifa Elouadhriri Existing Staff (some matrixed to 12 GeV) Antje Bruell Existing Staff (some matrixed to 12 GeV) Joe Beaufait Elton Smith New Hire Dave Lawrence Simon Taylor Elliott Wolin Dan Carman TBD (Hall A) Joe Beaufait Brian Kross John Lerose Existing Staff (some matrixed to 12-GeV)

More Related