Updates on HWC Procedures for 13 kA Circuits: Review and Commissioning Steps
This document outlines the responsibilities and procedures effective from July 28, focusing on the 13 kA circuits RB and RQ. Key contributors include A. Verweij, M. Koratzinos, J. Steckert, and others involved in IPQs, IPDs, and IT sections. The document emphasizes the need to review potential changes in procedures, nQPS commissioning, and extra steps for EE at 4 kA. It also proposes adding a detailed table for re-commissioning steps after interventions, such as warm-ups and power module changes, to ensure a smooth commissioning process.
Updates on HWC Procedures for 13 kA Circuits: Review and Commissioning Steps
E N D
Presentation Transcript
HWC Procedures • Responsible from 28th July • 13 kA circuits RB and RQ: A. Verweij and M. Koratzinos. J. Steckert • IPQs: N. Catalan and M. Modena • IPDs: J-PH. Tock and R. Denz • IT: B. Auchmann and N. Catalan, H. Thiesen • 600A: M. Zerlauth and S. Le Naour • Orbit correctors: G. D'Angelo and A. Musso
What needs to be done? • Review potential changes in the procedures • nQPS commissioning • EE at 4kA for 13kA circuits • PNO.a3 for 120A circuits in the triplet • … • Add a table with re-commissioning steps • Commissioning steps to be redone after an intervention (warm-up, change of power module, disconnection of water-cooled cables, change of QPS cards, software, etc.)