bernie
Uploaded by
2 SLIDES
170 VUES
20LIKES

Updates on HWC Procedures for 13 kA Circuits: Review and Commissioning Steps

DESCRIPTION

This document outlines the responsibilities and procedures effective from July 28, focusing on the 13 kA circuits RB and RQ. Key contributors include A. Verweij, M. Koratzinos, J. Steckert, and others involved in IPQs, IPDs, and IT sections. The document emphasizes the need to review potential changes in procedures, nQPS commissioning, and extra steps for EE at 4 kA. It also proposes adding a detailed table for re-commissioning steps after interventions, such as warm-ups and power module changes, to ensure a smooth commissioning process.

1 / 2

Download Presentation
Télécharger la présentation

Updates on HWC Procedures for 13 kA Circuits: Review and Commissioning Steps

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HWC Procedures • Responsible from 28th July • 13 kA circuits RB and RQ: A. Verweij and M. Koratzinos. J. Steckert • IPQs: N. Catalan and M. Modena • IPDs: J-PH. Tock and R. Denz • IT: B. Auchmann and N. Catalan, H. Thiesen • 600A: M. Zerlauth and S. Le Naour • Orbit correctors: G. D'Angelo and A. Musso

  2. What needs to be done? • Review potential changes in the procedures • nQPS commissioning • EE at 4kA for 13kA circuits • PNO.a3 for 120A circuits in the triplet • … • Add a table with re-commissioning steps • Commissioning steps to be redone after an intervention (warm-up, change of power module, disconnection of water-cooled cables, change of QPS cards, software, etc.)