1 / 16

Procedures

Procedures. Getting ready for beam (situation end of 2007). Power tests of the magnet circuits. For the other accelerator systems Finish installation Component tests Individual system tests Integration into operation Readiness reviews Dry runs Machine checkout.

bmorrow
Télécharger la présentation

Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Procedures R.Bailey, January 2008

  2. Getting ready for beam (situation end of 2007) • Power tests of the magnet circuits • For the other accelerator systems • Finish installation • Component tests • Individual system tests • Integration into operation • Readiness reviews • Dry runs • Machine checkout • Take over finished sectors for operational testing R.Bailey, January 2008

  3. Injection and first turn / Circulating beam R.Bailey, January 2008

  4. 450 GeV, initial commissioning R.Bailey, January 2008

  5. 450 GeV, optics meas R.Bailey, January 2008

  6. 450 GeV, increase intensity R.Bailey, January 2008

  7. 450 GeV, two beam operation / 450GeV collisions R.Bailey, January 2008

  8. Snapback and ramp / Top energy checks R.Bailey, January 2008

  9. Top energy, collisions / Squeeze R.Bailey, January 2008

  10. Experimental magnets R.Bailey, January 2008

  11. Readiness reviews R.Bailey, January 2008

  12. Readiness reviews R.Bailey, January 2008

  13. Readiness reviews R.Bailey, January 2008

  14. Readiness reviews R.Bailey, January 2008

  15. Extended LTC • Provisionally (RB, PC, OB, SM last week) • March 3-7 • 5 principal topics • Issues for injection into part of the machine (Mike) • Access, interlocks, RP, impact on hwc etc • From hwc to full machine commissioning (Gianluigi) • Dry runs, machine checkout, overview of beam commissioning plans • Readiness and beam plans for accelerator systems (Roger) • Injection, extraction, RF, collimation etc • Readiness and beam plans for AP and BI systems (Oliver) • Aperture, beta beating, dispersion, optics etc • Readiness and beam plans for control systems (Jorg) • LSA, logging, post mortem, fixed displays etc R.Bailey, January 2008

  16. LHCCWG topics 2008 • 0 crossing angle filling schemes Werner Feb 12 • Parameters and tolerances Massimo ? • 75ns (and 25ns) operation ? ? R.Bailey, January 2008

More Related