1 / 64

New Application

JHMeIRB. New Application. eIRB Login. Login to eIRB at http://e-irb.jhmi.edu. Investigator Home Page. Tool Bar eIRB Helpdesk Step by step instructions and tutorials Contact information eIRB Survey submit your feedback to the IRB What’s New

bert-davis
Télécharger la présentation

New Application

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JHMeIRB New Application

  2. eIRB Login • Login to eIRB at http://e-irb.jhmi.edu.

  3. Investigator Home Page • Tool Bar • eIRB Helpdesk • Step by step instructions and tutorials • Contact information • eIRB Survey • submit your feedback to the IRB • What’s New • Learn about updates to the eIRB system, forms, etc. • Grey “Breadcrumb Trail” • Tells where you are in eIRB

  4. Investigator Home Page • Left Navigation Bar • Account Management (Non-JHED Users Only) • eIRB Training • My IRB Studies • Create New Application • Studies List • Studies are listed by project type

  5. Investigator Tabs • Action Required (default tab) • Studies that have been returned for PI response • Researcher Prep • Studies that have never been submitted • In Process • Studies awaiting Pre-IRB or IRB review • Approved • Studies that have been Approved • All My IRB Studies • All approved, disapproved, expired, terminated, disapproved or withdrawn studies with which you are associated

  6. Create a New Application • Select My IRB Studies on the left navigation bar. • Click the Create… button to begin an eIRB application.

  7. Application Screen • Title Bar • Application number is on the right. • Light Blue Tool Bar • Continue • Saves your work and moves you through the application one screen at a time. • Back • Does not save. It takes you to the previous screen. • Save • Saves your work in progress. • Exit • Does not save. It returns you to the Application Workspace. • Print • Allows you to print the current section of the application.

  8. Hide/Show Errors • Hide/Show Errors • Click to split the screen, display errors, and provide links to screens. • Click again to hide the split screen.

  9. Jump To Drop Menu • Jump To • Displays list of required screens. • Use the list to navigate to non-consecutive screens.

  10. * Required Field • *Required • The red asterisk * indicates a required field that MUST be completed. • The PI will not be able to submit the application until all required fields have been completed. • Be sure to enter a title for the study. Never leave the title field blank. You need a title to access the application.

  11. Assign Application Number • Complete all *required fields on the initial screen. • Click Save to create the application and assign it an IRB number. • eIRB application numbers begin with “IRB” and may be found in the upper right corner of the application screens.

  12. Help Link • The Help Link icon appear beside each question. • Click the “?” icon to access IRB Regulatory Guidelines and Policies and download forms/templates.

  13. Drill Downs • Drill down screens look like a multiple document upload field. • Click Add to open screens requiring additional information.

  14. Drill Downs • Drill down screens look like a multiple document upload field. • Click Add to open screens requiring additional information. • Answer the questions. • Click OK.

  15. Drill Downs • Drill down screens look like a multiple document upload field. • Click Add to open screens requiring additional information. • Answer the questions. • Click OK. • Save the screen.

  16. Update Drill Downs • Click Update to open the screens to upload documents, add, or revise information. • DO NOT click Add and create a new listing to upload documents, add, or revise information to a pre-existing listing. • Select DELETE to remove it. • Save the screen.

  17. Exit the Application • Click Save to save the screen. • Click Exit to return to the application workspace.

  18. Application Complete • This page displays all study team documents uploaded into the application. • Documents can be downloaded from this screen but not uploaded on this screen. • Click Continue to advance to the last application screen.

  19. Application Complete • Click Finish • This returns you to the Application Workspace. • Finish indicates the last page of the application. • You may continue to edit the application until it is submitted.

  20. Application Workspace • Application Waiting to be Submitted • Purple text will disappear upon submission of the application. • Study Vital Statistics • Displays the study title, number, PI, IRB Committee, review type, date submitted and last scheduled review. • Current Status • Displays the current status of the application in the submission/review process.

  21. Application Workspace • IRB Review List • Displays the review date, review type, outcome, and letter sent (only if the application has undergone IRB review – not IRB pre-review). • Workspace Tabs • Provide quick access to study-related information. • Will appear as needed. • History Log • Reflects completed activities. • Reviewer Notes • Displays a collective list of IRB issues that require a response by the study team.

  22. Application Workspace • Left Navigation Bar • Divided into two sections. • View/Print New Application • View/Edit gives access to the existing application. • Printer Friendly View displays a scrollable version of the application with the option to print. • Uploaded documents may be opened and printed separately from this view. • View Differences lists changes made to the application since the previous submission.

  23. Application Workspace • Left Navigation Bar • Divided into two sections. • Current Activities • Displays a list of activities that may be completed.

  24. Application Workspace • Select My Home at the top right and return to the Investigator Home Page.

  25. Locate an Application • Select the Researcher Prep tab. • Scroll down to the New Applications section. • Select the application name. • This opens the application workspace.

  26. Request Study Team Participation • Select Request Study Team Participation from the Current Activities section. • This opens the Request Study Team Participation Window.

  27. Request Study Team Participation • Optional comments may be entered into the text box. • Click OK. This sends out an email notification to everyone on the study team asking them to login to eIRB and complete the Agree to Participate activity. • Study team members may complete the Agree to Participate activity without having received the courtesy email notification.

  28. Request Study Team Participation • The PI will receive an email notification when all study team members have agreed to participate. • The History Log may also be checked to determine when all study team members have agreed to participate. • The PI may submit without having received the courtesy email notification, once all study team members have completed the Agreed to Participate activity.

  29. Agree to Participate • Study team members may complete the Agree to Participate activity without having received the courtesy email notification. • The Principal Investigator does not complete the Agree to Participate activity. • Submitting the application confirms the agreement of the PI.

  30. Agree to Participate • Select the Agree to Participate activity from the Current Activities section of the left navigation bar. • This opens the Agree to Participate window.

  31. Agree to Participate • Read the Agree to Participate window content. • Click Yes. • Select whether or not you wish to receive all study-related notifications. • Click OK. • Performing this activity is the equivalent of an electronic signature. • The Principal Investigator does not complete the Agree to Participate activity. • Submitting the change in research confirms the agreement of the PI.

  32. Agree to Participate • View the History Log to see that you completed the Agree to Participate activity. • Select My Home to return to the Investigator Home Page.

  33. Submit the Application • Select Submit from the Current Activities section. • Only the PI will have the Submit activity. • This opens the submit window.

  34. Submit the Application • Submit Window • Add comments or documents ONLY for information NOT included in the application. • Click OK to submit. • This is the equivalent of an electronic signature. • The PI does not complete the Agree to Participate activity. • Submitting the application is the PI’s agreement to participate.

  35. Application Submitted • View the History Log to monitor the progress of the application through IRB Review. • Click My Home to return to the Investigator Home Page.

  36. Application Submitted • Select the In Process tab. • Scroll down to the New Applications section. • Monitor the progress of your application through IRB Review (Current State). • Upon approval by the IRB the application will appear under the Approved tab.

  37. Reviewer Notes • All applications are subject to a Pre-IRB review as well as an IRB reviewer. • Issues that require a response are referred to as “Reviewer Notes”.

  38. Reviewer Notes • IRB staff will add reviewer notes to the applicable sections of the eIRB application. • The PI/study team must respond to each reviewer note and make revisions to the application (if applicable) • Select “Click here to respond…” to enter a response.

  39. Reviewer Notes • Click “Ok” to save your response. Your response will be highlighted in green when complete.

  40. Reviewer Notes • To edit your response, click on “Study Team Response”. • Click OK to save.

  41. Reviewer Notes • You can also track and respond to reviewer notes using the “Reviewer Notes” tab on the Application Workspace.

  42. Request Extension – Pre IRB • An application may be returned as incomplete after assignment to an IRB and before going to an IRB Committee for review. • The Principal Investigator has 60 days to resubmit the application. • You may seek a 60 day extension of this time limit.

  43. Application Workspace – Pre IRB • Click Request Extension - Pre IRB from the Current Activities section. • This opens the Request Extension – Pre IRB window.

  44. Request Extension – Pre IRB • Request Extension - Pre IRB window • Click OK. • Completing this activity automatically grants a 60 day extension to respond to the IRB.

  45. Request Extension – Post IRB • You may seek an extension for the submission of a response to the IRB issues waiting to be addressed. • You must submit a request in eIRB before the original response due date. • Responses cannot be accepted beyond the deadline without a JHM IRB approved extension. • Only the Principal Investigator may submit the request. 

  46. Application Workspace – Post IRB • Click Request Extension – Post IRB from the Current Activities section. • This opens the Request Extension – Post IRB window.

  47. Request Extension – Post IRB • Request Extension – Post IRB window • Enter your reasons for requesting an extension. • Click OK. • Completing this activity sends an email notification to the IRB office to consider your request. • You will receive an email response from the IRB.

  48. Withdraw Application • Only the PI may withdraw an application. • Click PI Withdraw Study from the Current Activities section. • This opens the Withdraw window.

  49. Withdraw Application • PI Withdraw – Researcher Prep • Click OK. • This inactivates the application in eIRB. • If you wish to pursue this study in the future, a new eIRB Application must be created and resubmitted for IRB review. • The study will appear as read-only under the All My IRB Studies tab on the Investigator Home Page.

  50. PI Response – Pre/Post IRB • Request Withdraw – PI Response – Pre/Post IRB • Only the PI may withdraw an application. • Click Request Withdraw from the Current Activities section. • This opens the Request Withdrawal window.

More Related