1 / 7

Underfrequency Load Shedding Review Group Update

Underfrequency Load Shedding Review Group Update. July 15, 2014 Chris Pink. Charter. Annually review the UFLS Plan’s consistency with the requirements of PRC-006. Annually review submitted UFLS program data .

bert
Télécharger la présentation

Underfrequency Load Shedding Review Group Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Underfrequency Load Shedding Review Group Update July 15, 2014 Chris Pink

  2. Charter • Annually review the UFLS Plan’s consistency with the requirements of PRC-006. • Annually review submitted UFLS program data. • Annually simulate the Plan’s design and implementation to ensure it meets performance objectives. • Annually report the findings of the data reviews and simulations to the JCG.

  3. Accomplishments To Date • PRC-006-WECC-CRT-1 became effective January 2013 • UFLS Entity data and dynamics file submissions were received and reviewed in 2013: • Submitted relay data was reasonably consistent with WECC Base Case data. • Load Shedding amounts closely follow Coordinated Plan requirements. • Simulations the Coordinated Plan under 14 island scenarios. • Compiled report for PCC approval. • Revised Attachment B for 2014 data and dynamics file requests.

  4. Key Findings • Plan performed as designed for the following island scenarios: • WECC-WI Island (WI) • Canada Island (C) • North Island (N) • North Island without Alberta (NBF) • North Island without Canada (NWC) • AESO Island (A) • BC Hydro Island (BF) • South Island (S) • Imperial Valley Island (IV) • Mexico Comisión Federal de ElectricidadIsland (CF) • San Diego Island (SD) • San Diego Area Island with Mexico and Imperial Valley (SIC) • San Diego Area with Imperial Valley (SDI) • San Diego Area Island with Mexico (SDC)

  5. Key Findings • The Plan is adequate in its safety-net use. • As expected, the Plan was not adequate for island scenarios with import levels greater than design (25%). • September, 2011 outage. • Sensitivity analysis of variable generation levels found an impact to frequency recovery. • Some adjustments to the anti-stall load shed elements may be required in the future.

  6. Going Forward • Compile and vet 2014 data and dynamic file submissions. • Analyze plan effectiveness for 3 island scenarios: • WECC Island. • Northern Island. • Southern Island. • Monitor impact of variable generation levels. • Include Composite Load models. • Analyze potential impacts of IEEE 1547 compliant distributed generation. • Findings and recommendations by 2015 PCC summer meeting.

  7. Questions?

More Related