6 th LHC Radiation Workshop 29-30 November 2007

6 th LHC Radiation Workshop 29-30 November 2007. The worry was present right from the beginning when it became clear that electronics needed to be installed in the tunnel close to the collider; it is therefore in the baseline LHC Project This resulted in

billie
Télécharger la présentation

6 th LHC Radiation Workshop 29-30 November 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6th LHC Radiation Workshop29-30 November 2007 • The worry was present right from the beginning when it became clear that electronics needed to be installed in the tunnel close to the collider; it is therefore in the baseline LHC Project • This resulted in • a very intense activity of design, validation, measurements, improvements with the equipment groups concerned • on-line monitoring of the dose and particle flux that the equipment receives • the study of effects on infrastructure (optical fibers) • Now we even have some experience in the CNGS target area 29-30 November 2007 Roberto Saban 6th Radiation Workshop

  2. Radiation Tolerance assuranceLHC Baseline SEE testing of the LHC Beam Interlock System (25') Benjamin Todd (AB-CO) Remote I/Os for Interlocks on Warm Magnets (25') Pierre Dahlen (AB-CO) Radiation Tolerance of Cryo equipment in UX85 (25') Serge Claudet (AT-ACR) Radiation damage to CNGS controls equipment (25') EddaGschwendtner (AB-ATB) Radtol optical fibers for LHC Beam Instrumentation Project and Engineering (25') LuitKoert De Jonge (TS-EL) Radiation Effects (25') Thijs Wijnands (TS-LEA) 29-30 November 2007 Roberto Saban 6th Radiation Workshop