Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 18 January 2012

Stellarator Program Update. Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 18 January 2012. Topics. Recent developments. (M. Zarnstorff ) FY-12 plans and status. Calendar. Milestones for FY-12 (1). W7-X Trim Coils. Milestones for FY-12 (2).

blenda
Télécharger la présentation

Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 18 January 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stellarator Program Update Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 18 January 2012

  2. Topics Stellarator Team Meeting / 18 January 2012 / H. Neilson Recent developments. (M. Zarnstorff) FY-12 plans and status. Calendar

  3. Milestones for FY-12 (1) Stellarator Team Meeting / 18 January 2012 / H. Neilson W7-X Trim Coils

  4. Milestones for FY-12 (2) Stellarator Team Meeting / 18 January 2012 / H. Neilson W7-X Trim Coil Power Supplies • PPPL work plan (WAF) review- Oct. 2011. ✓ • Conceptual Design Review. 5 January. ✓ • Choose technology (switching vs. rectifier bridge). 15 Feb. • Preliminary Design Review, Final Design Review, Procurement / Fabrication • Schedule to be updated after concept selection. • Complete deliveries to IPP site.- 1 April 2014. W7-X Physics Program: Research Preparations • Define physics program and facilitate information transfer with W7-X (Gates) • Arrange transfer of divertor and magnetic diagnostics info to PPPL (Gates, Lazerson) • Benchmark HINT2-PIES against agreed upon W7-X equilibrium (Lazerson, Reiman) • Modify PIES to allow non-stellarator symmetry (Lazerson, Reiman)

  5. Milestones for FY-12 (3) Stellarator Team Meeting / 18 January 2012 / H. Neilson LHD Collaboration Program Analysis of the results from the XICS diagnostic (Pablant) Upgrade of XICS camera (need to develop schedule based on detector availability) Transition STELLOPT based reconstruction of LHD equilibria into a production mode (Lazerson) Expt. proposals for 2012 campaign due @LHD. – Jan. 2012 Submit proposals in response to expected DOE Solicitation. (March?) Collaboration on dust dynamics (proposed) Stellarator Optimization System code development (Zolfaghari) STELLOPT/COILOPT modification (Ku, Breslau) CTH eddy current analysis (Zolfaghari)

  6. Milestones for FY-12 (4) Stellarator Team Meeting / 18 January 2012 / H. Neilson Reconstruction (Lazerson) MSE Diagnostic Benchmark - 2/12 (ISHW) Equilibrium with Flow paper - 3/12 LHD Coil Current Optimization - 4/12 (EPS) Non-Stellarator Symmetric PIES - 7/12 Shielding Currents in PIES - 9/12 (APS) PIES/HINT2 Benchmarking Effort –TBD XICS (Pablant) RSI paper in progress. Paper on physics interpretation in progress New detector: delivery from Dectris by August. In-house work on detector housing needs to start in April.

  7. Calendar Stellarator Team Meeting / 18 January 2012 / H. Neilson 29 Jan. – 3 Feb. ISHW-18, Canberra, Australia 1 February Abstract Deadline for TOFE-2012 31 January Draft IAEA Synopses to Advanced Projects Office January LHD experimental proposals due (see D. Gates & http://www.lhd.nifs.ac.jp/en/ for procedures.) 8 February IAEA synopses to U.S. selection committee. 16 February Stellarator team meeting 15 March Stellarator team meeting March? DOE-FES International Solicitation issued. 27-31 August TOFE-2012 Symposium, Nashville, TN 7-12 October IAEA Fusion Energy Conference, San Diego

  8. Agenda 1:30 Program Update, Recent developments, etc. - H. Neilson 1:50 Stellarator Physics Update- D. Gates 2:10 Recent Progress and FY-12 plans 3.1 Eddy current modeling for CTH (J. Hanson, Auburn U.) 3.2 Stellarator System Code Development (A. Zolfaghari) 3.2 STELLOPT/COILOPT modifications for maintainable designs (J. Breslau) X.X Any other topics (Please let me know.) 3:30 Adjourn Stellarator Team Meeting / 18 January 2012 / H. Neilson