1 / 14

Workshop on Stress Corrosion Cracking Operator Panel

Workshop on Stress Corrosion Cracking Operator Panel. Houston, TX December 2, 2003. Agenda. Introduction to TransCanada Historical Performance & Challenges Our Regulatory Environment TransCanada SCC Management Research & Sharing Experiences Summary of Key Messages. Corporate statistics.

bleo
Télécharger la présentation

Workshop on Stress Corrosion Cracking Operator Panel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop on Stress Corrosion CrackingOperator Panel Houston, TX December 2, 2003

  2. Agenda • Introduction to TransCanada • Historical Performance & Challenges • Our Regulatory Environment • TransCanada SCC Management • Research & Sharing Experiences • Summary of Key Messages TransCanada

  3. Corporate statistics • TransCanada Corporation (TRP) listed TSX and NYSE • Employees: 2,400 • Total assets: $ 19.9 billion • Operating income: $2.2 billion • Net income: $747 million • Net income per share: $1.56 • * In $ Cdn at December 31, 2002 • *at December 31, 2000 TransCanada

  4. Power Generation Assets MacKay River Bear Creek Redwater Kapuskasing Williams Lake Sundance A&B Grandview Tunis Calstock Carseland Bécancour Cancarb Nipigon Curtis Palmer Bruce Power Ocean State North Bay Castleton ManChief Xxx xxx TransCanada 20 plants; 4,700 MW (including LP and plants in development) TransCanada Power, L.P. 7 plants; 328 MW TransCanada

  5. Natural gas transmission assets 24,000 miles of wholly owned pipeline; 12 Bcf/day TransCanada

  6. 1954 - 1984 1985 - 2003 Historical Performance & Challenges TransCanada

  7. Our Regulatory Environment • National Energy Board (NEB) • Onshore Pipeline Regulations - 1999 • Guidance Notes • Alberta Energy & Utilities Board (EUB) • Pipeline Act 122/87 • Regulation recognizes diversity in industry • Mix of Prescriptive and Goal-Oriented Regulation • “to ensure the pipelines are suitable for continued safe, reliable and environmentally responsible service.” • Onus on companies to demonstrate adequacy and effectiveness of integrity management systems TransCanada

  8. TransCanada SCC Management • First SCC ruptures occurred in 1985-86 • Near-Neutral pH SCC first recognized on the TC system • tape and asphalt-coated pipe approx. 40% of system length • Active SCC management began in 1986 • Soil model prioritized sections for hydrostatic testing • Public Inquiry in 1995-96 • CEPA SCC Management Program endorsed by membership and NEB • SCC Management Plans were filed • Today we have a risk-based Integrity Management Process TransCanada

  9. TransCanada SCC Management TransCanada

  10. TransCanada SCC Management TransCanada SCC Management • Data Management • thousands of inspection excavations since 1986 • dozens of hydrotests • service failure data • construction data • operating data • terrain data • population data • System-Wide • Digital On-Line TransCanada

  11. Probability of Failure • Probable Consequences • RISK = • X • Safety • Reliability • Environmental • Financial TransCanada SCC Management • Risk Assessment and Decision Making • Failure Probability Models • Combined Statistical and Mechanistic • Models for development phases: Initiation, Growth, Failure • Incorporate Soil Data as well as Other Types • Validated against Condition Monitoring Data • Quantitative • Consequence Model TransCanada

  12. TransCanada SCC Management • Routine Maintenance - Acceptable Risk • includes monitoring industry developments • SCC Risk Control - Unacceptable Risk • hydrotesting is the primary action • test 200 - 350 miles of pipeline annually • working toward in-line inspection and repair • SCC Condition Monitoring - Insufficient Information • excavations and data collection • failure or failure-like sites • model-development sites • system coverage TransCanada

  13. Research & Sharing Experiences • Experience Sharing • CEPA, PRCI, INGAA • share experience • raise awareness in the industry on issues • communication • sharing and developing best practices • R&D is a key component for long-term effective and cost-effective management success • ILI Tools • Strength of Materials • Cracking Mechanisms • Data Mining TransCanada

  14. Summary of Key Messages • SCC is one of several integrity challenges • TransCanada has had success in managing SCC within a flexible goal-oriented regulatory environment • TransCanada uses system information to implement a risk-based approach to SCC management • Companies can work together sharing experiences and taking responsibility for technology & methodology developments • R&D provides effective solutions TransCanada

More Related