An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP6 status report A. Di Mauro (CERN) ITS plenary meeting 20.01.2014

  2. Outline • Update on development of FPC in Al • Summary of proposal of an automated HIC assembly system from VEA • Planning of 2014 WP6 objectives WP6 status report - A. Di Mauro

  3. Status of Al-FPC R&D • 7 prototypes have been etched using DEPHIS Al-coated kapton (the first was shown in December); however last step (Ni/Au coating of contacts) failed due to issues with quality of Al layer (too porous). New foils are being prepared by DEPHIS by improving the Al processing. • Two kapton foils coated (with 25 mm Al) by FHR were delivered last week and will be processed in the next two weeks. WP6 status report - A. Di Mauro

  4. Al-FPC deformation • Nominal distance between first and last contact: 268.800 mm • Metrology checks along 5 trace lines C1 C5 C9 C13 C4 C17 C2 C3 C6 C7 C10 C11 C14 C15 C20 WP6 status report - A. Di Mauro C18 C19

  5. Al-FPC deformation • Al coating and subsequent steps produce shrinking (observed up to ~400 mm): • Cu FPC (12/09/2013): 268.822, 268.827, 268.838, 268.824, 268.827 • Al FPC (DEPHIS prototype, after etching, 16/12/2013): 268.562, 268.575, 268.545, 268.565, 268.528 • Al FPC (FHR 15μm Al, before etching, 07/01/2014): 268.405, 268.396, 268.379, 268.366, 268.384 • After finalization of the production procedure, will study various solutions depending on reproducibility of effect and final deviation from nominal value: • Pad diameter larger than FPC holes (e.g., 250 mm pad can compensate 100 mm over 9 chip flex) • Modify holes position when drilling in order to achieve final nominal values • Compensate by suitable adjustment of chips gap (variation of chips position HIC by HIC!) WP6 status report - A. Di Mauro

  6. Automated HIC assembly system from VEA • The proposal has been reviewed and the system is conform to our requirements and suitable to the purpose. • The main constraints are precision (final chip position tolerance ~ 5-10 mm) and time • In order to achieve the required accuracy and repeatability Linear Positioning Stages (X,Y,Z) have been preferred to robotic arms (faster but less precise) • The structures are simple and also the mathematical model to compensate errors due to thermal expansion is quite simple • This machine allows the assembly of both modules for the inner layer (1 x 9 chips) and for the outer layer (2 x 7 chips) by simple replacement of the "assembly frame", the "FPC stack" and the “soldering balls grid“. WP6 status report - A. Di Mauro

  7. Automated HIC assembly system from VEA TOP VIEW • X or Y Linear Positioning Stage • 200 mm/s • 0.05 mm unidirectional repeatability • 0.2 mm bidirectional repeatability SIDE VIEW Z LPS with 0,1 μm unidirectional repeatability WP6 status report - A. Di Mauro 7

  8. Automated HIC assembly system from VEA Ultra high-precision rotation stage - ± 1.7 mrad (0.0001o) repeatability The assembly frame is positioned on a high precision rotation stage and it has vacuum suction to hold components. WP6 status report - A. Di Mauro 8

  9. Automated HIC assembly system from VEA Cycle time estimation • Worst case scenarios: • 9 chips → 9x8.1 + 8.5 + 8.5 + 9x(4x10.5) + 9x(88x10) = 8388” = ~ 2 h 20’ • 2x7 chips → 14x8.1 + 8.5 + 8.5 + 14x(4x10.5) + 14x(88x10) = 13039” = ~ 3 h 38’ Assuming 48+10% HICs for IB and 1604+10% HICs for OB and 16 h/ working day: 8 days for IB + 397 days for OB WP6 status report - A. Di Mauro 9

  10. 2014 WP6 objectives WP6 status report - A. Di Mauro

  11. WP6 meetings Weekly on Thursdays, 15:30 (Geneva Time) At CERN: 4-S-030 Next Meeting: Jan 30 WP6 status report - A. Di Mauro