1 / 6

ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW

ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW. Purpose. System Engineering Peer Group Initiative Fleetwide Effort To: Perform a Detailed Feedwater Vulnerability Review of Each Site Identify Common Fleet FW System Vulnerabilities Get Corrective Actions Scheduled and Funded.

boris
Télécharger la présentation

ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENTERGY FLEETFEEDWATER SYSTEM VULNERABILITY REVIEW

  2. Purpose • System Engineering Peer Group Initiative • Fleetwide Effort To: • Perform a Detailed Feedwater Vulnerability Review of Each Site • Identify Common Fleet FW System Vulnerabilities • Get Corrective Actions Scheduled and Funded

  3. Methodology • Reviewed Industry FW System OE and Failure Reports and Plant Specific OE • Performed System Walkdowns as a Group at IPEC • Identified Plant Specific Vulnerability Gaps • Developed Common Fleet FW System Vulnerabilities • Identified Corrective Actions

  4. Fleet Results • 50 Fleet Common FW System Vulnerabilities were Identified • Each Site Ranked Applicability of Each Fleet Common Vulnerability • 21 of the 50 Fleet Common FW System Vulnerabilities were Identified as Applicable to WF3 • Gaps of Each Site’s Applicable Fleet Vulnerabilities were Evaluated and Actions Initiated to Resolve.

  5. WF3 Results • 23 WF3 Site Specific Actions Initiated • One New SIPD (1307) Initiated to Modify MFIV Tubing. • Two Existing Modification SIPDs MFIV Accumulator Pressure Switch Mod SPID 310 and ESFAS SPV Mod SIPD 549 • One Repetitive Capital SIPD (196) Revised to Include New PM for FW Pump Inspection

  6. WF3 Results Cont. • Two Obsolete Equipment Issue (FW Governor Controller) included with SIPD 63 Digital FW Control & (FWPT Vibration Instrumentation) include in SIPD 58 Main Turbine Vibration Instrumentation • Remaining Actions to be Completed by WO Process

More Related