CSC New Year’s Resolutions for 2011

CSC New Year’s Resolutions for 2011.  We had a terrific 2010, but Less than 0.01 of a “reasonable” Higgs discovery sample has been collected. Looking forward: We can do better We must not do worse We should understand our common priorities Out of priorities come action.

bradberrym
Télécharger la présentation

CSC New Year’s Resolutions for 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC New Year’s Resolutions for 2011  We had a terrific 2010, but Less than 0.01 of a “reasonable” Higgs discovery sample has been collected • Looking forward: • We can do better • We must not do worse • We should understand our common priorities • Out of priorities come action

  2. Proposed top CSC priorities for 2011 CSC-TF improvements needed Withstand 2 more years of running Moving upgrades into production Optimize our contributions to DPG

  3. 1. CSC-TF Improvements • Current efficiency plot: We will be losing 10% of events at high PT 1.2 < η < 2.1 A. Kropivnitskaya (UF) ~5% efficiency at low pT gives L1 rates ~8 kHz at L=1033 (up to 20 GeV threshold forecast) NB overlap region performance is worse

  4. 2. Withstand 2 more years running • 98.5%96% slowly is the best scenario • Hardware • HV (auto resets, training?) • TMB 3.3v (fuses being replaced) • Water leaks (rack detection being upgraded) • Operations manpower • Fixes  almost problem-free detector? • Increasing use of automation, e.g. reset HV trips • Spread the load from (Greg, Misha, Armando, …)

  5. 3. Moving upgrades into Production • Schedules are very tight – focus is required! • Building 904 factory by July 1? • Set up personnel plans “now” • Machine setup starts mid-Jan • Prototype + preproduction round • Additional parts procurement • Readiness Review • ME1/1 electronics repair • DCFEB prototype coming out ~weeks. Testing will be next challenge! • Dubna working on cabling, mechanical plans for shutdown

  6. 4. Optimizing DPG Contributions • Numerous areas of need • L1 and HLT trigger performance, simulation improvements, code release validation, … • People are leaving (graduating etc.) • Tie DPG work strongly to physics analyses, e.g. • NB that CMS authorship now requires significant service work

  7. Conclusions • It will have been an outstanding 2011 if a year from now we have accomplished these goals: • CSC trigger efficiency is high, L1 rates are acceptable • Detector is still in good shape, operations on an even keel • Upgrades are steadily producing ME4/2 chambers and ME1/1 electronics • Detector monitoring and software (DPG) have all the bases covered • Detailed to-do lists and some references are in the backup slides

  8. Backup slides

  9. References • Latest CSC-TF status report (7-Dec-2010) at http://indico.cern.ch/conferenceDisplay.py?confId=115477 • Richard Loveless and Darien Wood latest updates on the ME4/2 and ME1/1 upgrades (7-Dec-2010) at http://indico.cern.ch/conferenceDisplay.py?confId=115519 • My debriefing from Zurich (10-Nov-2010) at http://indico.cern.ch/conferenceDisplay.py?confId=113118 • Tim Cox DPG overview (14-Jun-2010) at http://indico.cern.ch/conferenceDisplay.py?confId=97906 • Ivan Mikulec muon trigger rates (18-Nov-2010 TSG) athttp://indico.cern.ch/conferenceDisplay.py?confId=79127

  10. Greg/Misha detailed list • HV trips: • Handling automation • Gradually move from common HV for all CSCs (3600 V) to individual chamber HV working point,   then to individual HV channel working point. • Improve the interface to the Configuration database • masking problem boards • global timing shifts • who is masked?" button • I have a list of other improvements I'd like to see on this interface... • Define what needs to come out of online databases into offline.  Apparently the use cases must be defined before the tools can be developed... • Implement tools to pull online database information into offline. • Develop analysis of data in Expert System data warehouse • First use of automated action based on analysis of data in the "warehouse" of the Expert System • Implement "correct" power-up procedure (crates, then chambers), using different channels of Maratons • Debug and fix CSC failures to change states in Run Control • Maintain vigilance to access to address faulty boards • can we help Misha to identify what the problems are? (replacement is not always the answer) • Begin use of firmware repository • Can we create redundancy to my position?  Tim's position?  Armando's position? • Can we move from CSC DQM shifts -> CMS Offline shifts? • Is it possible to have a tool ("automate") looking at the time dependence of things • Be more regular about calibration runs.  Time dependence of these things... • At the beginning of a run identify ALCTs with wrong configuration. • If it is related to AFEBs lost LV - fix it, if it is "hot chamber" (test strip problem) - find a way to get rid of hot strips.

  11. Tim 1 of 3

  12. Tim 2 of 3

  13. Tim 3 of 3

  14. Armando detailed list • Perform systematic and quantitative studies of system performance and allocate appropriate resources • Form dedicated teams to investigate all issues concerning with system “stability and aging” and in charge of proposing “consolidation” actions for further running. Are we happy with what we have? I personally think we can/should do better and this should be done before we have the opportunity to access disks and do repairs. • electronics, • mechanics and infrastructure, • luminosity, backgrounds, neutrons, PU, SEU • Review/redefine roles (with level of priority) and responsibilities within Operations and DPG • at institute level (more efficient) or individuals (easier) • formalize mandatory participation of new comers • Maintain/reinforce focus on physics (best way to strengthen links with POG/PAG) • to get grad students more interested/involved • biweekly/montly report on CMS publication? • ME4/2 and ME1/1 upgrades are a great opportunity for students to work on hardware. Promote/advertize a sizeable “physicists component” in such projects.

  15. Jay detailed list • Ops: • Find a sidekick for Greg (computers &software, CEO training, etc.) • Improve data monitoring shift procedure and training • How to continually monitor pre- and post-firing of L1 muon trigger? • Configuration database additions (bad/hot channels,…) • Implement CLCT muonic timing, narrow ALCT-CLCT coincidence • Implement duplication of events in TMB for closely spaced L1As • Improve local muon trigger efficiency in ME1/1 for high luminosity • DPG • Improve CSC-TF patterns for high efficiency at plateau, low efficiency at threshold • Find someone to take on some of Tim’s jobs • Code release validation • Simulation improvements, e.g. chamber gains • Add to and review the performance paper • HLT contact person. How efficient is the muon HLT?? • Study local trigger CLCT patterns and improve them by station • Trigger bit-wise emulation - put into L1 trigger DQM • Neutron runs compare hit rates versus simulation • dE/dX reconstruction and gain tracking • Improve poor “muon jets” performance • Upgrade • Identify all key factory personnel • Parts flow for ME4/2 chambers • Create software for testing of new cathode electronics • LVMB modifications • Alignment • Use boosted Z’s to investigate high Pt muon systematics and position shifts

  16. Muons From Ivan Mikulec, 18-Nov-2010 TSG Rates in kHz I. Mikulec Might need to go to L1_SingleMu20 at 5e33 Probably can use L1_DoubleMu5 at 5e33 (see Zoltans talk) but careful about pile-up! See next slide for some other possibilities 16

  17. New Year’s Resolutions