1 / 23

MODULE “PROJECT MANAGEMENT AND CONTROL” ON-SITE AND OFF SITE RADIOLOGICAL MONITORING

MODULE “PROJECT MANAGEMENT AND CONTROL” ON-SITE AND OFF SITE RADIOLOGICAL MONITORING. DECOMMISSIONING MANAGEMENT. SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”. CONTENTS. Types and scope of radiological monitoring

Télécharger la présentation

MODULE “PROJECT MANAGEMENT AND CONTROL” ON-SITE AND OFF SITE RADIOLOGICAL MONITORING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODULE “PROJECT MANAGEMENTAND CONTROL”ON-SITE AND OFF SITE RADIOLOGICAL MONITORING DECOMMISSIONING MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  2. CONTENTS • Types and scope of radiological monitoring • Program for radiological monitoring during decommissioning Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  3. TRAINING OBJECTIVES Upon completion of training trainees should be able to: • Identify the types and describe the scope of radiological monitoring. • Describe the program for radiological monitoring during decommissioning. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  4. ON-SITE MONITORING THE FOLLOWING IS NEEDED: • Appropriate monitoring equipment; • Appropriate documents and equipment for packaging, handling and transportation of RAW; • Appropriate equipment for monitoring of airborn contamination; • Appropriate equipment for monitoring at sorting large volumes of low activity materials for clearance purposes; • Appropriate equipment and documents for monitoring of distribution of radionuclides in the facility. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  5. RADIOLOGICAL MONITORING • Objective: • Limitation of individual exposure; • Optimization of radiation protection; • Fulfillment of requirements for safe operation of facilities with ionizing radiation sources. • Regulation of requirements • Activities: • Equivalent dose rate measurement; • Surface radioactive contamination level measurement; • Gas and aerosols volume activity measurement; • Measurement of activity of gas, aerosols and liquid releases in environment; • Measurement of radioactive contamination of different components of environment; • Measurement of different parameters of RAW. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  6. MONITORING PROGRAM • Components: • Monitoring of working places; • Individual monitoring; • Monitoring of releases; • Environment monitoring. • Compulsory data: • Identification of the parameters subject to monitoring, method, scope and frequency of measurement; • Procedures and manuals for assessment of measurements results; • Control level values and list of appropriate actions when the level is exceeded; • Specification of measurement methods; • Selection of measuring instruments. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  7. TYPES OF MONITORING • According to the way of implementation: • Continuous; • Periodic; • When needed. • According to utilization of results: • Control; • Signalizing. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  8. PROGRAM FOR MONITORING OF WORKING PLACES CHANGE OF WORKING MEDIA CONDITIONS  MONITORING PROGRAM UPDATING • Components: • Control of working media; • Control of radioactive contamination; • Control of solid RAW; • Control of activities in the restricted area. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  9. INDIVIDUAL MONITORING SYSTEM • Activities: • Measurement and/or assessment of individual effective and equivalent doses from external radiation; • Identification of a nature, dynamics and levels of radioactive substances intake in human body to assess individual effective and equivalent doses of internal exposure; • Radiometric control of surface radioactive contamination of the body; • Analyses, evaluation and archiving of registered doses of external and internal exposure; • Monitoring of individuals (individual dosimetry) is directed to define individual external and internal exposure of controlled individuals or group. • Components: • Control of external exposure; • Control of internal exposure. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  10. INDIVIDUAL MONITORING SYSTEM Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  11. DECREASE OF DOSE LOADING (ALARA) • Steps to decrease dose loading: • Prior work - decontamination planning, shielding; • Coordination of different group efforts (operational, designers, maintenance, dosimetric); • Preparations for work to avoid demurrages during implementation; • Preliminary instruction and selection of workers; • Usage of electronic alarm dosimeters; • Analysis of former data for the activity. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  12. PLANT STAFF EXPOSURE FOR PARTICULAR DECOMMISSIONING PHASES • Plant staff exposure during preparations for safe enclosure: • Plant staff collective dose - 2,51 ManSv for Units1 and 2; • Individual doses - ≤ 8 mSv/y; • Maximum individual doses - ≤ 12 mSv/y; • Collective dose related to RAW management – 1,8 ManSv for both units. • Plant staff exposure during the phase of safe enclosure of Units 1 and 2: • Annual individual doses ≤ 2 mSv/y. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  13. INDUSTRIAL SITE MONITORING PROGRAM • Objective – to ensure effective radiological monitoring at industrial site • Scope of radiological monitoring: • All rooms on the territory of the industrial site that are outside the restricted area, their equipment and working places as well; • Outer walls of buildings where ionizing radiation sources are kept; • The territory of the NPP industrial site; • Transportation devices and loads leaving NPP territory; • Radioactive substance transfers; • Sewerage and rain drainage on NPP site; • Turbine hall. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  14. ENVIRONMENT RELEASE MONITORING PROGRAM • Aspects of environment: • Radiation; • Non-radiation. • Monitoring program for releases and environment: • Radiation control of releases through vent tubes; • Radiation control of releases into disbalanced water drain; • Radiation control of certain areas around facility. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  15. ENVIRONMENT RADIOLOGICAL MONITORING PROGRAM DURING OPERATIONS OF KOZLODUY NPP • Areas: • Kozloduy NPP’s industrial site; • Area for preventive protection measures – area with radius of 3 km; • Controlled area - 12 km; • Surveillance area - 100 km. • Objects for monitoring • Radiation parameters: • Dose rate and integral equivalent dose of -radiation; • Radioactivity and radionuclide composition of samples . Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  16. OTHER PROGRAMS FOR RADIATION CONTROL OF ENVIRONMENT • Program for radiation control of environment of the site for temporary storage of containers with solid RAW of Ist category in Kozloduy NPP • Program for radiation control of environment of the building for re-cycling, conditioning and storage of radioactive waste of Kozloduy NPP Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  17. ENVIRONMENT IMPACT DURING THE PRAPARATORY PHASE OF SAFE ENCLOSURE • Thermal impact • Radioactive liquid releases • Radioactive gaseous releases • Solid radioactive waste Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  18. LIQUID, GASEOUS AND SOLID RADIOACTIVE WASTE GENERATED DURING THE PHASE OF SAFE ENCLOSURE • Assessment of liquid RAW released during the phase of safe enclosure • Assessment of radioactive releases into air during the phase of safe enclosure • Generation of solid RAW during the phase of safe enclosure Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  19. FAILURE AND ACCIDENT RELEASES DURING THE PREPARATORY PHASE AND OPERATIONAL PHASE OF SAFE ENCLOSURE • Boundary accidents: • Spent fuel pool cooling loss; • Fuel handling accidents; • Spent decontamination solution leakage; • During the phase of safe enclosure – break down and leak of filter. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  20. CHEMICAL AND TOXIC WASTE GENERATION DURING THE PREPARATORY PHASE AND OPERATIONAL PHASE OF SAFE ENCLOSURE, NOISE • Chemical reagents • Asbestos • Noise Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  21. ACCIDENT MONITORING PROGRAM • Operative monitoring of radiation situation in the controlled area and the surveillance area of the site • Operative monitoring of radiation situation in the radiation protected area and the surveillance area around the site • Laboratory analyses made with stationary measuring means Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  22. CONTROL LEVELS • The following is considered at defining the control levels: • Main and secondary boundaries per current norms for radiation protection; • The principle for decreasing staff and population exposure to reasonably achievable level; • Economic and social factors; • Irregularity of radiation impact in time; • Necessity to keep radiation impact level of site with IRS under the set limits; • Efficiency of measures for radiation protection enhancement. • Control levels: • Level of registration; • Level of investigation; • Level of action. Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

  23. REFERENCES • Decommissioning of Nuclear Power Plants and Research Reactors, Safety Guide, SS № WS-G-2.1 (1999) • ISO 14001 Environment Management Systems • Environment Preservation Act, 2002 • Act on the Safe Use of Nuclear Energy, 2002 • Regulation of the Conditions and Procedure for Establishing of Zones with Special Status around Nuclear Facilities and Sites with Sources of Ionizing Radiation, 2004 • Regulation for Emergency Planning and Emergency Preparedness in Case of Nuclear and Radiation Accident, 2004 • Regulation for Radiation Protection during Activities with Sources of Ionizing Radiation, 2004 • Regulation for the Basic Norms for Radiation Protection, 2004 • Report for Kozloduy NPP environment impact assessment • Kozloduy NPP programs for radiation monitoring Project BG/04/B/F/PP-166005, Programme “Leonardo da Vinci”

More Related