An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens & R. Rosol

  2. One MKI System: 4 PFN’s & 4 Magnets Inside a PFN: 2-way electrical delay 9µs UA23 / UA87 RG220U cables to magnet TDR DS Tank MS Tank PFN (~5m) Controls Kicker in vacuum tank RCPS 1 of 4 Magnets at Point 2 M.J. Barnes

  3. Schematic of an MKI System During resonant charging After resonant charging Thyratron can be triggered Protons Injection from SPS M.J. Barnes

  4. MKI2 MS3 Erratic on 28/7/2011 @ 16:30hrs • At 16:30:43hrs, on 28/7/2011, an erratic turn-on of MKI2 MS3 (Melton) at full PFN voltage; • Interlocks detected an MS erratic and correctly triggered MS’s and DS’s of system (within 2µs), emptying PFN via both ends. Hence all 4 kicker magnets pulsed for up to 4.5µs, emptying PFNs of energy. • Circulating beam was not in IP2 and therefore not disturbed. • Batchwas extracted from SPS but saw no kick at MKI2 and went straight into the TDI. • Note: this MS, Melton, was put in place during the last TS (July 2011) and has since made 5 erratics (only last 2 effected beam). Charging current & PFN voltage Current in kicker magnet MS3 erratic MS3 erratic, after resonant charging 4.5µs 2µs M.J. Barnes

  5. MKI2 MS3 Erratic on 28/7/2011 @ 18:03hrs • At 18:03:09hrs , on 28/7/2011 , an erratic turn-on of MKI2 MS3 (Melton) occurred during resonant charging – sending current to 1 of the 4 kickers (Note: it is unusual to have an erratic at such low voltage); • Interlocks did NOT detect erratic of MS3 (at 33kV): hence no immediate action was taken to turn-on other thyratrons. Therefore the full 9µs of PFN pulse length sent, via MS3, to kicker C. • Other 3 PFNs correctly discharged via the DS after 4ms (no further kicker magnet current); • The erratic occurred ~500µs into the charging process, and the extraction from the SPS was inhibited; • Circulating beam was swept over the aperture and protection elements (~17% of normal kick) for ~9µs. PFNs 1 & 2 at normal voltage (~50kV) PFNs 4 at low voltage (~33kV) because of MS3 erratic Erratic (untriggered) turn-on of MKI2 MS3 ~9µs circulating beam not dumped M.J. Barnes J. Wenninger

  6. MKI Erratic Summary • MS Melton (MKI2) erratics (total: ~12): • April 2010: SoftStart - 1 @ 1.7kV above nominal • August 2010: SoftStart - 3? (1 recorded) @ 1.7kV+ above nominal • Normal Op – 3? (1 recorded) • 2/9/2010: Melton replaced by Moulin • July 2011: Melton installed during TS of July 2011 (replacing Moulin) • SoftStart – 3 (1 @ ~40kV; 2 @ 2kV above nominal) • Normal Op – 2 (1 recorded) • Melton replaced by Moulin on 29/7/2011 • Other MKI2 Switch erratics since April 2010 (total: 6): • MS1 Millbrook: SoftStart - 3 • MS3 Moulin: SoftStart – 2 & Normal Op – 1 (4/7/2011). Replaced by Melton during July 2011 TS. Moulin reinstalled 29/7/2011. • DS3 Doncaster: SoftStart – 1 • MKI8 Switch erratics since April 2010 (total: 2): • MS2 Manchester: SoftStart – 1 • DS2 Dagenham: SoftStart – 1 M.J. Barnes

  7. MKI Summary of Investigations & Actions • After replacing MS Melton, and following two MS3 erratics and a further intervention (30/7/2011), the erratics have stopped (since 10 days) and the immediate danger of more erratics seems to be gone. • MS Melton brought back to lab. Current regulator on bias-board found to be damaged – supplying current corresponding to maximum of thyratron specification: this could increase rate of erratics. • Remote trending of current presently being implemented to allow possibility of remote diagnosis of this current regulator fault. • Long-term: fibre optic read-back to monitor thyratron G1 and bias-board. • Thyratron in MS Melton may be damaged – to be returned to E2V for diagnosis. • Spare MS from MKI8 now in lab for re-conditioning; can be used at Pt 2 or Pt 8. • Occasional missing G1 triggers to MS3 (5% to 10% missing) & MS4 thyratrons. This accounts for jitter noted (IQC) on MS3 & MS4. • Missing G1 accelerates wear of thyratron, hence may have contributed to quantity of erratics. • New trigger cards designed and built but not yet installed in MKI – but further investigations of cause are also required. • Long-term: detection of missing outputs of G1 power trigger unit. • Tests in UA23 have demonstrated that: • Erratic occurring after resonant charging is correctly detected; • Erratic occurring at 500µs into resonant charging was not detected. • Non-detection of MS erratics (thus no retriggering of other thyratrons) – High Priority • Inhibit/masking due to one or more modules or a noise-filter, in the erratic detection chain, may be responsible. Awaiting access, in the shadow of another intervention, to investigate further. • Low voltage fast interlock inhibition mechanism will be removed (implemented for the SoftStart) during next short TS. • May require further investigations ….. Bias-board Thyratron M.J. Barnes