An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interim Planfor LCLS Startup Space Steve Williams Deputy to PPA Director Special Assistant to the Director LCLS/Lab Liason

  2. Interim Plan for LCLS StartupSpace • Assume no CLOC building • Meet program needs at startup • Reuse, reassign and refurbish space to meet LCLS program needs and needs of reassignees

  3. Requirements • LCLS ops: 160 users, staff, post docs, students • Offices, labs, shops, conference rooms • SSRL: 25 staff • Pulse: 6 groups, six faculty, staff, students • 60 in all + 6 support • 5 laser labs, 1 bio lab 2K sqft each • conference room • Total seats: 260 -> ~26,000 sqft + labs, shops

  4. The Plan • Keep new functional areas together • LCLS – CEH and Building 28 • SSRL – Building 28 • Pulse – 2 story wing of Central Lab • Map • Detailed spread sheet/cost reference

  5. Central Lab 2 Story Wing (Pulse) Linac/LCLS Management/LCLS Project Bldg 28 (LCLS/SSRL) Near Hall (CLOC) CEH (LCLS Users/Staff)

  6. Collider Experimental Hall

  7. LCLS Ops CEH Students (22) HVAC 3rd floor 2nd floor 1st floor Staff (16) Conference Users (40) Shops/Staff (10) Conf P I T Ground level 70 feet down Near Hall Mark II Far Hall Apron Babar/LST SLD

  8. Building 28

  9. LCLS Ops and SSRL In Building 28 Offices for staff, users, students, post docs LUSI (27) Existing LCLS/SSRL (38) Planned LCLS (50) Future Total 115 5900 S.f. 9500 S.f.

  10. Central Lab

  11. Laser Labs (4) Laser/Bio Labs (2) Technical Illustration Library Faculty (3), staff (8) Faculty (3), staff (8) 30 Admin, Post Doc, Students Conference Pulse Offices and Labs In Central Lab Faculty (6), admins/staff/post docs/students (46), laser and bio labs (6)

  12. Requirements versus Available Seats in Plan

  13. Summary • Interim Plan demonstrates that existing buildings can reasonably accommodate LCLS startup – users, students, staff, labs, work areas…. • Accomplished through reassignments and reuse • Can be staged to meet budget and schedule requirements just in time and accommodate transitions. • Next step: work with assignees and reassignees to come up with a suitable tactical/detailed/budgeted plan • New space needed as program grows in future years