1 / 7

Information and Monitoring Status and Plans

Information and Monitoring Status and Plans. JRA1 All-Hands, NIKHEF, 20-22 February 2008 Antony Wilson/RAL on behalf of JRA1-UK. Status. R-GMA Stable Coding of new design complete Testing continues bdII Stable SD Stable SAGA code complete Sorting out ETICS. R-GMA Patches.

Télécharger la présentation

Information and Monitoring Status and Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information and MonitoringStatus and Plans JRA1 All-Hands, NIKHEF, 20-22 February 2008 Antony Wilson/RAL on behalf of JRA1-UK

  2. Status • R-GMA • Stable • Coding of new design complete • Testing continues • bdII • Stable • SD • Stable • SAGA code complete • Sorting out ETICS Antony Wilson/RAL

  3. R-GMA Patches • patch #1639: RGMA glue-archiver fix for bug #27538 and #27595 - Ready for certification • patch #1606: R-GMA flexible archiver fix for bug #24007 - Ready for certification • patch #1558: Replacement patch for R-GMA patch #1426 - Ready for certification • patch #1537: glite-MON for gLite 3.1 / SL4 - Ready for certification Antony Wilson/RAL

  4. Includes: Services: Primary Producer Secondary Producer Consumer Schema Registry Browser Inspector Facilities Single servlet Task Manager Tuple Store Multiple VDBs Authz Replication of schema and registry Improved streaming Excludes: Services: On Demand Producer Facilities: Oracle support First release of new R-GMA design Antony Wilson/RAL

  5. Testing • Our testing framework has been overhauled • Make it easier to run for those tests involving many machines • It includes simulations of various R-GMA applications that can be run in parallel for a long period Antony Wilson/RAL

  6. Roll Out of New R-GMA Code • Patch #1537 gLite 3.1 MON Box • We need this to be rolled out prior to our new code being released • Update schema to include new default columns • In units of SP • Update registry with special temporary version along with the new schema • Release new code to sites • Compatibility maintained with old code • After majority of sites have updated • Update existing registry to new code • Old code will NOT work with the new Registry • Configure registry replicas: • Enables registry replication • Introduce new virtual databases Antony Wilson/RAL

  7. Service Discovery • SD API Specification • Almost ready to go for public comment • Implementation • SD core in the SAGA CVS and going into ETICS as an external • bdII and R-GMA C++ adapter/plug-in is working (in gLite CVS) • Wrapper to look like existing gLite SD completed • Mainly for testing • Python wrapper is being worked on Antony Wilson/RAL

More Related