1 / 14

Asset Optimization using PI and AF

Regional Seminar Series Cincinnati. Asset Optimization using PI and AF. Nancy Shifflet Optimization Analyst NiSource Gas Transmission and Storage. Charles Harrison Optimization Team Leader NiSource Gas Transmission and Storage. October 7, 2009. NiSource Gas Transmission & Storage.

Télécharger la présentation

Asset Optimization using PI and AF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Seminar Series Cincinnati Asset Optimization using PI and AF Nancy Shifflet Optimization Analyst NiSource Gas Transmission and Storage Charles Harrison Optimization Team Leader NiSource Gas Transmission and Storage October 7, 2009

  2. NiSource Gas Transmission & Storage NGT&S Companies Columbia Gas Transmission Corp.Columbia Gulf Transmission Co.Crossroads PipelineGranite State Gas TransmissionCentral Kentucky Gas TransmissionMillennium Pipeline (partner)Hardy Storage Company (partner) Employees: 1,571Total Payroll: $98 millionOperating States: 17Miles of Pipe: approximately 14,000Compressor Stations: 100Total Horsepower: About 1.1 millionAnnual Deliveries: About 1 trillion cubic feetNumber of customers: 72 LDCs and a variety of commercial usersStorage Fields: 37 in four statesTotal Storage Capacity: 590 billion cubic feetTotal Working Gas: 253 billion cubic feetPeak Day Deliveries: 7.4 billion cubic feet (4.5 bcf from storage)State taxes paid annually: $58.6 million Key Growth Projects Millennium PipelineHardy Storage and TransmissionEastern Market ExpansionAppalachian ExpansionOhio Storage Expansion Project

  3. Business Value – Asset optimization using PI and AF The Challenge: Optimizing the performance ofour fleet of gas compressors in service at 100stations over 14,000 miles of pipeline “Never in the history of our business have we needed to optimize how our assets perform as much as we do in today’s business environment. At $10 an MCF for gas for fuel for our compressor stations we spend $600MM US Dollars a year.” Customer Business Challenge Central Diagnostic Monitoring and Analytics Results / Benefits • Performance Measurement • Real Time Discovery of Performance Degradation • Unit to Unit Comparison • Centralized Diagnostic Monitoring • Transform NGT&S Operating Expertise into PI Analytics • KPI Dashboards • Reduction in Compressor Engine Fuel Consumption • Increase in Compressor Engine Operating Range • Improved Compressor Engine Reliability

  4. How PI Stretches PI Enterprise Professional Users Data ACE/AF Pipeline Integrity Environmental Environmental Compressor Engine Controls iFix Gas Quality Model GQ Facility Planning Essential Model Electronic Measurement Gas Control OPC SCADA Gas Control SCADA Measurement EM Weather Weather Operations Support Compressor Services OPC Field Services PI Gas Chromatograph Optimization Analysts

  5. Compression

  6. Compression

  7. Compression

  8. Efficiency

  9. Compressor Station Fuel – KPIs (Concept)

  10. Energy Cost – (CF$/mcf)*(7350BTU lhv/BHP hr)*(1cf/1000BTU hhv)*(1BTU hhv/0.915BTU lhv) *(BHP)*(1mcf/1000cf)

  11. KPI - Model Heat Rate/Actual (PI-AF)

  12. KPI - Model Heat Rate/Actual (PI-AF Element Relative Display)

  13. AF in PI Datalink

More Related