50 likes | 380 Vues
Shipbuilding – classification (p. 98, pp. 108-109). Pre-construction stage The Society has made up ... C The Society approves ... J The Society ensures that ... I During construction The Society checks the maintenance of ... G The Society assures that the ship will meet ... D.
E N D
Shipbuilding – classification (p. 98, pp. 108-109) Pre-construction stage • The Society has made up ... C • The Society approves ... J • The Society ensures that ... I During construction • The Society checks the maintenance of ... G • The Society assures that the ship will meet ... D
Upon and after completion of construction • The Society awards “+100 A1” to indicate that ... B • The Society awards “+” to indicate that ... F • The Society awards “100A” to indicate that ... L • The Society awards “1” to indicate that ... H • The Society’s surveyors ... A • The Society ensures that ... K • The Society is empowered to ... E
Shipbuilding – Building the ship (pp. 98-99, p. 110) • Beam - strengthening (A), support (E) • Bracket – support (E); propeller bracket • Brace – support (E) • Bulkhead – separation (D) • Deck – shaping (B), plating (B) • Floor – shaping (B) • Frame – shaping (B) • Girder – strengthening (A), support (E); bottom girder, deck girder • Keelson – strengthening (A); = centre girder • Shell – plating (C); shell plating • Stanchion – strengthening (A), support (E) • Stiffener – strengthening (A) • Strake – plating (C) • Stringer – strengthening (A)
Additional exercise – keys • keel • beam • derricks • loadline • Cofferdams • Deadweight tonnage • Gross register tonnage • astern • hatches • bulkheads
tweendecks • collision bulkheads • self-trimming • freeboard • forecastle, • ports of call • roadsteads • adjustable • midships • Construction Waterline