Delve into the world of demand response programs and automated metering infrastructure to optimize electricity usage. Explore current programs, implementation strategies, and future advancements in electrical metering technologies. Join us for a comprehensive workshop on the latest trends and innovations in integrated utilities.
E N D
Oklahoma Gas and ElectricAPSC Workshop on Electricity Demand Response and Advanced Metering for Integrated Utilities Demand Response & Automated Metering Infrastructure Now and into the Future Philip R Bartholomew Oklahoma Gas and Electric May 24, 2007
Current Programs Demand Response Programs • Load Curtailment • Interruptible Rider • Performance Award for Curtailed Energy (PACE) Automated Metering Infrastructure • Billing • Customer Information Systems • Inter-connection Monitoring
Load Curtailment and Interruptible • Similarities • Customer signs a contract to limit use during events • Customer paid a reservation credit each month • Events limited to: • Between 4 and 8 hrs / event • No more than 100 hrs per year • Differences • Interruptible customers MUST curtail • Curtailment Customers can choose • Perform • Don’t Perform (penalties apply) • Buy-through (Real-time Pricing Customers only)
Performance Award for Curtailed Energy (PACE) • Customer applies for rate • 250 kW billing demand demonstrated • No contract • No minimum reduction • No requirement to perform • No reservation fee • Paid on per event basis • Cents / kWh avoid • 10% minimum threshold (by formula)
Automated Metering Infrastructure(Remote Access to a Meter) • Billing • Remote areas • Special Cycles • Interconnects • To other load serving entities • Jurisdiction Metering for COS • Customer Information Services • RateTamer • Customer’s load management system
“The Future” • Meters are evolving (AMR) • IP addressable • Lower Cost • More pathways to get to meter built in • Communications is Evolving (AMI) • Broadband over Powerline (BPL) • Wi-max, dark fiber, 900 MHz • Software approaching end-of-life (MDM) • Can’t handle all the data • Can’t initiate advanced activities (cut-offs)