SlideServe
Menu
Préférences
© SlideServe · v2026

Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model 

cairo-schultz avatar
11 diapositives · 254 Views · Nov 18, 2014

Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model . Presented by. Kenneth Greer – CenterPoint Energy Gas Transmission. Contents. Different type and quality of data sets. 1. Conversion tools. 2. Obstacles - Short Timeline. 3. The Plan. 4.

Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model  - slide 1
01 / 11Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model 
1 / 17

Télécharger la présentation

Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model 
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model  Presented by Kenneth Greer – CenterPoint Energy Gas Transmission

  2. Contents Different type and quality of data sets 1 Conversion tools 2 Obstacles - Short Timeline 3 The Plan 4

  3. Existing data sets – Lotus Notes 1 • Pipe and equipment attributes • Derived from old mainframe data • Poor maintenance

  4. Existing data sets - MapInfo 1 • Primary software for field operations • Synchronization already established • Individual file per pipeline • Field GPS of good quality • Excellent maintenance • Field tools already created • No training needed

  5. New data sets - Maximo 1 • Scheduling and maintenance • Work Orders • Training needed

  6. New data sets - PODS 3.2 enhanced 1 • Enterprise database • Pipe and equipment attributes • Spatialized • Vendor application • Training needed

  7. New data sets - ArcGIS 1 • Used to load and maintain centerline • Vendor application required • Training needed

  8. Conversion tools 2 • Internally developed loader • Vendor applications • Company developed synchronization applications fro Maximo • Re-stationing process using ArcGIS, MS Access and internally developed loader • Reports generated • Cross reference files maintained in Oracle

  9. Obstacles 3 • Six months • Mismatch of pipeline measures – spatial vs. data • Load all data – active, abandoned, sold, etc. • Not all pipeline data had spatial counter parts • Load and re-station all pipelines • Training

  10. The Plan 4 • Determine pipeline and route status and match to GIS components to determine routes • Load all data to PODS using measures in Lotus Notes • Re-station per GIS lengths • Load to Maximo • Training for PODS and Maximo • Review re-stationing reports • Correct data with the new interfaces

  11. Questions 5