1 / 7

Measure M6 Bond Projects

Measure M6 Bond Projects. Juan Soria Elementary School Grades K-8 3101 Dunkirk Street, Oxnard, CA 93035 (Located near the intersection of 5 th Street and Patterson Rd.) Project Start Date: October 11, 2007. Total Acreage : 7.92 acre (345,070 sq. ft.)

Télécharger la présentation

Measure M6 Bond Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Measure M6 Bond Projects

  2. Juan Soria Elementary School Grades K-8 3101 Dunkirk Street, Oxnard, CA 93035 (Located near the intersection of 5th Street and Patterson Rd.) Project Start Date: October 11, 2007 Total Acreage: 7.92 acre (345,070 sq. ft.) Total Building Sq. Ftg: 76,642 sq. ft. Total Classrooms: 36 Classrooms

  3. Curren Elementary School P2P+ Project Grades K-6 1101 N. “F” Street, Oxnard, CA 93030 Project Start Date: June 1, 2007 The P2P+ project is a new two (2) story classroom building that replaces portable classrooms with permanent classrooms and adds 10 classrooms to the current campus capacity.

  4. Curren Elementary School Bldg. 600 Project 1101 N. “F” Street, Oxnard, CA 93030 Project start date: October 21, 2008 The modernization project consists of completely renovating the existing Kindergarten building with all new interior finishes including flooring, wall and ceiling finishes, computer drops, new doors, windows and hardware. Existing bathrooms were upgraded for ADA compliance, including new fixtures and finishes.

  5. Kamala Elementary School P2P+ Project Grades K-6 634 W. Kamala Street, Oxnard, CA 93030 Project Start Date: June 1, 2007 The P2P+ project is a new two (2) story classroom building that replaces portable classrooms with permanent classrooms and adds 10 classrooms to the current campus capacity. Total Bldg. Sq. Ftg.: 41,196 sq. ft. Existing Campus Classrooms: 21 Classrooms Replaced by P2P+: 12 Additional P2P+ Classrooms: 10 Total Campus Classrooms: 43

  6. Driffill Elementary School P2P+ Project Grades K-6 910. “E” Street, Oxnard, CA 93030 Project Start Date: Fall 2011 The P2P+ project is a new two (2) story classroom building that replaces the existing brick building classrooms and portable classrooms with permanent classrooms and adds 4 classrooms to the current campus capacity. The project also includes major site improvements. Total bldg. Sq. Ftg.: 56,602 s.f. Existing Campus Classrooms: 36 (Permanent and Portable) Classrooms Replaced by P2P+: 23 Additional P2P+ Classrooms: 4Total Campus Classrooms: 40

  7. Driffill School P2P+ Project Oxnard School District The corner of 9th and E Street building elevation rendering showing the Main building entry and school monument sign.

More Related