1 / 7

Summary of progress IAF GD3 TF (April 2012)

Summary of progress IAF GD3 TF (April 2012). IAF GD3 meeting. 28 April 2012 : 13.00-17.00 15 participants from both ABs and CBs. IAF GD3 Components. Technical Components. IAF GD3. IAF/ILAC A5. IAF ML-series ML1, ML5, MLA. Co-operation components. IAF MoU.

Télécharger la présentation

Summary of progress IAF GD3 TF (April 2012)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of progressIAF GD3 TF(April 2012)

  2. IAF GD3 meeting 28 April 2012 : 13.00-17.00 15 participants from both ABs and CBs

  3. IAF GD3 Components TechnicalComponents IAF GD3 IAF/ILAC A5 IAF ML-series ML1, ML5, MLA Co-operation components IAF MoU

  4. IAF MD xxx : Assessment of a CAB for Cross Frontier Accreditation

  5. IAF MD xxx • Consensus of the TF is that the document should be mandatory • The TF has agreed a draft document for circulation to TC members for comment

  6. Recommendation/Way forward • IAF TC give endorsement to the IAF GD3 TF to circulate the draft “Assessment of a CAB for cross frontier accreditation” to IAF TC members for 60 days comment according to IAF procedures; • The amended text for MoU will be discussed further by the TF.

More Related