Virtual Server Implementation

DESCRIPTION

Virtual Server Implementation. Presented by HYUN. The Project objects. Power saving server environment Server resource utilization. Virtual Server. d. Virtual Networking implementation. Electricity power calculation. A fluorescent light power consumption. 30 – 40 W.

1 / 21

Télécharger la présentation

Virtual Server Implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Virtual Server Implementation Presented by HYUN

  2. The Project objects • Power saving server environment • Server resource utilization

  3. Virtual Server • d

  4. Virtual Networking implementation

  5. Electricity power calculation • A fluorescent light power consumption 30 – 40 W

  6. Electricity power calculation • General desktop/server’s power consumption • CPU : 100W • RAM : 8W • Graphic card : 30W • Mother board : 20W • CD-ROM : 20W • HDD : 13W • Monitor : 40W ------------------------------------------------------------------- Total = 230W

  7. Electricity power calculation • General server power consumption (per day) 230W x 24(hours) = 5,520 Wh = 5.5 KWh 5.5kWh  $ ?

  8. Electricity power calculation • A fluorescent light power consumption 30 – 40 W 230W / 35W ≒ 6.5 =

  9. Power consumption comparison VS 5 Physical Virtual Server servers

  10. Power consumption comparison 230W x 5 x 24h = 27.6kwh + a 230W x 24h = 5.5kwh + a

  11. Virtual Server Advantages • Power saving over multiple physical servers • Simplify system administration by integrating all servers into one physical machine • Server hardware resource optimization

  12. Virtual Server disadvantages • When host server machine crash, all virtual servers embedded in the server crash too.

  13. Extra considerations for power saving • General SATA HDD 13W • NAND flash memory – SSD 1W

  14. Extra considerations for power saving • External USB HDD 3W – 5W

  15. Extra considerations for power saving • Power saving application • Turning off the monitor • Turning off the HDD • CPU power control etc.

  16. Design Overview e

  17. Hardware List

  18. Software List

  19. MS Project

  20. Budget

  21. THANK YOU