1 / 6

Status of OLYMPUS -Project

Status of OLYMPUS -Project. OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the OLYMPUS installation and running have to be worked out 2.) necessary funding becomes available. Status on 1.)

carr
Télécharger la présentation

Status of OLYMPUS -Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of OLYMPUS -Project • OLYMPUS-Proposal conditionally approved by PRC October 2008: • 1.)details of the OLYMPUS installation and running have to be worked out • 2.)necessary funding becomes available Status on 1.) Detail plan for OLYMPUS installation and running has been worked out, presented and approved at the OLYMPUS- collaboration meeting April, 2009 Responsibilities: BLAST-detector: MIT, University of Colorado, Arizona State University Target: MIT, INFN Ferrara, Universität Erlangen-Nürnberg New Intersection point: DESY, MIT, St. Petersburg NPI New Luminosity Monitor: Hampton University, INFN Bari, INFN Rome Trigger, DAQ: Universität Bonn, Universität Mainz Electronics: Universität Bonn, MIT, Universität Mainz Tracking detectors: MIT, INFN Rome, Universität Mainz Particle Identification: University of Glasgow, Arizona State University Timing Scintillators: University of New Hampshire DESY PRC May 10, 2007 DESY PRC MAY 5, 2009

  2. OLYMPUS proposal conditionally approved by PRC in October 2008 Requests submitted to funding agencies: December 2008 (Germany) and January 2009 (US) Remove ARGUS experiment in Summer 2009 Ship BLAST/OLYMPUS detector and OLYMPUS target in summer/fall 2010 Modify DORIS beamline and install OLYMPUS target in DORIS in winter 2010/11 shutdown. Install complete OLYMPUS experiment in summer 2011 Commission in fall 2011 Take data in 2012 Timeline Richard Milner DESY PRC May 10, 2007 DESY April 6, 2009 2 DESY PRC MAY 5, 2009

  3. Status of OLYMPUS -Project Status on 2.) Necessary Funding German groups submitted grant request to the BMBF, December 2008 American groups submitted grant request to NSF and DOE January 2009 Funding Requests: Transportation BLAST-detector: 500,-k$ only American Groups DOE Target:450,- k$ only American Groups NSF,DOE Luminosity Monitor:120,- k$ only American Groups NSF,DOE Trigger, DAQ:235,- kEuro Bonn, Erlangen, Mainz BMBF Postdoc, PhD-Students480,. kEuro Bonn, Erlangen, Mainz BMBF New Intersection Region:280,- kEuro onlyEuropean groups DORIS Modifications:487,- kEuro all groups OLYMPUS Operation Costs:585,- kEuro all groups DORIS Operation Costs: 450,- kEuro direct request to BMBF or DESY DESY PRC May 10, 2007 DESY PRC MAY 5, 2009

  4. Manpower OLYMPUS -Project Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Bonn: R. Beck, F. Klein, 2 * (0.5 FTE) 1 2 * (0.25 FTE) 1 Postdoc H. Schmieden Mainz: A. Denig, F. Maas 3* (0.30 FTE) 1 2* (0.25 FTE) 1 Postdoc D. von Harrach Erlangen: E. Steffens 1* (0.30 FTE) 1 Postdoc American Groups: Milner, Matthews, Redwine 3 * FTE 2* (0.5 FTE) 2 Postdocs Alarcon, Kohl, Crawford, 3 PhD-students Calarco, Kinney Glasgow: Rosner, Kaiser 1 * (0.5 FTE) 1* (0.5 FTE) will request 250k€ Petersburg: Belostotski 2* FTE 1* FTEwill apply in 2010 DESY PRC May 10, 2007 DESY PRC MAY 5, 2009

  5. Manpower OLYMPUS -Project Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Italy groups De Leo, Nappi 2 * FTE 1 * (0.25 FTE) Ferretti Dalpiaz Lenisa, Cisbani, Frullani, Garibaldi DESY: F. Brinker, U. Schneekloth, Y. Holler, 1 * FTE (W. Hain) 2 * (0.5 FTE) DESY PRC May 10, 2007 DESY PRC MAY 5, 2009

  6. DESY PRC May 10, 2007

More Related