1 / 44

Lower Level

Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools. Lower Level. First Floor. Third Floor. Second Floor. Eastchester Union Free School District Proposition One First Floor Middle School & High School.

cate
Télécharger la présentation

Lower Level

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eastchester Union Free School DistrictPre-Bond Planning 2007-2008Presenter:Marilyn Terranova, Ph.D. – Superintendent of Schools

  2. Lower Level First Floor Third Floor Second Floor

  3. Eastchester Union Free School DistrictProposition OneFirst FloorMiddle School & High School

  4. High School

  5. Shared Wing

  6. Middle School

  7. Eastchester Union Free School DistrictProposition OneFirst Floor Highlights

  8. Old Gymnasium Revovated to New Cafeteria Capacity 260+

  9. Commons: • Meeting space for student clubs during lunch hours • Small group instruction space during instructional time

  10. Other school uses: • Study halls • Small group instruction • Community uses: • Holding large scale events that can be catered • General community meetings

  11. First floor of the Eastchester High School to replace the footprint of the existing cafeteria

  12. 1st Floor Middle School

  13. Eastchester Union Free School DistrictProposition OneSecond FloorMiddle School & High School

  14. High School

  15. Shared Wing

  16. Middle School

  17. Eastchester Union Free School DistrictProposition OneSecond Floor Highlights

  18. Mezzanine to High School Cafeteria Current old gymnasium

  19. School uses: • Additional eating area for students • Meeting lunch space for staff • Small group instruction • Drop in study center • Wireless laptop use

  20. Second Floor High School Addition

  21. Second Floor Middle School Addition

  22. New Middle School Elevator from 1st floor to 2nd floor ADA Requirement

  23. Eastchester Union Free School DistrictProposition OneThird FloorHigh School

  24. High School

  25. Eastchester Union Free School DistrictProposition OneThird Floor Highlights

  26. 3rd Floor High School Addition

  27. Eastchester Union Free School DistrictProposition OneLower Level“Basement”“Utilizing Every Square Inch”

  28. High School

  29. Eastchester Union Free School DistrictProposition OneLower Level Highlights

  30. Lower Level High School

  31. Eastchester Union Free School DistrictAdditional Needs“Proposition Two”

  32. Instrumental Lesson Rooms Middle School Cafeteria Expansion

  33. Two Instrumental Lesson Rooms 410 Square feet each

  34. Instrumental Lesson Rooms Middle School Cafeteria Expansion

  35. Middle School Cafeteria Expansion provides an additional 1235 square feet

  36. Before Construction

  37. Before Construction

  38. After Construction

  39. Highlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, 2008. The plans for the renovation and construction project at the High School and Middle School include the following:

  40. Proposition 1 ($19,600,000) • At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): • 7 NEW general education classrooms • 4 NEW small group instruction classrooms • 4 NEW science (lab) rooms • 1 NEW art classroom • 1 NEW physical education/fitness station • 4 NEW toilet rooms • 3 RENOVATED art classrooms • 2 RENOVATED small group instruction classrooms • Renovated cafeteria (relocated) with a commons and multi-purpose room and drop-in study center

  41. Proposition 1 ($19,600,000) At Eastchester Middle School: • 4 NEW general education classrooms • 1 NEW technology classroom • 1 NEW science/lab • 1 NEW elevator

  42. Proposition 2 ($1,285,000) At Eastchester Middle School: • 2 NEW instructional music/multipurpose rooms • Renovation/expansion of cafeteria

  43. Thank You Dr. Terranova 914-793-6130 x4201

  44. Bond Vote March 19th