Gas System & Electronics Rack Installation for Transparency Monitor Hutch
This project involves setting up gas systems, piping, and electronics racks in the transparency monitor hutch. It includes gas flow control, mounting brackets, mechanical support adjustments, and cabling/piping planning with cable trays and pipe organizers.
Gas System & Electronics Rack Installation for Transparency Monitor Hutch
E N D
Presentation Transcript
HBD Preparations Don Lynch
HBD HBD transparency monitor hutch Mockup HBD LV & Signal cable tray SS Piping to transparency monitor hutch
HBDGas System Flexible piping Rigid piping
HBD HBD transparency monitor hutch
HBD & TOF Gas Systems Gas Pad Location for CF4 bottles TOF/HBD Gas Flow Control Rack Electronics rack In Gas Mixing House
HBDElectronics HBD low voltage and signal electronics rack (located on east-central pedestal) HBD High Voltage Rack (located on Bridge)
HBDMounting Brackets Drilling and tapping bracket mounts for Support beams Brackets and I-beams installed
HBDMechanical Support HBD Support X, Y adjustments on this side HBD Support X, Y, Z adjustments on this side
HBDInstallation/Access CM scissor lift table Extensions (extends table 22” east & west; Steps up 8”)
HBDCabling/pipingplan 12” cable trays Panduit plastic cable organizers Hard pipe Flex pipe