HBD Status

HBD Status. C.Woody For the HBD team in 1008. HBD Meeting February 4, 2009. HV testing. Started flowing CF 4 at 2.5 lpm around mid-day on 1/28 Began first HV testing around mid-day on 1/29 (24 hrs  ~ 15 turnovers )

Télécharger la présentation

HBD Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD Status C.Woody For the HBD team in 1008 HBD Meeting February 4, 2009

  2. HV testing • Started flowing CF4 at 2.5 lpm around mid-day on 1/28 • Began first HV testing around mid-day on 1/29 (24 hrs  ~ 15 turnovers) - Started by applying 500V module by module to all 3 GEMs simultaneously using CAEN supply and monitoring current. Applied voltage through divider with resistors across GEMs removed ( 500V only if no current draw). If we saw a high current in a given module, we then checked each GEM individually. - All modules in the West were good (< 5nA) - Problem GEMs in the East: • Confirmed short on EN4M as seen at Stony Brook • EN4B - 135 nA @ 500V • EN5B - 19 nA @ 500 V • ES1B - 1000 nA @ 150 V; went to more than 4600 nA depending on voltage • Started conditioning EN4B, EN5B and ES1B - Initially conditioned through divider ( VGEM < Vapplied if substantial current draw) - Later applied voltage directly across GEM to ES1B • Status • EN4B - 134 nA @ 500 V (2/1, 21:00) • EN5B - 10 nA @ 500 V (1/31, 12:00) • ES1B - 950 nA @ 500 V (2/3, 17:30) C.Woody, HBD Group Meeting, 2/4/09

  3. Applying HV to detector Started applying HV to the West detector • Connected representative readout pad to the scope. Monitored noise and looked for any signs of discharge • Raised to 2500V in 500V steps, then to operating voltage in 100V steps Operating voltage = voltage from Tom’s table that gives a gain of 2000 Used corrected voltage, but did not correct for actual P/T ( ~ 2.67) • Started with WS5 with Fe55 source Saw nice spectrum (next slide) • All modules came up nicely without a problem • Held at operating voltage for few minutes and then reduced to 2500V • Lowered voltage to zero during magnet ramps • Raised voltage with magnets on All modules went to operating voltage and held for ~ 30 min with no problem C.Woody, HBD Group Meeting, 2/4/09

  4. Fe55 Spectrum for WS5 3788 V G~2000 C.Woody, HBD Group Meeting, 2/4/09

  5. Noise and other related issues • Relay Boards • Will install linear LV supplies in relay board rack (needs approval by Paul Giannotti) • Modified program so that after a trip, the relay to the LeCroy stays closed and only the discharge relay closes (dumps charge through 10K, stays closed for 10 sec, then opens) • Installed pigtail cables so that relay boards can be re-programmed without removing. Will update program to provide feature that if mesh or GEM channel trips, then the other will trip • RTD readout • Tested single channel Lakeshore and Omega readout units with new shielded cable going from HBD rack to HV feed through on detector. • Grounding shield at detector helped a lot. • Omega was ~ factor of 2 worse than Lakeshore (s up to ~ 3 chs) • Installed single Lakeshore with linear power supplies • Still needs cabling to Rob’s readout • Will install 2 new Lakeshores when they arrive in ~ 2 weeks C.Woody, HBD Group Meeting, 2/4/09

  6. Plan for the week • Raise voltage on East detector today - What to do with ES1 ? • What voltage do we want to leave on the detector for the Shift Crew ? • Implement improvements to HV program • Install linear power supplies in relay rack, connect RTD and measure noise • Continue to develop monitoring software C.Woody, HBD Group Meeting, 2/4/09

  7. Run Schedule thru March C.Woody, HBD Group Meeting, 2/4/09