Update on HBD Construction Status and GEMs Production for Weizmann Group

This report provides the latest updates on the HBD construction status for I. Ravinovich and the Weizmann Group. Currently, there are 58 tested GEMs in our database, comprising 42 standard and 16 gold-plated models. The next batch—Batch #5—which includes 7 standard and 10 gold-plated GEMs, is scheduled to be ready at CERN by mid-July. Additionally, we anticipate a further shipment from CERN (Batch #6) with 20 standard and 10 gold-plated GEMs. We also have 15 tested grids, with an upcoming production and shipment of 15 more within three weeks.

Télécharger la présentation

Update on HBD Construction Status and GEMs Production for Weizmann Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD construction status I. Ravinovich for Weizmann group I. Ravinovich

  2. HBD vessels I. Ravinovich

  3. GEMs and grids status • In the DB we have 58 tested GEMs: 42 Standard and 16 Gold plated. • The next batch # 5 (7 Standard and 10 Gold plated) will be ready at CERN by middle of July. • Later on we expect one shipment more from CERN, batch # 6 (20 Standard and 10 Gold plated). • In the DB we have 15 tested grids. We will produce and ship 15 more within 3 weeks. I. Ravinovich