1 / 10

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project. Session 4 CAPACITY BUILDING. 11 th December 2013 2 nd Steering Committee, Macapá. Introduction: Capacity building opportunities in the project

chace
Télécharger la présentation

REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REDD+ FOR THE GUIANA SHIELDTechnical Cooperation Project Session 4 CAPACITY BUILDING 11th December 2013 2ndSteering Committee, Macapá

  2. Introduction: Capacity building opportunities in the project • Four channels: 1) Country Level Support, 2) Working Groups, 3) Training and Technology Transfer, 4) Intersessional Meetings • Working Groups • Presentation of the concept and process so far • Validation of Terms of Reference • Training and Technology Transfer Plans • How these plans will be developed • Discussion Overview of Session 4

  3. Capacity building is a fundamental part of REDD+ for the Guiana Shield • A goal/objective in itself • A tool for reaching other goals/objectives of the project Introduction: The role of capacity building Capacity building: The process of developing someone’s ability to do something and to sustain this ability in the long term Provide lasting tools Provide lasting skills

  4. Improve the understanding of REDD+ • Get access to and learn to use related methodologies and tools Capacity building on different levels

  5. Four channels for capacity building: Country/state level support ”à la carte” Working Group meetings 150 000 Euro 70 000 Euro Capacity building opportunities 30 % of project budget Intersessional meetings before SC Training and technology transfer 150 000 Euro 216k + 80k Euro

  6. Objectives of each capacity building channel

  7. Targeted audience Formats

  8. Outcomes / Results

  9. Frequency Number of events

  10. MERCI /THANK YOU /DANK U /OBRIGADA sara.svensson@onfinternational.com http://www.onfinternational.com Photo credit: ONF Guyane

More Related