An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DIRT PARK FÖRSLAG TILL EN UNGDOMS ATTRAKTION I ÄLMHULT Bakgrund Målsättning Förslag Kostnadskalkyl Tid för frågor over view

  2. SMALL JUMPS Size diagram Core STRUCTURE BACK

  3. WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. A 20-30 cm THICK LAYER OF SAND/DIRT. CONCRETE CORE SO THAT THE JUMP/BUMP KEEPS IT’S SHAPE. WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY. BACK

  4. TOTAL VOLUME = 0.2m³ TOTAL GROUND AREA COVERED = 1.04m² BACK

  5. THESE ARROWS SHOW IN WHAT WAY/ORDER YOU ARE TO MAKE YOUR WAY AROUND THE TRACK. YOU ARE HOWEVER NOT MEANT TO RIDE TO PARTS THAT ARE ABOVE YOUR OWN PERSONAL LEVEL OF RIDING. BACK

  6. TECHNICAL TRACK Size diagram BACK

  7. TECHNICAL MAIN TRACK WHIP BOARD ADD TO TECHNICAL COURSE BACK

  8. Dirt Jump Core STRUCTURE Size diagram BACK

  9. WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. CONCRETE CORE SO THAT THE JUMP/BUMP KEEPS IT’S SHAPE. A 10-20 cm THICK LAYER OF SAND/DIRT. WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY. BACK

  10. Sizes L M S BACK

  11. 201,5 cm 62 cm 530,1 cm 164,3 cm 160 cm TOTAL VOLUME = 3.63m³ TOTAL GROUND AREA COVERED = 8.49m² BACK BACK

  12. TOTAL VOLUME = 13.86m³ TOTAL GROUND AREA COVERED = 14.3m² 185,6 cm 350 cm 272 cm 160 cm BACK

  13. TOTAL VOLUME = 6.78m³ TOTAL GROUND AREA COVERED = 8.8m² 110 cm 550 cm 165 cm 160 cm BACK

  14. HIGHT ABOVE GROUND = 155 cm TOTAL GROUND AREA COVERED = 70 m² 35 m 6 m BACK

  15. BACK

  16. 375 cm 450 cm 836.25 cm 45° BACK

  17. 1100 cm 450 cm 300 cm 350 cm 450 cm 350 cm BACK

  18. 450 cm 1100 cm BACK

  19. PLATFORM IN PROFILE Platform frontal 3D view BACK

  20. CONCRETE CORE SO THAT THE PLATFORM KEEPS IT’S SHAPE. WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. A 10-20 cm THICK LAYER OF SAND/DIRT. WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY. BACK

  21. Start Platform Core structure BACK Size

  22. Kostnadskalkyl Mark 1400m2 SKÄNKES AV KOMMUNEN Eventuellt markarbete 15,000 SEK Trävirke (formar) 10,000 SEK Cement 42m³ 40,000 SEK Sand 32m3 8,500 SEK Specielkapade träd för teknisk del 15,000 SEK (eventuell sponsring) Byggnadstid, snickeri & gjutning 25,000 SEK 100 timmar TOTAL KOSTNAD 85.125 SEK (73,875) exklusive moms

  23. http://www.beijerbygg.se/default.aspx?id=11080 http://www.starka.se/aterforsaljarstod.asp http://www.jehander.se/WebSites/Jehander/Start/Stockholm http://www.imba.org.uk/index.php?page=AboutUs_Contacts http://www.freeridehub.se/43.html

  24. LENGHT = MAX 70m Teknisk del Fart hinder kurvan WIDTH = MAX 25m start S S S M M M L L L Större hopp Större hopp Större hopp

  25. Presentation för Älmhults kommun 25 April 2007 • Bakgrund • Målsättning • Förslag • Kostnadskalkyl • Tid för frågor