1 / 17

Bill of Materials in Odoo 13

Manufacturing a product requires a lot of components or raw materials. For the production of any product, it may require multiple components or with the same components, different products or product variants can be manufactured. Such a list of raw materials is commonly known as the Bill Of Materials (BoM).<br><br>

Télécharger la présentation

Bill of Materials in Odoo 13

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bill of Materials in Odoo13 www.cybrosys.com

  2. INTRODUCTION • Manufacturing a product requires a lot of components or raw materials. • For the production of any product, it may require multiple components or with the same components, different products or product variants can be manufactured. • Such a list of raw materials is commonly known as the Bill Of Materials (BoM). In order to proceed with a manufacturing order for a specific product, the BoM of that specific product must be selected from the list of BoM.

  3. One should also check whether all the raw materials required to manufacture the product are present in the product list • Through forming a BOM, the engineering team that refers to the design of a product and manufacturers who produce products start the assembly process. • One can either create a Bill of Materials by simply clicking the smart button ‘Bill of Materials’ in the product form. • Or one can create through Manufacturing - Master Data- Bill of Materials and click on Create.

  4. Here, one should add the final product at ‘Product’ and quantity of that particular product to be manufactured at ‘Quantity’. • Under the components tab, Click on ‘Add a Line’ to add raw materials or the Bill of Materials to manufacture the product. • Add BoM and then Save.

  5. GotoManufacturing >Master Data> Bills of Materials

  6. Create BOM : Select product >Provide BOM type , Components

  7. Set screw and bolt as consumable products>For Table top set routes > Create BOM

  8. Create BOM for Table top component >Save

  9. Then goto Operations > Manufacturing orders > create

  10. Click on the check availability

  11. Click on > Mark as Todo

  12. Click on check availability

  13. Goto manufacturing orders > Select Order for Table top >Mark as Done

  14. Get back to the manufacuringorder > check availability > Mark as Done

  15. For More Details Check our company website for related blogs and Odoo book. Odoo 13 Manufacturing Check our YouTube channel for functional and technical videos in Odoo. Bill of Materials in Odoo 13

  16. Thank You

More Related