1 / 16

Busch-Hungária Kft. Overview

Busch-Hungária Kft. Overview. Brief history. Rába Foundry built in 1972 Joint Venture Rába Automotive Holding – M.Busch GmbH & Co.KG (member of BPW group) JV contract signed: 26.09.2007. Start of operation: 01.01.2008 Capital Stock 20 Mio . € Investment in new equipment

cid
Télécharger la présentation

Busch-Hungária Kft. Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Busch-Hungária Kft. Overview

  2. Brief history • Rába • Foundry built in 1972 • Joint Venture Rába Automotive Holding – M.Busch GmbH & Co.KG(member of BPW group) • JV contract signed: 26.09.2007. • Start of operation: 01.01.2008 • Capital Stock 20 Mio. € • Investment in new equipment • Shares 2008: M.Busch 74,5%Rába 25.5% • BPW Group • Shares 2010: M. BUSCH + BPW Wiehl 100%(29.03.2010)

  3. The owners • 1. BPW BergischeAchsenKommanditgesellschaft • Leading manufacturer of axles and intelligent suspension systems for the commercial vehicle industry • Founded in 1898 • Production sites worldwide: 10 • Employees worldwide: 5.000 • http://www.bpw.de/ • 2. M.BUSCH GmbH & Co. KG • Grey iron foundry of the BPW Group • Main products are: brake discs and drums, flywheels, transmission casings • Founded in 1830 • Employees: 500 • http://www.m-busch.de/

  4. Where we are? Wien Győr Budapest

  5. Products

  6. Melting • Equipment • ABP Melting furnace • 7,5 t/ Hour • Induction • Investment 2000 • ABB Holdingfurnace– 60 T • Tundish Cover Treatment

  7. Core Shop • Equipment • Laempecoremakingmachines(Cold Box) • Automatic blender • Automatic coatingconveyor • Core drying cabinet • Röperwerkcoremakingmachine(for small batches) • Investment 2008-2012 • 2. Core box size • 550 x 700 x 900 mm

  8. Moulding • Equipment • Künkel-Wagner moulding line • 115 Flasks / Hour • AIR PRESS Technology  impulse compression • Künkel-Wagner sand preparation • (150 T / Hour) • Investment 2008-2012 • Flask size • 1000 x 1100 x 350/250 mm

  9. Pouring • Equipment • PUMA pouring robot • Syncron pouring • Process monitoring system • Investment 2011

  10. Shot blasting and grinding • Equipment • Conveyor Line (M&N) • Shot Blasting (WGT) • Clansman Manipulator • Automatic camera control system • Automatized grinding (Robot) • Investment 2009-2012

  11. Material quality • Standard qualities • Special qualities • GGG650-6 (Rm=650 MPa, A5=6%) • Advantage: • - Higherresilience • - Weight reduction

  12. Process control • Laboratory • New sand laboratory (Simpson)  Investment 2011 • New Spectrometer (ARL)  Investment 2011 • New mechanical laboratory  Investment 2010-2011 • Tensile test station (INSTRON) • Automatic microstructure examination (SPEEDXT3)

  13. Process control • Process monitoring • SPC-SYSTEM • Investment 2012 – data collecting system • Measuring system • GOM optical measurement (ATOS GOM2) • Investment 2012 • Automatic camera control • 100% control • Investment 2012

  14. Product Management / Planning • Personal • 3x CAD Engineers (Pro-E) • 2x Project managers • 1x Technology planning • German / English • Software • Pro-E, Creo • Windchill • MagmaSoft

  15. Qualifizierung • ISO 14001:2004 • ISO 9001:2008 • ISO/TS 16949:2009 • Planed: October 2012

  16. Production Increase of melting capacity: 7,5 t/h => 13 t/h

More Related