RAPAT KOORDINASI TRIWULAN II TAHUN 2013

PT PLN ( Persero ) Pe mbangkitan Sumatera Bagian Selatan. RAPAT KOORDINASI TRIWULAN II TAHUN 2013. Tiga perspektif mewujudkan Visi Direktorat Operasi :. Operasional & Capital Efficiencies Product & Servi ce Qu a lity. Efisien Andal Berkualitas.

cissy
Télécharger la présentation

RAPAT KOORDINASI TRIWULAN II TAHUN 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PT PLN (Persero) Pembangkitan Sumatera Bagian Selatan RAPAT KOORDINASI TRIWULAN II TAHUN 2013

  2. Tiga perspektif mewujudkan Visi Direktorat Operasi : • Operasional & Capital Efficiencies • Product &ServiceQuality Efisien Andal Berkualitas • Operation Performance Improvement (OPI) • Enterprise Asset Management (EAM) Kinerja Teknis • Mindset • Capability • Leadership Program Unggulan Proses Bisnis KPI Proses Bisnis Mindset, Kompetensi & Leadership

  3. Program Kerja Utama 2013 - Sumatra

  4. REALISASI NKO SMT 1-2013

  5. REALISASI NKO SMT 1-2013

  6. PROGRAM UNGGULANSMT 2 TAHUN 2013)

  7. PROGRAM UNGGULANSMT 2 TAHUN 2013)

  8. RASIO PEMAKAIAN MATERIAL S/DSMT 1-2013)

  9. Aliran Daya Beban Puncak Tertinggi Juni2013 NAD 253MW 1428MW Keterangan: 170MW 83MW Subsistem : KIT > Beban Subsistem : KIT < Beban Sumut Subsistem : KIT > / < Beban 1383MW 317MW SBU, Senin 10 Juni 2013, 19:30 WIB -MW Daya Mampu : 1598MW Beban Puncak : 1605MW Riau 395MW 78MW Sumbar Jambi 206MW 410MW 224MW 194MW 314MW 943MW 212MW 114MW 227MW Sumsel 619MW Bengkulu SBST, Jumat 7 Juni 2013, 18:30 WIB 226MW 113MW Daya Mampu : 2553MW Beban Puncak : 2563 MW Defisit di SBT : 71 MW Lampung 774MW 548MW

  10. REALISASI ALIRAN DAYA SUMATERA SAAT BEBAN PUNCAK 2013 Sumut BP = 1.378MW KIT = 1.480MW KTPNG RTPAT Riau Trf dr Sumut 33 MW 33MW SumSel BP = 640MW KIT = 1024MW Jambi BP = 265MW KIT = 205 MW Riau BP = 463MW KIT = 339MW PKBDN 60 MW PBLIH ADURI 384 MW KTPJG LNGSA 60MW 124MW Aceh BP = 267MW KIT = 207MW MBNGO PKMBH Lampung BP = 727MW KIT = 495MW Sumbar BP = 440MW KIT = 399,7MW OBLIN LBGAU KLRJO 192MW 252MW 170MW 232MW BNGKO LAHAT BKSAM BKMNG BTRJA 100MW PKLGN SBU, 28 Maret 2013 SBST, 14 Mei 2013 Bengkulu BP = 114MW KIT= 214MW KIT : 2.677,8MW Beban Puncak : 2.637,7 MW DMP : 1.687MW Beban Puncak : 1.654MW

  11. Fuel Mix SistemSumbagselteng Juni 2013 MWhProduksiberdasarkanenergi primer

  12. Supply Gas Sistem Sumbagsel BACEH BIREN PERTAMINA TALISMAN (Jambi Merang) Payoselincah JPH : 25 BBTU/D DMP : 2x50 MW LNGSA PERTAMINA UBEP Sei Gelam JPH : 2 BBTU/D DMP : 12 MW PBDAN 80 MW PT EHK Payoselincah JPH : 18 BBTU/D DMP : 83 MW RTPAT KTPNG BBATU KTPJG PT MEDCO E&P Borang JPH : 18,3 BBTU/D DMP : 81 MW 130 MW PYBUH PERTAMINA TAC SEI GELAM Sei Gelam JPH : 2,5 BBTU/D DMP : 90 MW (peaker) KLJAO MBNGO 180 MW PSLCH PT PERTAMINA EP + MEDCO E&P Keramasan JPH : 15 + 22.3 BBTU/D DMP : 115 MW BNGKO 250 MW 3 2 5 4 1 6 7 LBGAU PT PGN Talang Duku JPH : 8 BBTU/D DMP : 31 MW PKLGN 100 MW BTRJA 230 MW BKMNG PDPDE Jakabaring JPH : 3 BBTU/D DMP : 52,5 MW (peaker) Total JPH : 131,1 BBTUD DMP : 609,5 MW KLNDA PT MEDCO E&P Indralaya JPH : 17 BBTU/D DMP : 45 MW

  13. RealisasiPenyerapanGas Tahun 2013 (1) JPH = 22.3 PLTG SewaKeramasan# 1 Gangguan bearing temperature high, setelah pelaksanaan HGPI tanggal 1 Jan – 16 Apr 2013 Sisa GMU 795.746 MMBTU per Juni 2013 JPH = 15.0

  14. RealisasiPenyerapanGas Tahun 2013 (2) JPH = 18.3 • PLTG Borang #1 • Gangguan turbin 7 Feb – 22 Apr 2013 • PLTG Borang #2 • Gangguan inlet screen 17 Mar – 11 Apr 2013 • Sisa GMU 7.458.306 MMBTU per Juni 2013 JPH = 24.0 / 17.0 • PLTG Indralaya GT 1.1 • pekerjaan CI tanggal 15-18 Jan 2013 • PLTGU Indralaya GT 1.2. • pekerjaan CI tanggal 29 Apr – 12 Mei 2013 • PJBG Per 1 Mei 2013 diperpanjang • s.d Agustus 2013 dgn JPH 17 BBTUD

  15. RealisasiPenyerapanGas Tahun 2013 (3) JPH = 8.0 • PLTG TalangDuku #1 • gangguanturbinsejak 12 Jan 2013 • PLTG TalangDuku #2 • penggantian expansion joint exhaust • tanggal 1 – 10 Mei 2013 • Gangguankabel power terbakar • tanggal 4 – 23 Juni 2013 • PLTG Jakabaring mulai beroperasi sejak tanggal 21 Feb 2013 • PLTG Jakabaring # 2, stop operasi kendala pasokan gas tanggal 3-18 April 2013 JPH = 3.0

  16. RealisasiPenyerapanGas Tahun 2013 (4) • PLTG Batang Hari #2 • Combustion Inspection + • tanggal 12 - 29 Juni 2013 JPH = 18.0 JPH = 25.0

  17. RealisasiPenyerapanGas Tahun 2013 (5) JPH = 2.0 JPH = 2.5 / 5.0 • PLTMG beroperasi sejak 22 Maret 2013 pada beban 24 MW ke Jaringan 20 kV masih terkendala Transmisi 150 kV belum selesai • JPH menjadi 5 BBTUD sejak 15 Mei 2013

  18. Review Penyerapan Gas Tahun 2013 • KERAMASAN : • Sisa Gas Make Up (GMU) diKeramasan per 30 Juni 2013 sebesar 796 BBTU. Periodepengambilanberakhirs.d November 2013.Dibutuhkan rata-rata minimum penyerapanhariansebesar24.2BBTUD. Rata-rata realisasi penyerapan per hari 21 BBTUD, sehingga kemungkinan yang tidak terserap 486 BBTU. • Diperlukan amandemen perpanjangan waktu pengambilan GMU dengan memperhitungkan rata-rata realisasi penyerapan gas harian di Keramasan dan Borang. • PLTGU Keramasan (JICA) sudahsiapuntuk first firing & start up, masihterkendalapenyesuaiantekanan gas dariPertamina. • Opsipenyelesaian : • Penyesuaiantekanan gas Medco & Pertaminabersamaan (belumdapatdilaksanakan) • Pemisahanoperasiantarajalur gas Medco & Pertamina (perlukoordinasidengan P3BS terkaitpenurunanpasokandayakesistem. • Pemasangankompresor gas sendiri (untukpengoperasianjangkapanjangsetelah PJBG Medco berakhir, jikamenggunakan gas Pertamina, danPertaminatidakdapatmenyesuaikantekanan)

  19. Review Penyerapan Gas Tahun 2013 MERAH MATA : Sisa Gas Make Up (GMU) diBorangper 30 Juni 2013 sebesar 7.458 BBTU. Periodepengambilanberakhirs.dAgustus 2014. Dibutuhkan rata-rata minimum penyerapanhariansebesar 21.9 BBTUD. Rata-rata realisasi penyerapan per hari 17 BBTUD, sehingga kemungkinan yang tidak terserap 1.664 BBTU. Diperlukan amandemen perpanjangan waktu pengambilan GMU dengan memperhitungkan rata-rata realisasi penyerapan gas harian. Masakontrak PLTG BOT BorangakanberakhirTahun 2018, sehinggaperludilakukanupayamendapatkanpasokan gas tambahansetelah PJBG berakhir. INDRALAYA : PJBG akan berakhir pada Agustus 2013 dengan JPH 17 BBTUD. Saat ini dalam proses perpanjangan PJBG dengan JPH 10 BBTUD (Sep-Nov 2013) dan 17 BBTUD (Des 2013 – Mar 2015).

  20. Review Penyerapan Gas Tahun 2013 TALANG DUKU : Untukmenyerap gas pada JPH 8 BBTUD, PLTG TalangDuku #2 & #3 saatiniberoperasibaseloaddenganbeban total 31 MW. PLTG TalangDuku #1 tidakdapatberoperasisejak 12 Januari 2013 akibatindikasi crack pada hot part, sesuaihasilBorescope Inspection. Saatinisedangdalampelaksanaan Major Inspection sejak 24 Juni – 7 Agustus 2013. • JAKABARING : • PLTG Jakabaring beroperasi dengan pola : • Beban 3 x 18 MW selama 6 jam/hari (kondisi normal) • Beban 2 x 18 MW selama 9 jam/hari (salah satu unit pemeliharaan) • Diperlukan koordinasi dengan Dispatcher P3BS yang lebih baik untuk pengaturan operasi di Jakabaring.

  21. Review Penyerapan Gas Tahun 2013 PAYO SELINCAH : Pemakaian gas dari PTJM sebesar 25 BBTUD akan direduksi dengan memaksimalkan pemakaian gas dari EHK. Sehingga diperlukan koordinasi dengan EHK untuk mendapatkan nominasi gas harian maksimal. SEI GELAM : PLTMG SeiGelamPeaker 90 MW sudahberoperasisejak 22 Maret 2013. Saatini unit hanyadapatberoperasibaseloadpadabeban 24 MW danmasukkeJaringan 20 kV. Pengoperasianpada full load sebagaipeakerbelumdapatdilaksanakankarenaterkendalabelumsiapnyaTransmisi 150 kV. Akibatnyapenyerapan gas tidakmasksimal, sehinggaberpotensiterhadaptimbulnya GMU. PLTMG SeiGelam 12 MW beroperasi normal, namunadaindikasipenurunantekananpadasumur gas, sehinggaberpengaruhpadapenurunanpasokan gas.

  22. CATATAN SEMESTER 2 TAHUN 2013 • Penyeragam Format Berita Acara Sewa Pembangkit dengan Cut Off setiap tanggal 10 bulan berikutnya. • Laporan Pengusahaan agar dilengkapi dengan Executive Summary (OEE, Evaluasi dan catatan kejadian khusus selama periode laporan). • Tindaklanjut Risk Survey yang telah dilaksanakan di Unit Sektor agar segera ditindaklanjuti dan dilaporkan, sangat berpengaruh kepada Besaran Premi Asuransi yang harus dibayar.

  23. Terima Kasih