1 / 13

CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

Evaluation Schedule for CJK EVAL SIG. CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt.com.cn. Contents. 고객상담센터 조직구성 및 운영계획. Introduction ChEG Evaluation Schedule Simulation Model and Assumptions CJK Eval SIG Time Schedule(Proposal). Introduction. 고객상담센터 조직구성 및 운영계획.

coen
Télécharger la présentation

CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation Schedule for CJK EVAL SIG CJK#20 B3G-WG CCSA Wang Li wangli@mail.ritt.com.cn

  2. Contents 고객상담센터 조직구성 및 운영계획 • Introduction • ChEG Evaluation Schedule • Simulation Model and Assumptions • CJK Eval SIG Time Schedule(Proposal)

  3. Introduction 고객상담센터 조직구성 및 운영계획

  4. ChEG Evaluation Schedule 고객상담센터 조직구성 및 운영계획 • Output the evaluation result of • 802.16mtechnology • …… Sep ’09 • Evaluate basic radio characteristics • (e.g., geometry distribution, large scale loss distribution) • Output the evaluation result of LTE-Advanced technology • Compare the resultswith other companies or Eval Groups May ’09 • Focus on the SCM channel before Apr ’09 • Check the accuracy of SLS Apr ’09

  5. Simulation Model and Assumptions(1) 고객상담센터 조직구성 및 운영계획

  6. Simulation Model and Assumptions(2) 고객상담센터 조직구성 및 운영계획

  7. Simulation Model and Assumptions(3) 고객상담센터 조직구성 및 운영계획

  8. Some Ideas 고객상담센터 조직구성 및 운영계획 • We would be glad to discuss IMT-A channel items with CJK Eval SIG colleagues

  9. Apr Jul Apr Apr Oct Oct Jan Apr Jan Jul Jan Apr Jul Apr Jul Oct Jul Jan Oct Apr Oct Jul Jan Jul Oct Oct Jan Aug Feb Feb Nov Feb Feb May Aug Aug Nov May Nov May Nov Nov Feb Feb May May Aug Aug May Nov May Aug Nov Aug Sep Sep Jun Dec Jun Mar Dec Sep Sep Dec Dec Dec Jun Sep Jun Mar Dec Mar Jun Jun Mar Mar Dec Jun Mar Sep Sep Q1 Q1 Q1 Q2 Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4 CJK Eval SIG Time schedule for IMT-A Evaluation (Proposal) 2008 2009 2010 May’09 Conference Call for checking the resultof IMT-A channel CJK Eval SIG Link Level Conference for checking the resultof SNR-BLER curves of LLS Apr ’09 Conference for checking the resultof 802.16m system Conference Call for checking the geometry distribution and large scale loss of LTE-A system Sep ’09 System Level May’09 Apr ’09 Conference for checking the resultof any other candidate technologies ITU-R IMT Advanced IMT.EVAL Oct ’08 Conference for checking the resultof user throughput and the cell edge user spectral efficiency of LTE-A system Jan’09 Oct ’09 Proposal Submission IMT.RADIO Jun ’10 Proposal Evaluation & Consensus Building Develop Recommendation ITU-R WP5D

  10. ANNEX : Part of Simulation Results

  11. Geometrey Distribution

  12. Large Scale Loss(Urban Macrocell and Suburban Macrocell)

  13. Thank you!

More Related