1 / 41

IEEE 802.18 RR-TAG Teleconference Agenda

IEEE 802.18 RR-TAG Teleconference Agenda. Dates: 05 July 18. Authors:. Call to Order / Administrative Items. Number of voters: 41 (8 on EC); Nearly voters: 1 ; Aspirant members: 9 With teleconferences approval on 08 March 2018, quorum is met. Required notices

colum
Télécharger la présentation

IEEE 802.18 RR-TAG Teleconference Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.18 RR-TAGTeleconference Agenda • Dates: 05 July 18 Authors: Jay Holcomb (Itron)

  2. Call to Order / Administrative Items • Number of voters: 41 (8 on EC); Nearly voters: 1; Aspirant members: 9 • With teleconferences approval on 08 March 2018, quorum is met. • Required notices • Affiliation FAQ - http://standards.ieee.org/faqs/affiliationFAQ.html • > Be sure to announce you name, affiliation, employer and clients the first time you speak. • Anti-Trust FAQ - http://standards.ieee.org/resources/antitrust-guidelines.pdf • Ethics - https://www.ieee.org/about/corporate/governance/p7-8.html • IEEE 802 WG Policies and Procedures - http://www.ieee802.org/devdocs.shtml • The 4 administration slides, reminder from your WG opening plenary  new 02jan18 • (note: call for essential patents is n/a, as the RR-TAG does not do standards) • Officers for the RR-TAG / IEEE 802.18: • Chair is Jay Holcomb (Itron) • Vice-chair is open • Secretary is Allan Zhu (Huawei) Jay Holcomb (Itron)

  3. Jay Holcomb (Itron) Other Guidelines for IEEE WG Meetings • All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. • Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. • Don’t discuss specific license rates, terms, or conditions. • Relative costs of different technical approaches that include relative costs of patent licensing terms may be discussed in standards development meetings. • Technical considerations remain the primary focus • Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. • Don’t discuss the status or substance of ongoing or threatened litigation. • Don’t be silent if inappropriate topics are discussed … do formally object. --------------------------------------------------------------- For more details, see IEEE-SA Standards Board Operations Manual, clause 5.3.10 and Antitrust and Competition Policy: What You Need to Know at http://standards.ieee.org/develop/policies/antitrust.pdf

  4. Participation in IEEE 802 Meetings • Participation in any IEEE 802 meeting (Sponsor, Sponsor subgroup, Working Group, Working Group subgroup, etc.) is on an individual basis • Participants in the IEEE standards development individual process shall act based on their qualifications and experience. (https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1) • IEEE 802 Working Group membership is by individual; “Working Group members shall participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives”. (subclause 4.2.1 “Establishment”, of the IEEE 802 LMSC Working Group Policies and Procedures) • Participants have an obligation to act and vote as an individual and not under the direction of any other individual or group. A Participant’s obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. • Participants shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1.3 and the IEEE 802 LMSC Working Group Policies and Procedures, subclause 3.4.1 “Chair”, list item x. • By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. (and please leave the call.) Jay Holcomb (Itron)

  5. Agenda • Discussion items, few more details: • EU Items • what is the latest from members. Anything we should respond to? • Ofcom-consultation-on-preparations-for-wrc-19 • Review their questions on AIs we have view points on. • Due 13 Sept. • NPRM, Expanding Flexible Use of 3.7 to 4.2GHz Band • Will be brought up at FCC open meeting next Thursday. • Do we listen in on the first part of FCC open meeting? • Any new ideas, on IEEE 802 6GHz single voice? • To bring up to the EC as a whole • Invite to TR-51 Smart Utility Networks meeting 13 July • RSVP needed • Agenda for San Diego • General Agenda • Call to Order • Attendance server is open • Administrative items • Need a recording secretary • Approve agenda & last minutes • Any interest in being the 802.18 Vice-Chair? • Discussion items • EU Items • Ofcom consultation • NPRM on 3.7 to 4.2 GHz Band • IEEE 802 6GHz single voice • TR-51 SUN meeting invite • Agenda for San Diego • Actions required • What happens during the call • AOB and Adjourn Jay Holcomb (Itron) Agenda

  6. Motions - administrative • Motion: To approve the agenda as presented on previous slide • Moved by: John Notor (Notor Research) • Seconded by: James Lepp (Blackberry) • Discussion? • Vote: Unanimous consent • Motion: To approve minutes from the IEEE 802.18 teleconference on 28 June 2018; https://mentor.ieee.org/802.18/dcn/18/18-18-0075-01-0000-minutes-28june18-rr-tag-teleconferece.doc; Originally Posted: 05-Jul-2018 12:52:25 ET • Moved by: Allan Zhu (Huawei) • Seconded by: John Notor (Notor Research) • Discussion? • Vote: 6 – Y; 0 –N; 1-A Jay Holcomb (Itron)

  7. EU items • Anything to share on the EU front? • ETSI – BRAN – meeting #99 – 18-21 Sept • Last week: • BRAN(18)098007r1_Minutes_of_BRAN98 • The new work item in BRAN(18)098002 was adopted. • Technical Report on WAS/RLANs in the band 6 725 MHz to 7 125 MHz • Latest SRDoc on 60GHz just posted. • ETSI - ERM - TG-11 • From previous calls: EN 300 328 (v2.2.1 (2018-04)) - Draft accepted by ERM and receipt by ETSI Secretariat on 07 June; Now to National vote. ERM(18)065022r3; • https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=51206 Jay Holcomb (Itron)

  8. EU items -2 • CEPT – ECC SE45 • Next f2f: 13 August (afternoon) -14 August 2018, ECO, Copenhagen, Denmark • CEPT – ECC FM57 • Next meeting 18 July, a web-meeting. • Any other EU news? Jay Holcomb (Itron)

  9. Ofcom - WRC-19 • OfcomConsultation: UK preparations for the World Radiocommunication Conference 2019 (WRC-19) • https://www.ofcom.org.uk/consultations-and-statements/category-1/uk-preparations-wrc-19 • https://mentor.ieee.org/802.18/dcn/18/18-18-0069-00-0000-ofcom-consultation-on-preparations-for-wrc-19.pdf • The closing date for responses is 13 September 2018. (To EC by 16 or 23 Aug) • There are 32 questions Ofcom is asking. • We should focus on AIs from our view point document; 1.12, 1.13, 1.15, 1.16, 9.1 and 10. • 1.1 This consultation calls on stakeholders to help us play an important part in shaping the regulations that govern how the world’s radio spectrum is used. It sets out the key issues to be discussed at next year’s World Radiocommunications Conference (WRC-19) – and spells out our early thinking on the outcomes we’d like to achieve. It also explains the engagement process which Ofcom manages in order to allow stakeholders to feed into the development of UK positions for the WRC. • 1.2 Among the areas for discussion at WRC-19 are use of spectrum for mobile broadband – including next generation 5G. Decisions taken at the conference on this and other matters could affect thousands of UK businesses and consumers. Jay Holcomb (Itron)

  10. Ofcom - WRC-19 -2 • Questions related to the AIs from our view points: • Question 1: Do you agree with the prioritisation of the agenda items, as shown in Annex 5, and if not why • Question 2: Ofcom is supporting the following three priority bands for IMT identification in the RRs: 24.25 – 27.5 GHz 40.5-43.5 GHz (as part of a wider global 37-43.5 GHz tuning range) 66 – 71 GHz If you don’t agree with any of these bands, or think we should be promoting other bands, please provide justification for your views. • Question 3: What are your views on the suitability of the currently identified bands for HAPs and do you think there is a requirement for additional spectrum? Recognising that we support 26 GHz as a global band for IMT under agenda item 1.13, what are your views on the bands currently under study for HAPs, both globally and in ITU-R Regions? • Question 4: What are your views on the bands within scope of Agenda Item 1.16 and their suitability for Wi-Fi and Wi-Fi like services? Do you agree that Ofcom should support the CEPT position of No Change? If not, please provide evidence to support your view. Jay Holcomb (Itron)

  11. Ofcom - WRC-19 -3 • Questions related to the AIs from our view points: • Question 5: Do you agree that UK support the inclusion of the updated Recommendation M.1849-1 (“Technical and operational aspects of ground-based meteorological radars”) in footnote No.5450A? What are your views on the requirement to include a reference to ITU-R Recommendation ITU R M.1638 1 in footnotes No.5447A and 5.450A and the potential impact upon Wi-Fi (and similar technologies)? • Question 21: What are you views on Agenda Item 1.12 and do you agree that there is no requirement for specific identification to ITS in the Radio Regulations? • Question 27: What are your views on Agenda Item 1.15, particularly on the protection needs of passive services? • Question 32: What changes to the Radio Regulations have you identified that would benefit from action at a WRC and why? Do you have any proposals regarding UK positions for future WRC agenda items or suggestions for other agenda items, needing changes to the Radio Regulations, that you would wish to see addressed by a future WRC? Jay Holcomb (Itron)

  12. Ofcom - WRC-19 -4 • Other possible questions: • ? Question 6: Do you agree that UK support a position of not making changes to the Radio Regulations to reference specific bands for M2M/IoT usage? • Should ask 802.15 if they have any interest on this one. • ? Question 13: Do you have any views on the bands being studied and are there any other considerations which you think should be taken into account? What are your views on the appropriateness of the current emission limits in the band 3 700 – 4 200 MHz? • This question we may want to comment on, as in the context there is 6GHz. Though need to work out the IEEE 802 as a whole consensus. • Will walk through a markup draft and are the questions ID’d appropriate. And setup for San Diego to start on our comments. Jay Holcomb (Itron)

  13. FCC – Open Meeting next week • Expanding Flexible Use of the 3.7 to 4.2 GHz BandThe Commission will consider an Order and Notice of Proposed Rulemaking that would continue the Commission’s efforts to make mid-band spectrum in the 3.7-4.2 GHz band available for expanded flexible use, primarily by seeking comment on mechanisms for clearing for mobile use and whether to allow point-to-multipoint use on a shared basis in portions of the band. To inform the Commission’s decision-making on the future of the band, it would also collect information from FSS earth stations and space stations to provide a clear understanding of the operations of current users. (GN Docket Nos. 18-122, 17-183; RM Nos. 11778, 11791) • Cellular Reform Third Report and Order • Children’s Television Programming Rules • Emergency Alert System and Wireless Emergency Alerts • Nationwide Number Portability • Formal Complaint Rules Consolidation Order Jay Holcomb (Itron)

  14. FCC – Flexible Use of the 3.7 to 4.2 GHz Band • Mentor: https://mentor.ieee.org/802.18/dcn/18/18-18-0076-00-0000-nprm-3-9-4-2ghz-gn-18-122.pdf (note: this is a ‘draft’ NPRM) • ECFS: https://www.fcc.gov/ecfs/search/filings?proceedings_name=18-122&sort=date_disseminated,DESC • Do we delay start of Thursday AM2 until after this agenda item and present the open meeting until then? • Yes, this would be fine. • For those attending the FCC open session, they can get attendance credit for Thursday AM1. • Did not walk through the NPRM for areas we may want to comment on? • With this a draft more changes are anticipated before the actual NPRM. • So this version more an FYI to see what could be in the final NPRM. • Do any of the WGs have interests in this band now it is moving to a NPRM? Jay Holcomb (Itron)

  15. IEEE 802 on 6GHz • At a high level, any new thoughts on how to get IEEE 802 to a single voice on where to take the 6GHz band? • To bring up at the EC opening meeting. • Licensed incumbents have a strong voice with the commission, more than the UWB unlicensed incumbents. • Protection of the (licensed) incumbents will be key. • To go in with 2 opposing views or no inputs at all, both have pluses and minuses. • Note: 802.11ax CoEx documents failed in an 802.19 vote. Jay Holcomb (Itron)

  16. TR-51 SUN meeting invite • TIA's Director of Smart Building Programs, LimorSchafman, will be in San Diego. • TIA's Director of Global Standards Programs, Victoria Mitchell has invited interested 802 participants to attend their TR-51 Smart Utility Networks meeting next Friday 13 July.   • if interested in attending please RSVP to Victoria.   • Victoria Mitchell, Director, Global Standards Programs Telecommunications Industry Association (TIA) vmitchell@tiaonline.org Jay Holcomb (Itron)

  17. Agenda – Plenary San Diego • Discussion items, few more details: • EU Items • what is the latest from members. Anything we should respond to? • Ofcom-consultation-on-preparations-for-wrc-19 • Work on IEEE 802 comments on the Ofcom questions on AIs we have view points on. • Due 13 Sept. • NPRM, Expanding Flexible Use of 3.7 to 4.2GHz Band • Will be brought up at FCC open meeting Thursday. • Do we listen in on the first part of FCC open meeting? • Any new ideas, on IEEE 802 6GHz single voice? • To bring up to the EC as a whole • Invite to TR-51 Smart Utility Networks meeting 13 July • RSVP needed • Thursday: • Possibly listen to first part of FCC Open meeting • Topics brought up Tuesday • Time for teleconferences • Discuss to move start 30 mins later; 15:00ET • Motion for teleconferences though December 2018 • Call to Order • Attendance server is open • Administrative items • Need a recording secretary • Approve agenda & last minutes • Any interest in being the 802.18 Vice-Chair? • Discussion items • EU Items • Ofcom consultation • NPRM on 3.7 to 4.2 GHz Band • IEEE 802 6GHz single voice • TR-51 SUN meeting invite • Time for teleconferences • Teleconferences through December • Actions required • What happens during the call • AOB and Adjourn Jay Holcomb (Itron) Agenda

  18. Actions Required Jay Holcomb (Itron)

  19. Any Other Business Jay Holcomb (Itron)

  20. Adjourn • The next face to face meeting of the 802.18 RR-TAG will be at the IEEE 802 Plenary 10-12 July 2018 at the Grand Hyatt, San Diego. • Next teleconference: 19 July 2018 – tbd ET • Call in info: https://mentor.ieee.org/802.18/dcn/16/18-16-0038-09-0000-teleconference-call-in-info.pptx or the latest. • Note: If the call-in link doesn’t work send the Chair an email right away. • All changes/cancellations will be sent out to the 802.18 list server. • : No teleconference on 19 July • Adjourn: • Any objection to Adjourn. • None heard, we are Adjourned at 15:29 ET • Thank You Jay Holcomb (Itron)

  21. Jay Holcomb (Itron) Safe Travels Back up and/or previous slides follow

  22. IEEE SA position statement • The IEEE-SA BoG SPCC reviewed and discussed the draft Spectrum Use position statement we have reviewed the past months (18-18/0010r03). It agreed to move it forth to the BoG for its approval at the 9 July meeting--with the addition of text addressing shared spectrum. • The text was sent to the 802.18 list server on 20 June for feedback, none was received. • https://mentor.ieee.org/802.18/dcn/18/18-18-0010-04-0000-sa-use-of-spectrum-draft-position-06dec17.docx • Since then, the IEEE 802.22 Chair has suggested a few more updates and we will review all the updates, lines 22 - 41. The document is: https://mentor.ieee.org/802.18/dcn/18/18-18-0010-05-0000-sa-use-of-spectrum-draft-position-06dec17.docx • Note: the IEEE 802 chair has asked for clarity on how the different IEEE 802 standards and projects are stated. So some editorials could be coming. • The latest version was a reviewed and a few minor editorial edits were done. Jay Holcomb (Itron)

  23. Motion SA position statment • Motion: To approve revised document 18-18/0010r0___, RR_TAG Marked up Draft IEEE-SA Position Statement on “Additional Spectrum Needed” for review and approval by the EC for sending to the IEEE-SA. The Chair of 802.18 is authorized to make editorial changes as necessary. • Move by: • Second by: • Discussion: None • Vote: ___ Yes _0__ No _0_ Abstain • Motion:Passed Jay Holcomb (Itron)

  24. keep in mind for future • Links to EU sites: • Bran: https://portal.etsi.org/tb.aspx?tbid=287&SubTB=287 • ERM TG-11: https://portal.etsi.org/tb.aspx?tbid=442&SubTB=442 • CEPT SE45: https://cept.org/ecc/groups/ecc/wg-se/se-45/client/introduction/ • CEPT FM57: https://cept.org/ecc/groups/ecc/wg-fm/fm-57/client/introduction/ • OJEU: https://eur-lex.europa.eu/oj/direct-access.html • HS: https://ec.europa.eu/growth/single-market/european-standards/harmonised-standards/ • Ongoing / future actions: • For WRC-19 AI 1.13 on IMT, • all - send out additional comments to support our viewpoint to not have an IMT designation for 66 – 76 GHz, to send to regulator asking. • Comments for the IEEE EU position paper on Spectrum Management. • All please continue to send proposed revisions to the .18 chair as you can. • .18 chair will review with IEEE 802 chair. • WiFi / UWB 6 and 4 GHz co-existence. • All please continue to send possible criteria and high level use cases to .18 chair. • Teleconferences, The .18 chair will bring up in July plenary to move the teleconferences 30 mins later. • IEEE 802 considering to put together a document on basic spectrum parameters that would be good for all IEEE 802 standards in general, to bring up as appropriate when doing comments, etc. Jay Holcomb (Itron)

  25. FCC FNPRM 4.9 GHz • PUBLIC SAFETY AND HOMELAND SECURITY BUREAU ANNOUNCES COMMENT AND REPLY COMMENT DATES FOR THE SIXTH FURTHER NOTICE OF PROPOSED RULEMAKING ON THE 4.9 GHZ BAND AND CONSOLIDATES DOCKET NUMBERS FOR ALL FUTURE 4.9 GHz BAND MATTERS • WP Docket No. 07-100, PS Docket No. 06-229, WT Docket No. 06-150, DA 18-468 • https://www.federalregister.gov/documents/2018/05/07/2018-09416/49-ghz-band?utm_campaign=subscription%20mailing%20list&utm_source=federalregister.gov&utm_medium=email • PN: https://apps.fcc.gov/edocs_public/attachmatch/DA-18-468A1.pdf • https://mentor.ieee.org/802.18/dcn/18/18-18-0051-00-0000-fcc-pn-4-9-ghz-da-18-468-fcc-18-33-wp-07-100.docx • FNPRM: https://ecfsapi.fcc.gov/file/03231913715191/FCC-18-33A1.pdf • https://mentor.ieee.org/802.18/dcn/18/18-18-0052-00-0000-fcc-fnprn-4-9-ghz-fcc-18-33-wp-07-100.pdf • https://www.fcc.gov/ecfs/search/filings?q=(proceedings.name:((07%5C-100*))%20OR%20proceedings.description:((07%5C-100*)))&sort=date_disseminated,DESC • Comments Due: July 6, 2018; (Approve by 21 June) Reply Comments Due: August 6, 2018 • At this time, not seeing IEEE 802 has an interest, with the narrow bandwidth of this proceeding. • With no one has expressing any interest to comment, will move to the backup slides for now. Jay Holcomb (Itron)

  26. FCC NPRM 2.5 GHz -1 • Amendment of Parts 1, 21, 73, 74 and 101 of the Commission’s Rules to Facilitate the Provision of Fixed and Mobile Broadband Access, Educational and Other Advanced Services in the 2150-2162 and 2500-2690 MHz Bands (WT 03-66, terminated) • Transforming the 2.5 GHz Band (WTB 18-120) • Comments due: 30 days; Reply comments due: 60 days • https://www.fcc.gov/ecfs/filing/0510125420096 • https://www.fcc.gov/ecfs/search/filings?proceedings_name=18-120&sort=date_disseminated,DESC • Any interest? No one has expressed any interest to comment, had moved to the backup slides for now. • Though just now, been posted in the Federal Register with dates. • https://www.federalregister.gov/documents/2018/06/07/2018-12183/transforming-the-25-ghz-band?utm_campaign=subscription%20mailing%20list&utm_source=federalregister.gov&utm_medium=email • Comments due: 06 Aug 2018 Jay Holcomb (Itron)

  27. FCC NPRM 2.5 GHz -2 • The 2.5 GHz band (2496-2690 MHz) constitutes the single largest band of contiguous spectrum below 3 gigahertz and has been identified as prime spectrum for next generation mobile Federal Communications Commission FCC 18-59 2 operations, including 5G uses.1 Significant portions of this band, however, currently lie fallow across approximately one-half of the United States, primarily in rural areas. Moreover, access to the Educational Broadband Service (EBS) has been strictly limited since 1995, and current licensees are subject to a regulatory regime largely unchanged from the days when educational TV was the only use envisioned for this spectrum. Today, we propose to allow more efficient and effective use of this spectrum band by providing greater flexibility to current EBS licensees as well as providing new opportunities for additional entities to obtain unused 2.5 GHz spectrum to facilitate improved access to next generation wireless broadband, including 5G. We also seek comment on additional approaches for transforming the 2.5 GHz band, including by moving directly to an auction for some or all of the spectrum.... Jay Holcomb (Itron)

  28. A Future For Unlicensed Spectrum – from last week • A perspective on regardless of everything we do to develop new, better, faster wireless technologies, the available spectrum has a hard limit • See: https://mentor.ieee.org/802.18/dcn/18/18-18-0060-02-0000-a-future-for-unlicensed-spectrum.pptx • Will review and discuss • The idea is to cover the entire spectrum in the database, all of it. • Then knowing what frequency range the device is in and geographic location, can manage the users. • Similar idea years back were not fully accepted, though with recent actions, e.g. 6GHz, a data base maybe viewed differently now. • Should look at the CBRS database and what can we learn from it. • This is a long term effort, and need to start to put all the pieces together, before going to regulators. • 3550 filings of interest: • Google October 2017 overall summary • https://ecfsapi.fcc.gov/file/10160477327041/2017-10-16%20Ex%20Parte%20(GN%2012-354%20RM-11788%20RM-11789).pdf • Slide 16 SAS providers & carriers have developed a mutuall satisfactory legal agreement covering confidential data • Appendix A:Wireless Innovation Forum and SAS and CBSD Standards Development • https://ecfsapi.fcc.gov/file/60001854348.pdf Jay Holcomb (Itron)

  29. A Future For Unlicensed Spectrum-2 • A perspective on regardless of everything we do to develop new, better, faster wireless technologies, the available spectrum has a hard limit • A presentation is being prepared for IEEE 802.11 WNG at the plenary in San Diego in July. • https://mentor.ieee.org/802.11/dcn/18/11-18-1055-00-0wng-a-future-for-unlicensed-spectrum.pptx • This presentation is more standards based, where the 802.18 version was more regulatory based. Jay Holcomb (Itron)

  30. A Future For Unlicensed Spectrum • A perspective on regardless of everything we do to develop new, better, faster wireless technologies, the available spectrum has a hard limit • See: https://mentor.ieee.org/802.18/dcn/18/18-18-0060-02-0000-a-future-for-unlicensed-spectrum.pptx • The most recent document is: 11-18/1055rxx • We reviewed and discussed the latest .11 version for Plenary WNG in San Diego. • The idea is to cover the entire spectrum in the database, all of it. • Then knowing what frequency range the device is in and geographic location, can manage the users. • Similar idea years back were not fully accepted, though with recent actions, e.g. 6GHz, a data base maybe viewed differently now. • A perspective on regardless of everything we do to develop new, better, faster wireless technologies, the available spectrum has a hard limit Jay Holcomb (Itron)

  31. Potential reference document when doing comments • Note: in the 802.19 co-existence <1 GHz meeting it was brought up for IEEE 802 as a whole to put together a document on basic spectrum parameters that would be good for all IEEE 802 standards to co-exist (less interference….) • Actually, need to have this for all IEEE 802 to just work in the spectrum, e.g. BWs needed. Not just coexistence. • Point being that 802.18 can refer to / use when responding to regulators on different consultations, to encourage regulators in general to configure their spectrum to allow all the IEEE 802 standards in a more consistent/friendly way. • For the many in attendance, it was felt many regulators would appreciate at least knowing this. • Additional point to add to the doc, duty cycle is not for the protocol/standard/amendment being discussed, it is a regulation to allow others (and their packet lengths) to have access to the spectrum. Jay Holcomb (Itron)

  32. WiFi / UWB Coexistence -1 • IEEE 802.19 and other WG chairs are working on IEEE 802 single voice. • From a high level, could we list out some of the following. • Do not want to get into detail, just high level points to consider to help. • What criteria should be considered? • Power out needed, different for each technology. • Bandwidth considerations. • Channel sense, e.g. LBT. • Incumbent protection. • Interference types, blocks .vs. range decrease. • Operational ranges themselves. • Different modulation types . • Tuning range of UWB (global considerations). • Thursday: • Is there a way to ID that UWB is there and transmitting? Jay Holcomb (Itron)

  33. WiFi / UWB Coexistence -2 • What Use Cases should be considered? • Higher speed (wider BWs) for WiFi users, e.g. streaming video, etc. • Global availability (S. Korea just this week consultation 6 – 10.2 GHz for UWB) • UWB applications - Many (See 15-17/0660), e.g. location is a significant use case. • Where devices are used, height, indoor/outdoor, etc. • Review 15.2 co-existence of WiFi / BT / … • Co-located in a device, and non-co-located. • Thursday: • Nothing new. Jay Holcomb (Itron)

  34. IEEE EU Position Statement -1 • IEEE European Public Policy Position Statement on Spectrum Management • https://mentor.ieee.org/802.18/dcn/18/18-18-0028-00-0000-draft-ieee-european-public-policy-position-statement-on-spectrum-management.pdf • We are being asked to review this statement, similar to the one in November, though some focus for the EU. Guidance is to review and comment in detail. • Document 18-18/0028rxx, latest revision is our current review markup. • Please send comments to .18 chair, to integrate, to be reviewed by the TAG. • Becoming clearer the starting premise of the current paper is from several years ago and input is coming in the premise has changed in recent years. • With that trying to understand how to propose edits to the paper. Jay Holcomb (Itron)

  35. IEEE EU Position Statement -2 • Went through 18-18/0028r01 review copy, the remaining sections we have not reviewed and found a couple of specific areas that need clarity. • And brought audience up to speed on point premise of paper is from a few years back and had agreement with those that spoke up. • Some general questions: • Should the IEEE SA (the position statement we reviewed in November and January) and the IEEE EU collaborate on these 2 separate position statements in some fashion? • Then move above them. (.18 should still review) • What was original driver to do the statement? • Who is the general audience it is written for? • As it is, there is a concern if it is sent out and organizations our members are working with, CEPT, BRAN, etc. it will cause confusion, and more. • Request that anyone with specific input to continue to please pass on to the .18 chair, sooner. • .18 chair will cleanup the review revision of the paper (should end up r02) and ask the IEEE 802 chair for further guidance on next steps. Jay Holcomb (Itron)

  36. Motion – EU Spectrum Management • Motion: To approve document 18-___/00____r__, IEEE 802 comments on IEEE European Public Policy Position Statement (18-18/0028r00), with the 802.18 Chair having editorial privileges. Then send to the EC for approval and return IEEE EPPC WG. • Moved by: • Seconded by: • Discussion? • Vote: ___Y / ___N / ___A Jay Holcomb (Itron)

  37. Fellowship Request • Fellowship request on reaching out to all regulators. • Enhancing Collaboration between IEEE 802 and World Regulators on unlicensed spectrum regulations • https://mentor.ieee.org/802.11/dcn/18/11-18-0580-01-coex-enhancing-collaboration-between-ieee-802-and-world-regulators-on-unlicensed-spectrum-regulations.pptx • Thursday: • A start is to keep in touch with the fellowship attendees. • They are welcome to our meetings and calls. • Could something be added to the IEEE newsletter/communication for the regulators, to answer the news letter input? • Can IEEE be more pro-active with some of the other (e.g. regional) regulators? • The challenge is to ID which we can, and being a volunteer / individual organization, the time and money from the volunteers? • Many regulators don’t have IEEE has a point of contact like they do with WFA or other implementing orgs do. Jay Holcomb (Itron)

  38. IEEE – not connected and underserved (from last week) • IEEE Connectivity Coalition • Internet Inclusion means that all stakeholders are engaged in the planning and implementation of technology systems; that all potential people impacted can access and have certain rights to understand the implications of the technology and know how to use it safely and ethically; and that with these technologies come more services, tools, increased information and opportunities to expand access for communities around the world. As digital technology is increasingly used for educational, employment, health, commercial and informational purposes, Internet Inclusion is critical for full engagement, participation and opportunity in the social, economic and civic life of society. • This ties into the effort brought up at the Chicago meeting on how to connect the 3.8B people, not connected today. • Stayed tuned as we learn more. • Rich will be talking to Senior Director, Technology Policy and International Affairs on this and what we can do. Jay Holcomb (Itron)

  39. IEEE 802 (.11) • AANI – review – informational • https://mentor.ieee.org/802.11/dcn/18/11-18-0583-00-AANI-aani-sc-closing-report-march-2018.pptx • The 802 Chair has asked that 802.18 stay in tune with the 802.11 ANNI SC. • In particular where they stand with IMT 2020. • A debated motion in the 802.11 closing to add to its scope for IMT 2020: • Approve that the AANI SC scope be modified to include the generation of a white paper and/or self evaluation assessing the performance of 802.11 against the IMT-2020 requirements for eMBB indoor hotspot and dense urban use case. • Result: 28-34-8 Fails Jay Holcomb (Itron)

  40. Jay Holcomb (Itron) IMT 2020: The buzz in the industry on future steps in mobile technology — 5G — has seen a sharp increase, with attention now focused on enabling a seamlessly connected society in the 2020 timeframe and beyond that brings together people along with things, data, applications, transport systems and cities in a smart networked communications environment. In this context, ITU and its partners, sharing a common community of interest, have recognized the relationship between IMT — International Mobile Telecommunication system — and 5G and are working towards realizing the future vision of mobile broadband communications. In early 2012, ITU-R embarked on a programme to develop “IMT for 2020 and beyond”, setting the stage for 5G research activities that are emerging around the world. Through the leading role of Working Party 5D, ITU’s Radiocommunication Sector (ITU-R) has finalized its view of a timeline towards IMT-2020. The detailed investigation of the key elements of 5G are already well underway, once again utilizing the highly successful partnership ITU-R has with the mobile broadband industry and the wide range of stakeholders in the 5G community.

  41. Jay Holcomb (Itron) IMT 2020-cont: In September 2015, ITU-R has finalized its “Vision” of the 5G mobile broadband connected society. This view of the horizon for the future of mobile technology will be instrumental in setting the agenda for the World Radiocommunication Conference 2019, where deliberations on additional spectrum are taking place in support of the future growth of IMT. ITU has a rich history in the development of radio interface standards for mobile communications. The framework of standards for International Mobile Telecommunications (IMT), encompassing IMT-2000 and IMT-Advanced, spans the 3G and 4G industry perspectives and will continue to evolve as 5G with IMT-2020. https://www.itu.int/en/ITU-R/study-groups/rsg5/rwp5d/imt-2020/Pages/default.aspx

More Related