SlideServe
Menu
Préférences
© SlideServe · v2026

Information Systems Debriefing: Project Side Effects and Phase 2 Suggestions

conley avatar
12 diapositives · 251 Views · Oct 09, 2014

This project debriefing covers soft skills training, team collaboration, bug handling, time management, and database integration. Learn from real-life challenges and prepare for Phase 2 improvements. Password-protected deliverables in PDF and ZIP formats.

Information Systems Debriefing: Project Side Effects and Phase 2 Suggestions - slide 1
01 / 12Information Systems Debriefing: Project Side Effects and Phase 2 Suggestions
1 / 17

Télécharger la présentation

Information Systems Debriefing: Project Side Effects and Phase 2 Suggestions
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Introduction to Information Systems Debriefing Project Phase 1

  2. The Project – Side Effects • Trains your soft skills • team work • deal with bugs, poor documentation, … • produce with limited time resources • project management and reporting • Results useful for you personally • Demo: • Project should be fun 

  3. Debriefing • First: work done is impressive!

  4. Bugs and Company • As expected real life is full of surprises • problem with 5MB limit • problem with Ebay • difficulties with SED • bugs in Pointbase • syntactic variations in Pointbase • …

  5. An Imperfect World • The data is not always of the quality you expect it to be (sometimes on purpose?) • more in this follows for Phase 2 • Conceptual Schemas • Redesigns (not a "problem with 'us'" ;-) ) • "Agreement" on schema • Some data didn't fit (trees) • Regular expressions are sensitive to changes

  6. Time Management • First phase was (not unexpectedly) very time consuming • Phase 2 and 3 should be better • Tradeoff between doing something "real" and saving time • Some groups reported on insufficient planning • Specialists in group for different tasks

  7. The practical side • Some adaptations for phase 2 • you will find more assistants on Friday • Password protection if desired • Experience report in PDF format • deliverable as ZIP file by email • Roman will have more information • Please use the News Group for Questions!

  8. Suggestions for Phase 2

  9. Database Integration • Combining data from different databases • collection of data (wrapping) • combination of data and generation of new views on the data (mediation) • Problem: heterogeneity • access, representation, content • Example revisited (Demo) • http://immo.search.ch/ • http://www.swissimmo.ch

  10. Suggestions for Phase 2 • When integrating data • no "perfect" database expected: output cannot be better as input! • partial matches from DBs are ok • data quality has no influence on grading!

  11. Suggestions for Phase 2 • Important • integration at schema level • observe and report the difficulties • planned: debriefing on database integration problems

  12. So • Good luck • and watch the time