1 / 21

H-GAC Regional Goods Movement

H-GAC Regional Goods Movement. Prepared for Public Meetings- Round 3 presented by The Cambridge Systematics Study Team October 11-13, 2011. Why Invest in Goods Movement?. Essential for businesses All businesses depend on goods movement Influences business location decisions

corina
Télécharger la présentation

H-GAC Regional Goods Movement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. H-GAC Regional Goods Movement Prepared for Public Meetings- Round 3 presented by The Cambridge Systematics Study Team October 11-13, 2011

  2. Why Invest in Goods Movement? • Essential for businesses • All businesses depend on goods movement • Influences business location decisions • Essential for consumers • Products where we want them when we want them • Impacts prices we pay • Investing in the freight infrastructure leads to nearly $18 billion in efficiency gains by year 2035

  3. Transitioning from Needs to Recommendations Needs Recommendations

  4. Strategic Directions for Infrastructure Solutions

  5. Existing Deficiencies

  6. Invest in Existing Freight-Significant Corridors – Analysis Results • System Performance Benefits • Decreases hours traveled for trucks and cars • Increases average speed and reduces delay Source: H-GAC Travel Demand Model VMT – Vehicle miles traveled VHT- Vehicle hours traveled

  7. Investment Process for Freight-Significant Facilities • Near Term Solutions • Projects (included in regional or local plans) • Projects that can be implemented within 12 months • Medium-term Solutions • Interim solutions • Implemented over next 5-7 years • Long-term Solutions • Plan for Optimal Minimum Standards for Freight Facility/Intermodal Connector

  8. Invest in Access to New Growth Areas • Completion of Grand Parkway • Development of urban core relief and port connector route Fastest growing zone

  9. Invest in Access New Growth Areas – Analysis Findings • System Performance Benefits • Decreases hours traveled for trucks and cars • Increases average speed and reduces delay Source: H-GAC Travel Demand Model VMT – Vehicle miles traveled VHT- Vehicle hours traveled

  10. Invest in Access to New Growth Areas- Recommendations

  11. Analysis of Combined Approach- Existing Facilities and New Routes Improvement in Level of Service: Build to No-build, 2035 Source: H-GAC Travel Demand Model

  12. Monetized Travel Efficiency Benefits 2018-2035 – Preliminary Findings Source: CS analysis of H-GAC travel demand model output

  13. Invest in Multimodal Solutions

  14. Package of Freight Rail Improvements • Extend two main tracks through Belt Junction • Remove hold restrictions between Tower 26 and Cullen Blvd • Add 2nd mainline to freight main from Chaney Junction to Tower 26 • Add 3rd mainline for T&NO Junction and MP 235.00 • Add 2nd mainline to Buffalo Bayou (Bridge 16) • Add 3rd mainline from Belt Junction to Spring Junction • Add 2nd mainline from Spring Junction to BNSF Crossing

  15. Freight Rail Investments- Analysis Findings - Preliminary • Primary Freight Rail and Highway Efficiency Benefits • Secondary Commuter Rail Benefits Draft Findings Draft Findings Source: CS analysis of previous data Source: CS analysis of previous data and sketch level diversion analysis

  16. Operational Solutions

  17. Institutional Solutions Seek federal funding for freight investments

  18. Financing Freight Improvements: Case Studies Alameda Corridor – LA/Long Beach CREATE - Chicago Tchoupitoulas Corridor – Port of New Orleans Source: FHWA Financing Freight Investments

  19. Tchoupitoulas Corridor – Port of New Orleans New Dedicated Truckway to Port of New Orleans 4.3 miles, non-tolled Gated For Restricted Access (24 hour) Improvement to Existing Boulevard Relocated/Consolidated Rail Road Tracks Upgraded Existing Boulevard New Trucking Lanes Port Facilities

  20. Recommendation Screening

  21. Questions?

More Related