1 / 4

CALICE(-UK) Status

CALICE(-UK) Status. Paul Dauncey. News. Upcoming CALICE meetings DESY, possibly 29-30 Nov or 7-8 Dec (exact date TBD) Northern Illinois University (~40 miles from FNAL), 14-16 March. This will be following a FNAL ~2 hour “seminar” on CALICE to attract new US collaborators

ctapia
Télécharger la présentation

CALICE(-UK) Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALICE(-UK) Status Paul Dauncey Paul Dauncey

  2. News • Upcoming CALICE meetings • DESY, possibly 29-30 Nov or 7-8 Dec (exact date TBD) • Northern Illinois University (~40 miles from FNAL), 14-16 March. This will be following a FNAL ~2 hour “seminar” on CALICE to attract new US collaborators • Upcoming ILC meeting • LCWS05, SLAC, 18-22 March • Upcoming LC-UK meeting • Imperial, Tue 21 December; we will need a “Status of CALICE” speaker • CALICE organisational changes • Jose Repond has taken over from Rolf Heuer as chair of the Steering Board • Probably Felix Sefkow and/or Jae Yu will chair the Technical Board • David Ward is Software Coordinator and hence is on the Technical Board • See latest MoA, draft 7 (which Ken Peach is now prepared to sign) Paul Dauncey

  3. Electronics status • Production (i.e. final) boards sent for fabrication on Sept 8 • All nine PCBs fabricated, only first two populated with components • In principle, should have come back on Sept 28 • Some problems (?) at company (DDI) • Now expected tomorrow • The remaining seven boards will be populated when these two have been tested • Aim for end of October • Actual spend so far is £88k; main remaining costs are: • Populating the other seven boards ~£11k • Final DAQ PC and disk ~£12k • A few other test boards, cables, etc, are also needed ~£3k • Current final cost estimate is £114k compared to £111k granted • Not too bad; use travel to pay the difference Paul Dauncey

  4. Next steps • Short term plans • When the two boards are tested and new firmware debugged, we will move to Ecole Polytechnique for cosmics tests. (2 boards = 10 layers of Si-W) • Aim to do this before end of October (? Less likely given production delays) • When system working with cosmics, move to DESY for 6 GeV e– beam test • Aim to do this before end of November • Add more layers and more boards over next few months • Aim for full system (6 boards, 30 layers) by January • UK effort for this DESY beam test needs to be organised soon • Longer term plans • AHCAL was supposed to be assembled by Easter, ready for beam test at FNAL in summer 2005 • Delays in SiPM production (?), schedule isn’t clear; maybe later in 2005? • FNAL testbeam proposal (written mainly by George, David and Nigel) for next summer submitted to FNAL; could use ECAL alone • DHCAL is still claiming 2006 for beam tests, but US funding not secure yet Paul Dauncey

More Related