An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ship repair yards Data source: LRFairplay Jakub Walenkiewicz 29.04.2008

  2. Content • The world fleet – recent changes • Ships in operation – what does it take to keep them running • Ship repair yards – estimated workload • Main challenges ahead © Det Norske Veritas AS. All rights reserved

  3. The World Fleet © Det Norske Veritas AS. All rights reserved

  4. Contracting © Det Norske Veritas AS. All rights reserved

  5. Orderbook accumulated 370% of growth ! © Det Norske Veritas AS. All rights reserved

  6. Orderbook accumulated 500% of growth! © Det Norske Veritas AS. All rights reserved

  7. Annual deliveries © Det Norske Veritas AS. All rights reserved

  8. Vessels sold for scrapping Source: Fearnleys © Det Norske Veritas AS. All rights reserved

  9. 0 % 3 % 8 % The World Fleet © Det Norske Veritas AS. All rights reserved

  10. Ships in operation © Det Norske Veritas AS. All rights reserved

  11. Maintenance • Special surveys • known as class renewals • every fifth year of a vessel’s operation • as a vessel gets older, surveys gradually take more time • cover hull, propulsion, machinery, equipment and installation inspections and repairs • always require dry docking • Intermediate surveys • ships have to by docked every 2 – 2.5 years • predominantly hull and propulsion inspections and repairs • machinery, equipment and installation inspections, usually based upon manufacturer instructions • Conversions • Casualties © Det Norske Veritas AS. All rights reserved

  12. Ship repair yards - facts • It is estimated, that around 30% of the repair capacity has been converted to newbuilding • Fleet is growing by at least 8% per annum and may easily hit double digit growth • Ships get substantially bigger and naturally require bigger facilities (esp. super post panamaxes) • It is already nowadays difficult to get a slot in repair yards. Often ships are blocked for many days before they can be serviced What can we expect in such circumstances? © Det Norske Veritas AS. All rights reserved

  13. Methodology… DELIVERY DATE!!! © Det Norske Veritas AS. All rights reserved

  14. Estimated workload for Ship repair yards • Data: LRFairplay • Scope: All vessels in operation above 1000 DWT built after 1980/01/01 plus all vessels currently under construction (total orderbook) – roughly 43000 vessels; 1.02 million GT • No scrapping included, although it wouldn’t substantially change the picture • No forecast included. Data presented in the time span 2000 – 2020 • Estimated casualties added. Average 1200 vessels per year, corresponding to 20 mill. GT (based upon average from the past 5 years) © Det Norske Veritas AS. All rights reserved

  15. Estimated workload for Ship repair yards Estimated time for each survey © Det Norske Veritas AS. All rights reserved

  16. Workload – Index (number) 34% growth © Det Norske Veritas AS. All rights reserved

  17. 11200 vessels 15000 vessels Workload – number of vessels © Det Norske Veritas AS. All rights reserved

  18. 360 ships/day 490 ships/day Workload – number of vessels per day © Det Norske Veritas AS. All rights reserved

  19. Workload – Index GT 87% growth © Det Norske Veritas AS. All rights reserved

  20. 390 million GT 210 million GT Workload - GT © Det Norske Veritas AS. All rights reserved

  21. older ships 11.4 million GT 6.8 million GT Workload - GT per day © Det Norske Veritas AS. All rights reserved

  22. What can be done? © Det Norske Veritas AS. All rights reserved

  23. What can be done? Two simple solutions • Improve existing facilities – reduce time for dry docking • Build more ship-repair yards © Det Norske Veritas AS. All rights reserved

  24. Increased productivity? • Increased number of surveys and repairs during operation of a vessel • performed outside repair yards • reduces total time spent in a repair yard, but not the time in a dry dock • Increased prefabrication of steel in repair yards allowing quicker steel replacement • requires investment in yards’ steel workshops but… • New IMO/Class etc. requirements in most cases increase a scope of work that needs to be done • Shipyards already struggle to cope with the current workload. Loads of improvements have been already implemented, including limiting time in dry docks © Det Norske Veritas AS. All rights reserved

  25. 9.8 million GT 6.8 million GT Estimated workload – 10% productivity increase © Det Norske Veritas AS. All rights reserved

  26. New repair yards? • The world fleet is growing much faster than it used to, hence more facilities will be necessary anyway • Even if all possible improvements in the existing facilities have been implemented, repair yards most likely will not be able to cope with the workload after 2011 • Large VLCC dock are not capable to accept super post panamaxes as well as cruise vessels due to the draft limitation © Det Norske Veritas AS. All rights reserved

  27. Ship-repair yards - Tankers 114% growth © Det Norske Veritas AS. All rights reserved

  28. Ship-repair yards - Bulkers 63% growth © Det Norske Veritas AS. All rights reserved

  29. Ship-repair yards - Containers 161% growth © Det Norske Veritas AS. All rights reserved

  30. Final remarks • Repair yards are already running over their normal capacity • Ships often do not get a full scope of necessary repairs • Average waiting time in ship repair yards is around 4 months • Super post panamax container vessels as well as big cruise ships can not enter most of the VLCC docks due to the draft limitation • New requirements put even a bigger pressure on repair yards due to extended scope of inspections and repairs • Lack of skilled seafarers often leads into a measurable condition of a vessel, which naturally increases workload for repair yards. TIME TO BUILD MORE SHIP REPAIR YARDS! do it quickly… © Det Norske Veritas AS. All rights reserved

  31. THANK YOU © Det Norske Veritas AS. All rights reserved