MCB Camp Lejeune. Transportation Projects Analysis, Charrettes & Design on the Fast Track Sreekanth (Sunny) Nandagiri, PE, PMP Ryan Eckenrode, PE, PTOE NCAMPO Annual Meeting May 3 rd , 2012. Base Details. Camp Lejeune – Jacksonville, North Carolina Established 1941

dalit
Télécharger la présentation

MCB Camp Lejeune

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MCB Camp Lejeune Transportation Projects Analysis, Charrettes & Design on the Fast Track Sreekanth (Sunny) Nandagiri, PE, PMP Ryan Eckenrode, PE, PTOE NCAMPO Annual Meeting May 3rd, 2012

  2. Base Details • Camp Lejeune – Jacksonville, North Carolina • Established 1941 • 244 square miles, 11 miles of beach • Greater than 180,000 people-Base and Jacksonville • 40,000 Marines • Base and surrounding community • Active duty, retired and civilian • $3 Billion in commerce every year Source: http://www.lejeune.usmc.mil/about/

  3. Project Overview • $30 Million-Indefinite Quantity Contract-NAVFAC (Naval Facilities Engineering Command ) • Utilities Design and Engineering • Utility-repair, replacement & upgrade • Each project had a separate “Mod” • Transportation Projects: • Road widening-Several corridors • Traffic capacity analysis-Synchro • Signal Design and ITS

  4. Transportation Projects • HP (Hadnot Point) Roads-Widening • Louis Road • Dogwood Street • Holcomb & McHugh roundabout / traffic circle • Piney Green Road-Widening • Gonzalez Boulevard Extension • Resurfacing of Streets

  5. Map Piney Green Rd Louis Rd Roundabout Gonzalez Blvd Ext Resurfacing

  6. HP Roads – Louis Road • 2 existing signals • Sneads Ferry • McHugh Blvd • Heavy congestion • Dogwood Street • Not a through street today

  7. HP Roads – Louis Road Recommendations • Add two more signals • Birch Street • Dogwood Street • Widen to three lanes • Complete Dogwood Street • Provides new link to commissary • FYA at 3 of 4 signalized intersections

  8. Roundabout – McHugh at Holcomb HOLCOMB North McHUGH

  9. Roundabout – McHugh at HolcombRecommendation

  10. Gonzalez Boulevard Extension • New location • Barracks under construction • Mess hall under construction • Would Provides link to French Creek between McHugh Blvd and Sneads Ferry Rd • Two lane section recommended • FYA at signalized intersection

  11. Piney Green Road • Alternative entrance into MCB Camp Lejeune • Main commercial truck entrance • Improvements at entrance control facility underway

  12. Piney Green Road - Recommendations • Widen to four lane section • Add additional exiting lane at entrance control facility • Non typical widening to avoid impacts to adjacent land uses • Status: Piney Green was bid as an option which NAVFAC has not awarded yet.

  13. Specs Intact • Does not include signal specifications • Signal specifications were added as needed to reflect NCDOT standards • Other standards also must be included • ASTM • NEC • NCDOT • Example: • Instead of referring to the NCDOT standards for foundations, detailed specifications were listed for excavation, concrete pouring, curing etc—Mast arm poles

  14. Charettes • Intense 2 day Design Charettes (20-25% design stage) between the Client and the Consultant • First day: • Initial discussion/Powerpoint presentation regarding the project • Consultant presents initial design and recommendations/alignment options • Client provides feedback/direction • Consultant captures the feedback using “smart boards” • Consultant analyzes the changes on that evening • Second day: • Consultant updates/modifies the presentation • Consultant gets the “buy-in” on the design concept • Client approves the concept

  15. Challenges • Flooding • Very flat and adjacent to the ocean • Steam vaults • Vehicular types • Cars • Military trucks (MRAPs) - 30+ tons weight • Tanks • Trains • Base access • Projects in parallel--Review process • High concentration of young drivers

  16. Challenges Continued • Vehicular patterns • Everyone arrives at 6AM and leaves at 3PM • No range for the peaks-It happens at once • Considered reversible lanes: • Piney Green • 80/20 Traffic split • Dropped because of operational challenges

  17. Pleasant Surprises of Working at MCB Lejeune • No ROW constraints as all Military property • Traffic very predictable, congestion early AM, lunch and late afternoon • Drivers stopping and allowing us to continue working • No speeding drivers • Review process was very formal • All utilities were owned by the Military-Coordination was easier

  18. Questions