Dynamic Traffic Assignment:

Dynamic Traffic Assignment:. Integrating Dynameq into Long Range Planning Studies. Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott Higgins, Peter Bosa – Portland Metro. Introduction. Current DTA Applications

danae
Télécharger la présentation

Dynamic Traffic Assignment:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott Higgins, Peter Bosa – Portland Metro

  2. Introduction Current DTA Applications • Immediate project impacts (e.g., lane closures, ramp openings, construction impacts, etc.) • Short term horizon DTA as a planning tool • Alternative analysis (multiple scenarios, comparative evaluation metrics) • Long term horizon

  3. Overview Motivation for change Assignment metrics Challenges Status Future plans and applications

  4. Motivation for Change • Congestion is a given. Assignment tools need to operate within that environment. • Decision metrics are changing • Queuing and path choice effects • Duration of congestion • Temporal characteristics matter

  5. Assignment Metrics -Static • Static assignment • Served us well, but • Shortcomings are becoming problematic

  6. Metrics - Static V/C ratios – PM 2 hr. Can exceed 1.0. Represent average conditions

  7. Metrics - Static Average speeds – PM 2 hr

  8. Metrics - Static PM 2-hr volume flows based upon average speeds for time period

  9. Assignment Metrics - DTA • Dynameq (DTA) • Addresses many of the shortcomings

  10. Metrics - DTA Incremental volumes: 6:30 – 6:35 p.m.

  11. Metrics - DTA Incremental volumes: 6:35 to 6:40 p.m.

  12. Metrics - DTA Incremental volumes: 6:40 to 6:45 p.m.

  13. Metrics – DTATemporal characteristics Vehicles per lane per hour Detector DTA Static

  14. Metrics – DTATemporal characteristics

  15. Metrics - DTA Queuing effects – 6:35 to 6:40 pm

  16. Metrics – DTATime –space diagram

  17. Metrics - DTATravel time trajectories

  18. Metrics - DTA • Potential for more “realistic” turns at intersections • Signal plans • Accounts for conflicting moves • Visualization/animation • Pricing strategies • Reliability

  19. Challenges Building staff expertise Adding network attributes Validation more work Base vs. future year temporal profile Scenario preparation time Computer run time

  20. Status Staff development • Read (DTA Primer) • Observe other studies • Develop expertise with other DTA software. (Note: We have recently added Dynameq capability). • Dynameq – tutorial and formal training Network development • Geometries • Attributes (signal locations, lanes/turn bays, etc.)

  21. Status Regional application - DynusT • Freeway focus, major highways • Consistent with cutline counts • Temporal profile checks Portal data - PSU INRIX • 2035 application

  22. Status Corridor application – Dynameq • Recent purchase – very early stages • Subarea has been created with INRO’s assistance • Knowledge building • Add signal plans in the heart of the corridor study area. Simpler intersection treatment outside the focal point. • 2035 application • Alternative analysis

  23. Near Term Applications East Metro Connection Plan • Dynameq corridor study • “test” application SW Corridor Study • Transit study • Lane removals

  24. Future Plans • Elevate DTA to “everyday tool” status • Use DTA to provide better input to microsimulation • Link to MOVES • Investigate transit treatment in DTA • Link to tour based model • “DASH” model very temporally based

  25. Thank you Questions?