An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of S1-Global • Slide-Jack Tuner Assembly • TTF-III Warm Coupler Assembly • Connection of Beam Pipes Eiji Kako (KEK, Japan) Webex meeting S1-G Global Design Effort

  2. Slide-Jack Tuner Assembly 23rd, March 2010’ MHI-05 MHI-06 Piezo Tuner & Load Sensor Slide-Jack Tuner Center Webex meeting S1-G Global Design Effort

  3. Slide-Jack Tuner Assembly MHI-07 23rd, March 2010’ MHI-09 Piezo Tuner & Load Sensor Slide-Jack Tuner End Webex meeting S1-G Global Design Effort

  4. Schedule of Warm Coupler Assembly 15 Mon ; am./pm. Arrival of Denis Kostin from DESY (Installation of Cryomodule-C in Tunnel) 16 Tue ; am. Meeting for Warm coupl. Assem. @ STF pm. Check &Preparation of Coupler Parts Set-up of Clean-booth & Pumping system 17 Wed; am./pm. Assembly of Warm Coupler (Z109) Assembly of Warm Coupler (Z108) 18 Thu ; am./ pm. Assembly of Warm Coupler (ACC011) Assembly of Warm Coupler (AES004) 19 Fri ;am./pm. Disassembly of Warm Coupler (AES004) Reassembly of Warm Coupler (AES004) Webex meeting S1-G Global Design Effort

  5. TTF-III Warm Coupler Assembly TTF-III Warm Coupler Photos by Toge-san Webex meeting S1-G Global Design Effort

  6. TTF-III Warm Coupler Assembly Webex meeting S1-G Global Design Effort

  7. TTF-III Warm Coupler Assembly March 19th , 2010’ Denis Kostin (DESY) Webex meeting S1-G Global Design Effort

  8. TTF-III Warm Coupler Assembly Z109 Z108 ACC011 AES004 March 23, 2010’ Webex meeting S1-G Global Design Effort

  9. Connection of Beam Pipefor Cryomodule-C Beam Pipe Scheduled in April, 6th - 7th Webex meeting S1-G Global Design Effort

More Related