1 / 19

XYZ Port Facility Maritime Security Drill

XYZ Port Facility Maritime Security Drill. Briefing for Players. date. Evacuation. Emergency Response – Contingencies. Drill D423. Scope Review of the previous drill Date, time, location Aim Objectives Desired outcomes Controllers Players Scenario

dcarlin
Télécharger la présentation

XYZ Port Facility Maritime Security Drill

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XYZ Port FacilityMaritime Security Drill Briefing for Players date

  2. Evacuation Emergency Response – Contingencies Drill D423

  3. Scope • Review of the previous drill • Date, time, location • Aim • Objectives • Desired outcomes • Controllers • Players • Scenario • Port Facility security instructions • Communications • Safety • Debrief • Update on the ISPS Code/local regulations • Developments in maritime security

  4. Review of Previous Port Facility Drill no. X/XX • Date conducted: • Objectives: • Lessons Learnt:

  5. Drill number: X/XX Date: Start Time: Location: Estimated End Time:

  6. Aim To enhance the proficiency of security staff in evacuating the port facility when ordered.

  7. Objectives • Port facility staff will be required to conduct evacuation according to the procedure and requirement in the PFSP.

  8. Desired outcomes • Staff will be able to: • Prepare the port facility for evacuation. • Carry out evacuation properly and expeditiously.

  9. Control Team • Chief Controller: Safety Manager, Mr. AAA

  10. Players • PFSO • Port facility security staff • Port facility operations staff • Building occupants

  11. Scenario A bomb threat has been declared in the and the building has been ordered to be evacuated.

  12. Port Facility Security Instructions

  13. Communications • Telephone • Walkie-Talkie • Player – Ch YY

  14. Code words

  15. Safety • Physical safety of personnel is paramount • Please walk calmly and quickly to the nearest exit and proceed to designated assembly point • Do not use the lifts • No pushing • Take care when walking down stairs.

  16. Debrief • Location: • Secretary: • Attendance

  17. Updates on the ISPS Code and • local Regulations

  18. Developments in Maritime Security

  19. Any questions ?

More Related