290 likes | 294 Vues
Capstone Project MIDAS PROJECT. Project Members. Supervisor. Teacher:Nguyễn Tất Trung. Teacher: Huỳnh Anh Dũng. Trần Mạnh Thụy. Lại Vũ Mão. Nguyễn Ngọc Khanh. Nguyễn Văn Hiển. Trần Đình Đức. Đỗ Xuân Bách. Table of content. 1. 2. 3. 4. 5. 6. 7. 1. Introduction Introduce CRM.
E N D
Capstone Project MIDAS PROJECT
Project Members Supervisor Teacher:Nguyễn Tất Trung Teacher: Huỳnh Anh Dũng Trần Mạnh Thụy Lại Vũ Mão Nguyễn Ngọc Khanh Nguyễn Văn Hiển Trần Đình Đức Đỗ Xuân Bách
Table of content 1 2 3 4 5 6 7
2. Project managementProject goal Scope Time Success Cost
2. Project managementProcess model always have a running version of the program Difficult in specify all requirement Save effort when requirement changed Limit time and experience
Trần Mạnh ThụyProject Manager Nguyễn Văn HiểnTeam Leader/Developer Lại Vũ MãoTeam Leader/Developer Nguyễn Ngọc KhanhTester Đỗ Xuân BáchDeveloper Trần Đình ĐứcTester Supervisor 2. Project managementProject organization Teacher:Nguyen Tat Trung Teacher: Huynh Anh Dung Project Manager
2. Project managementMilestone Intro R1 Project plan R2 Requirement R3 Design R4 Coding Unit testing Testing R5 User Manual R6
3. Requirement SpecificationUser requirement [1] X: has right [2] O: has NO right
3. Requirement SpecificationFunctional requirement • Manage data (manual by particular record and automatic by excel) • Insert • Update • Delete • View
3. Requirement SpecificationNonFunctional requirement • Usability • Reliability • Availability • Security • Maintainability • Portability • Success Criteria
5. TestingTest strategy • Test types: • Functional testing • User interface testing • Data Volume testing • Installation testing
6. Lesson learn • Requirement specify • Project management • Team work