An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT MANAGEMENT

  2. PROJECT MANAGEMENT ORGANIZATION • BASED ON THE NEEDS OF THE PROJECT AT VARIOUS POINTS IN THE DEVELOPMENT • MAJOR FUNCTIONS • ENGINEERING • PLANNING AND SCHEDULING • PROCUREMENT • CONSTRUCTION

  3. ENGINEERNG FUNCTION • INITIALLY IS CONDUCTED IN THE OFFICE ENVIRONMENT UNTIL THE PROJECT IS FUNDED • EXTENDS TO THE JOB SITE AS DESIGN PROCEEDS • MOVES TO THE JOB SITE WITH CONSTRUCTION • TYPICALLY HAS PROJECT AND DESIGN DIVISIONS

  4. PLANNING AND SCHEDULING FUNCTION • RESPONSIBLE TO DEVELOP THE PLAN FOR THE PROJECT TO COORDINATE ALL ACTIVITIES TOWARDS SPECIFIC GOALS • MONITOR PROGRESS TOWARDS GOALS • OVERALL PROJECT RESPONSIBILITY • NORMALLY MADE UP OF SUBSETS • INVOLVES ALL PROJECT PARTICIPANTS

  5. PROCUREMENT FUNCTION • RESPONSIBLE FOR PURCHASING AND DELIVERY OF ALL MATERIALS AND EQUIPMENT USED FOR THE PLANT CONSTRUCTION • PREPARE SPECIFICATION • LOCATE VENDORS/CONTRACTORS • SOLICIT BIDS • MAKE AWARDS • SUPERVISE SUPPLIERS

  6. CONSTRUCTION FUNCTION • RESPONSIBLE FOR ALL ACTIVITIES AT THE JOB SITE • MANAGE ALL CONSTRUCTION OPERATIONS • TEST THE FACILITIES PRIOR TO OPERATION BY THE CLIENT

  7. OFFICE ACTIVITIES • PRIMARY ACTIVITIES INCLUDE • DEVELOP THE CONCEPTUAL DESIGN • DEVELOP PLANNING AND SCHEDULING FOR THE PROJECT • DEVELOP THE DETAILED DESIGN • CREATE SPECIFICATIONS FOR EQUIPMENT PURCHASE AND SUBCONTRACT • DEFINE VENDORS AND CONTRACTORS.

  8. ENGINEERING PROVIDES ALL PROJECT DOCUMENTATION INCLUDING: BFDs PFDs UFDs P&IDs DETAILED DESIGN DRAWINGS FOR CONSTRUCTION TECHNICAL SPECIFICATIONS PLANNING & SCHEDULING PROVIDES ALL PROJECT SCHEDULES ENGINEERING PROCUREMENT OVERALL CONSTRUCTION, WITH DETAILS AS CONTRACTS ARE AWARDED EXPENDITURES OFFICE ACTIVITY DELIVERABLES

  9. EXAMPLE OF PROCUREMENT ACTIVITY • CAN APPLY TO EQUIPMENT, MATERIALS OR SUB-CONTRACT • SPECIFICATION PREPARATION

  10. EXAMPLE OF PROCUREMENT ACTIVITY • AWARD CONTRACT

  11. EXAMPLE OF PROCUREMENT ACTIVITY • EQUIPMENT FABRICATION PROCESS

  12. CONSTRUCTION FIELD ACTIVITIES • OVERALL ADMINISTRATION OF JOB • CONTROLS (PLANNING, SCHEDULING MONITORING) • ACCOUNTING (BUDGET, PAYROLLS, INVOICES, ETC.) • MATERIALS AND EQUIPMENT MANAGEMENT AND PROCUREMENT • RECEIVING, WAREHOUSING, ORDERING AND ALLOCATION • ERECTION EQUIPMENT UTILIZATION • SUBCONTRACTS ADMINISTRATION -INTEGRATION OF S/C ACTIVITIES INTO THE OVERALL PROJECT • PERSONNEL OPERATIONS FOR LOCAL DIRECT HIRE ACTIVITIES

  13. CONSTRUCTION CRAFTS ADMINISTRATION • CRAFT MANAGERS FOR DISCIPLINES - PIPING, ELECTRICAL, INSTRUMENT, WELDERS, ETC., USED IN EACH AREA • CRAFT PERSONNEL - PIPEFITTERS, IRONWORKERS, BOILERMAKERS, WELDERS, ETC. • QUALITY CONTROL - MONITOR ALL WORK TO ASSURE COMPLIANCE WITH FEDERAL, STATE AND PROJECT CODES. CONFIRM DIMENSIONAL INSTALLATION. CONFIRM PRE-COMMISSIONING TESTING.

  14. FIELD ENGINEERING FUNCTIONS • DEVELOP AND IMPLEMENT PROCEDURES FOR PRE-COMMISSIONING, COMMISSIONING, START-UP AND PERFORMANCE TESTING • REVISE AND COMPLETE OFFICE DESIGNS • MONITOR SUBCONTRACTORS FOR: • ADHERENCE TO CONTRACT PROVISIONS • CHANGE ORDER REVIEW

  15. CONSTRUCTION PHASE SCHEDULING - TIME = MONEY • OPTIMIZATION OF THE COST REQUIRED TO CONSTRUCT IS DEPENDENT ON TYPE OF JOB • GRASS ROOTS - OPEN AREA FOR CONSTRUCTION • EVERYTHING MUST BE DELIVERED TO THE SITE, PEOPLE, EQUIPMENT, MATERIALS, ETC. • NORMALLY FEW MAJOR PHYSICAL LIMITATIONS, BUT LIMITED LOCAL SUPPORT SERVICES • SITE PREPARATION - OCCURS ON THE ENTIRE FACILITY

  16. GRASS ROOTS CONSTRUCTION • PLANT AREA ALLOCATION - ADMINISTRATIVE BUILDINGS, LAY-DOWN AREAS, CENTRAL SHOPS, STORAGE AREAS, MAY BE RELOCATED DURING THE PROJECT AND SOME PERMANENT FACILITIES MAY ACTUALLY BE USED FOR CONSTRUCTION. • CONSTRUCTION SEQUENCE - CAN BE OPTIMIZED TO MEET CPM AND USE VARIOUS LEVELING TECHNIQUES TO EFFECTIVELY UTILIZE TRADES PERSONNEL, WHO MAY BE AVAILABLE IN LIMITED NUMBERS.

  17. CONSTRUCTION IN EXISTING FACILITY • REMOVAL OF EXISTING FACILITIES REQUIRED TO MAKE ROOM FOR NEW EQUIPMENT AND CONSTRUCTION • OFF-SITE WAREHOUSING TO ALLOW COORDINATED DELIVERY • CONSTRUCTION SEQUENCE INCLUDES ACCESS TO LARGEST COMPONENTS FIRST • CONNECTIONS TO EXISTING OPERATIONS AND UTILITIES FOR CONSTRUCTION, TESTING, PRE- COMMISSIONING, START-UP AND TESTING • SHUTDOWN AND REMOVAL OF REPLACED FACILITIES http://www.fotosearch.com/DGT074/cb044360/

  18. OTHER CONSTRUCTION SCHEDULING FACTORS • OFF-SITE EQUIPMENT FABRICATION - GENERALLY PREFERRED FOR ANY ITEM REQUIRING FORMING OR MACHINING OTHER THAN SIMPLE THREADING, CUTTING OR WELDING. • BETTER QUALITY • EASIER TO HANDLE EXOTIC MATERIALS • LIMITED IN TERMS OF SHIPPING FINISHED COMPONENTS AND SOME SHIPPING RISK • MODULAR CONSTRUCTION - SKID MOUNTED, SHOP- COMPLETE PACKAGES

  19. OFF-SITE EQUIPMENT FABRICATION ADVANTAGES • MAY REQUIRE ADDITIONAL COORDINATION SINCE FIELD FITTING IS LIMITED AND CONNECTION TO EQUIPMENT FROM OTHER VENDORS MUST BE COORDINATED. • PIPING - REQUIRES COMPLETED DESIGN PLUS COORDINATION TO DELIVER AS NEEDED FOR ERECTION. • STEEL - REQUIRES COMPLETE DESIGN INCLUDING FIELD FIT SUPPORTS FORMINOR PIPING AND ELECTRICAL COMPONENTS • ELECTRICAL - IDEAL METHOD WITH SHOP TESTING. TERMINATIONS MUST BE COORDINATED IN THE FIELD • INSTRUMENTATION - SAME AS FOR ELECTRICAL

  20. RESPONSILBILITIES DURING ERECTION & CONSTRUCTION • QUALITY CONTROL • MAINTAINENCE OF SCHEDULES • EQUIPMENT DELIVERY • MATERIALS • PERSONNEL • SAFETY & ENVIRONMENTAL CONSIDERATIONS • UPDATES OF ALL DOCUMENTATION TO AN AS-BUILT LEVEL http://www.constructionphotographs.com/stock-photos/special-construction-pictures/

  21. PRE-COMMISSIONING OF FACILITIES • LOCALIZED EQUIPMENT AND FACILITY TESTS • PIPING - PRESSURE LEAK TESTS AND RADIOGRAPHY OF WELDS • ELECTRICAL - CONTINUITY, CIRCUIT TEST, TERMINATIONS • ROTATING EQUIPMENT - ALIGNMENT, DIRECTION, LUBRICATION • INSTRUMENTATION - SIMULATION OF LOOPS • NON-ROTATING EQUIPMENT - PRESSURE LEAK TESTS, CODE STAMPS • CONCRETE - CORE TESTS http://www.lookswell.com/html/commercial.html

  22. COMMISSIONING OF FACILITIES • LOCAL INTEGRATED SYSTEMS TESTS • PIPING - FLUSH AND CLEAN LINES • OPERATION - SIMULATE LOCAL SYSTEMS AND CONFIRM GENERAL CAPACITY AND OTHER PERFORMANCE CRITERIA • CHECK ALL INSTRUMENTATION LOOPS AND SHUTDOWN INTERLOCKS FOR CORRECT CALIBRATION AND RESPONSE. • CHECK ALIGNMENT OF ALL ROTATING EQUIPMENT UNDER LOAD • INSPECT ALL EQUIPMENT FOR ABNORMAL WEAR AFTER INITIAL OPERATION • REMOVE ALL TEMPORARY STRAINERS AND CONNECTIONS USED FOR COMMISSIONING ONLY

  23. START-UP OF FACILITIES • ACTUAL OPERATION OF INTEGRATED PLANT SECTIONS • INITIAL OPERATION IN INDIVIDUAL AREAS TO PRODUCE PRODUCTS FOR DOWNSTREAM TESTING. TOTAL RECYCLE OR VENT TO STACK OPERATION • TRAIN OPERATORS AND REVIEW QUALITY OF OPERATING MANUAL DRAFT VERSIONS. http://www.uop.com/aromatics/3050.html