1 / 10

Aktuella prospekt Företagsetableringar 7 september 2011

Aktuella prospekt Företagsetableringar 7 september 2011. Magnus Lindgren Näringslivskontoret Östersunds kommun. Tre stora case. Ny myndighet; Myndighetsgemensamt servicecenter Träindustri i Brunflo Mega Datacenter = ”Serverhallarna”.

delila
Télécharger la présentation

Aktuella prospekt Företagsetableringar 7 september 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aktuella prospekt Företagsetableringar7 september 2011 Magnus LindgrenNäringslivskontoret Östersunds kommun

  2. Tre stora case • Ny myndighet; Myndighetsgemensamt servicecenter • Träindustri i Brunflo • Mega Datacenter = ”Serverhallarna”

  3. ? M USD3 x 25.000 m2946.000 MWh/år198.000 m3/år50 anställdafiber…Start juni 2012 (??)

  4. Östersund, Torvalla Industrial Park OWNER Municipality of Östersund LOCATION Östersund County of Jämtland 600 km north of Stockholm SITE CHARACTERISTICS Greenfield, undeveloped land, zoned and planned ready to go. The total area is 43 hectares, but can also be available in smaller lots. Buildable area max 30% of land area (129 000 m² or 1 388 000 ft² on 43 hectares). Distance to airport 14km CLIMATE Average temperature per year +3,7 °C. Maximum temperature 1996-2010 +29,1 C min -33,5 C POWER Today: Capacity to site 10 MW, 22 kV 20 MW within 3 months from order, 15 MW fully redundant. To be connected to existing substation 500 meters from the site Up to 70 MW within 18 months from order. A substation and a new 145 kV power line 2 km long, will be built CONNECTIVITY Redundant dark fiber is on the site border. Fiber providers are TeliaSonera, Norrsken,Trafikverket and TDC COOLING Cool climate,giving excellent conditions for free cooling.Water supplied from the Municipality waterline. A new watertower will be built 2012, 700 meters from the site. INCENTIVES Östersund is located in support area A, the highest incentive level in Sweden with a possibility for investment grant up to 35 %

  5. Historik • Ide, drömmar och förberedelser sedan 2005 • Marknadsföringsprojekt med Invest Sweden och Midscand • RFI mars 2010 • Besök maj 2010 • Besök februari 2011 • Runner up mars 2011 • Tillbaka i matchen juni 2011, nytt besök • Ständigt nya utmanande frågor under stark tidspress • Stort team med enormt engagemang, dagar, kvällar, helger och semester

  6. Effekter, Mega Datacenter i Östersund • Långsiktig investering som inte flyttar • Strukturellt viktigt med en strategisk och storskalig satsning av global gigant • Sysselsättning, bygg och anläggning + drift • Hög kompetens och höga löner • Inflyttning • Resor • Underleverantörer • Infrastruktur, el och fiber • Ständig teknikutveckling • Samarbete Mittuniversitetet, forskning? utbildning? • ”Östersund på kartan” • I kölvattnet; fler datacenters och IT-företag • Framtidstro • Välskött och ”snygg” fastighet

  7. FöretagslotsÖstersunds Kommun- Vi ger service till företag som vill utvecklas

More Related