Bay Region Bridges. 1,019 Total Structures 82 Scour Critical 61 Structurally Deficient 676 Bridges 343 Culverts. M-24 over Plum Creek Replacement. M-46 over Blumfield Creek Scour Protection. M-46 over Sucker Creek Replacement. Structurally Deficient Bridges. Improving Bridge Conditions.

demi
Télécharger la présentation

Bay Region Bridges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bay Region Bridges • 1,019 Total Structures • 82 Scour Critical • 61 Structurally Deficient • 676 Bridges • 343 Culverts M-24 over Plum Creek Replacement M-46 over Blumfield Creek Scour Protection M-46 over Sucker Creek Replacement

  2. Structurally Deficient Bridges Improving Bridge Conditions Scour Critical Bridges

  3. Statewide Pavement Condition

  4. Bay Region Pavement Condition

  5. What is the Condition of Michigan’s Roads?

  6. Bay Region Strategy • System Preservation and Safety Needs • Focus on Freeway System • High Volume and High Value Routes Transportation is one Key to Economic Development in the State of Michigan

  7. This is our goal… Pere Marquette Pedestrian Tunnel, Clare I-75 in Bay County US-10 @ Eastman Road, Midland US-127BR Roundabout, Clare

  8. This is our reality… I-69 over Dort Highway, Flint M-25 in Tuscola County I-75 in Arenac County

  9. MDOT’s 2014 - 2018 Road & Bridge Program Jason Garza, P.E. Mt. Pleasant TSC Cost & Scheduling Engineer/Project Manager

  10. Mt. Pleasant TSC 5 Year Plan 2014 – 2018 • Road R&R to 2018 • Road CPM to 2014 • Safety to 2018 • Bridge • CSM/CPM to 2015 • Rehab to 2016 • Replacement to 2018

  11. The Five Year Plan • Midland Roundabout in 2014 • Roundabout at M-30/US-10 in 2015 • US-127 in 2016/2017 • US-10 in Isabella County

  12. The Five Year Plan • Map showing locations as of today • Expect some shifting of projects to different years • Additional projects

  13. Bay Region Operational Initiatives Gregg Brunner, P.E. Bay Region Operations Engineer

  14. Mt. Pleasant TSC’s 2012 Accomplishments Bill Mayhew, P.E. Mt. Pleasant TSC Manager

  15. 2012 TSC Accomplishments: Construction • US-127 NB under Mannsiding Road • US-127 over US-127BR (Harrison) • US-127 NB under Mostetler Road • US-127 over US-127BR (Washington Rd) • 33.1 lane miles of roadway work • 44 miles of crack seal work • 1 carpool lot resurfaced • $7,400,000 of total construction work

  16. 2012 Accomplishments: Maintenance • MDOT Direct Forces • 30 miles of crack sealing • 50 concrete patches • 125 bumps ground down • 5 miles of spray chips (AMZ) • Breckenridge RR Crossing for paving/signage

  17. TSC Accomplishments: Contracted Maintenance • Shoulders on US-127BR (Mt. Pleasant) • M-46 over US-127 bridge approaches • M-46 drainage improvements @ Wheeler • US-10BR concrete patches in Midland

  18. TSC Accomplishments: Contracted Maintenance • US-127 Crossover removals in Gratiot County • Culvert cleanouts along M-61 in Gladwin County • Culvert liners along US-127 in Clare County • M-61 shoulders west of Harrison in Clare County • Shoulder work on US-10BR in Clare

  19. 2012 TSC Accomplishments: Operations • Clare Welcome Center is the most visited Welcome Center in the state • Maintenance, Traffic & Safety, Design and Welcome Center • 129 Construction Permits & Parades • 28 Work Zone Reviews • 3 Night Time Reviews

  20. 2012 Accomplishments: Design and Development US-10 Innovative Contracting

  21. US-10 Alternate Bid w/Bridges • Innovative Contracting • Alternate Pavement Bid • ATC approach for maintaining traffic • Contract Boilerplate Pilot Project • Corridor Approach • Freeway: Both Road and Bridge • Detour Impacts • Tourism • Stakeholder Engagement

  22. Contract Boilerplate Pilot Project # of Pages: 414 pgs 154 pgs 63% reduction File Size: 4.76 MB 1.62 MB 66% reduction Purpose is to store common letting data in one location rather than in each proposal and plan set. Links to this mutual data will be provided in e-Proposal.