An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITEP LCG infrastructure NEC’2009, Varna, Bulgaria Ivan Korolko (ITEP Moscow)

  2. LCG activities in ITEP • SA1 activities - EGEE3 project (E.Lyublev) • User Support (V.Kirichenko) • ITEP supports all LHC experiments very good connectivity with CERN based experts • Popularization of GRID in ITEP: PHOTON (SELEX experiment) Lattice (M.Polykarpov) FAIR facility (Y.Zaitsev)

  3. RDIG in 2009 (LHC only)

  4. ITEP operation during last 2 years

  5. User Support – ussup.itep.ru

  6. Ticketing system – glse.itep.ru

  7. Infrastructure • In operation since 2004 • CPU (605 KSI2k) : • 30WNs (P4-HT, 2.4 GHz, 2GB) • 20 WNs (2xdual-core 2.5 GHz, 8GB) • 16 WNs (2xquad-core 2.7 GHz, 16 GB) • SE – 150 TB dCashe pools (1-3 TB, 12x10 TB, 1x20 TB) • SL 4.7 (32bits) + SL5.3 (64bits) • SE connectivity – 2x1 Gb/s (rather low…)

  8. Starting point (P4 WNs)

  9. Modern Hardware

  10. Internet connectivity (~80% for LCG) In 2009 we plan to install new CISCO – 10 Gb

  11. ITEP computing centre • Reserve power line • New cooling system • Good connectivity (plan to improve) • Free space for further developments • Enthusiastic support team Waiting for first LHC data…