130 likes | 288 Vues
ALICE Forward Detectors Technical Design Report. Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI) J.J. Gaardhøje (NBI), ch J.Y. Grossiord (Lyon) T. Malkiewicz (Jyvaesk.) B.S. Nielsen (NBI) G. Paic (Mexico) W. Trzaska (Jyvaeskyla). FMD ’inner’ protype before dicing.
E N D
ALICE Forward DetectorsTechnical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI) J.J. Gaardhøje (NBI), ch J.Y. Grossiord (Lyon) T. Malkiewicz (Jyvaesk.) B.S. Nielsen (NBI) G. Paic (Mexico) W. Trzaska (Jyvaeskyla) Jens Jørgen Gaardhøje. NBI. ALICE-CR5
FMD ’inner’ protype before dicing 2 sectors of 512 strips Test structures on 6” wafer Hamamatsu Jens Jørgen Gaardhøje. NBI. ALICE-CR5
Bonding pads and bias resistors Jens Jørgen Gaardhøje. NBI. ALICE-CR5
ALICE-FMD inner sensor Jens Jørgen Gaardhøje. NBI. ALICE-CR5
First 3 inner sensors delivered at NBI-Feb 2005 TDR Specs: Full depletion voltage 50-100V Measure: full depletion voltage: 75 -80V. TDR specs: thickness = 310 μm +- 10 μm Measure: t= 323 μm +- 1 μm Jens Jørgen Gaardhøje. NBI. ALICE-CR5
First test of FMD inner Si sensors Full-depletion voltage: 75 V Measure: < 2.5 pF/strip (bulk) TDR Specs: < 3 μA Measure: < 0.3 μA < 0.3 nA /strip 168 hr long-term stability test of leakage current at 200V Jens Jørgen Gaardhøje. NBI. ALICE-CR5
FMD Hybrid card w. 8 x (128 ch) preamplifiers Jens Jørgen Gaardhøje. NBI. ALICE-CR5
VA_ALICE 128 ch preampl Jens Jørgen Gaardhøje. NBI. ALICE-CR5
Test of FEE card with 8 VA_ALICE preamplifier chips Jens Jørgen Gaardhøje. NBI. ALICE-CR5
FEE card test results TDR: C=0pF => N=310e-, C=25pF => N=410e- Measure: C=0pF : N=200e- Expect for C=25pF: N~300e- => S/N= 22400/300=75. I MIP 22400 e- 3.5 fC Gain 20 mV/fC => 20MIP 1.4 V Jens Jørgen Gaardhøje. NBI. ALICE-CR5
RCU-USB test at NBI with PC&TPC-FEE card Jens Jørgen Gaardhøje. NBI. ALICE-CR5
FMD milestones adjusted to new ALICE installation schedule • Production of VA_ALICE chip done • Delivery of prototype hybrid cards done • Delivery of prototype Si sensors Feb-05 done • Prototype digitizer boards produced April-05 • Lab tests Si-FEE-Digitizer-RCU Jun-05 • Rad. hardness studies of FEE&digitizer May-05 • Place Si production order Jun-05 • Delivery Si & FEE Nov-05 • Bonding at CERN Dec-05 • Mechanics RB26 completed Feb-06 • Full system test with DAQ Dec-05 • Sector (half ring) rad. test Jan-06 • Detector assembly RB26 Mar-06 • Detector assembly RB24 Jun-06 • Ready for installation RB26 May-06 • Ready for installation RB24 Sep-06 Jens Jørgen Gaardhøje. NBI. ALICE-CR5